Gold Terra Resource Corp. · TSXV:YGT

Gold Terra Resource — Investor Presentation (April 2026)

24 slides from Gold Terra Resource's investor presentation, April 2026

  1. Slide 1: Multi Moz Potential in Yellowknife, NWT

    TSX.V: YGT | OTCQX: YGTFF | Frankfurt: TX0 OTCQB: YGTFF Multi Moz Potential in Yellowknife, NWT LARGEST UNDER EXPLORED High Grade Gold Camp in Canada APRIL 2026 CORPORATE PRESENTATION www.goldterracorp.com

  2. Slide 2: Forward Looking Statement

    Forward Looking Statement Statements contained in this presentation that are not historical facts are "forward-looking information" or "forward-looking statements" (collectively, "Forward- Looking Information") within the meaning of applicable Canadian securities legislation. Forward Looking Informa

  3. Slide 3: Cautionary Statement

    Cautionary Statement This presentation does not constitute an offer, advertisement or solicitation for the purchase of securities. Further, this presentation has been prepared by Gold Terra Resources Corp. (“Gold Terra”) management and does not represent a recommendation to buy or sell securities. I

  4. Slide 4: Corporate Snapshot

    Corporate Snapshot Gold Terra Capitalization (in Millions) Shares Outstanding 468.7 Options 8.8 Yellowknife Project Fully Diluted Shares 477.5 Top Shareholders +30% Analyst Coverage 4

  5. Slide 5: Proven Exploration & Mine Building Team

    Proven Exploration & Mine Building Team Gerald Panneton, Chairman & CEO - Geologist with +35 years of Canadian and international experience. Founder, President & CEO of Detour Gold Corporation (2006-2013) Detour Lake project grew to over 16 Moz in reserves and within 30 Moz resources and brought int

  6. Slide 6: Why Yellowknife?

    FOCUSED STRATEGY WHY YELLOWKNIFE ? CAMPBELL SHEAR (CS) = 14 Moz @ 16-22 g/t YELLOWKNIFE 6th LARGEST HIGH GRADE GOLD CAMP (Timmins / Kirkland L / Val D’or / RL ) INFRASTRUCTURE – Hydro Power, airport Yellowknife town of 23,000 / Low-cost drilling (C$250/m) Con Mine Option = Brownfield Status Mining L

  7. Slide 7: Strategic Land Holdings: 70km Campbell Shear Gold Mineralized System

    Strategic Land Holdings 70km Campbell Shear Gold Mineralized System Yellowknife Gold Belt 1.8-Million Ounces Discovered 2022 Mineral Resource Estimate (MRE) 43-101 status Con Mine Option (CMO)Property • 109,000 Indicated Ounces • 432,000 Inferred Ounces 4 Deposits 20km north of town 1,207,000 Inferr

  8. Slide 8: Con Mine (1938-2003) 6 Moz @ 16-20 g/t

    Con Mine (1938-2003) 6 Moz @ 16-20 g/t Workforce Hydro Power Airports and Roads 8

  9. Slide 9: Focus on the Prolific Campbell Shear

    Focus on the Prolific Campbell Shear 2023 drilling focus was on Con Mine near surface where A 5 Moz the last MRE was the focus B 1 Moz Drilling Targets between surface and 500m vertical over 2km strike length: ▪ Yellorex North ▪ Yellorex Main Con Mine (1938-2003) Historic Production 1.0 Moz @ 20 g/t

  10. Slide 10: 2026 Priorities: Campbell Shear

    2026 Priorities Campbell Shear (CS) Historical Resources left in mine Evaluation at various cut off grade Yellorex Main area winter drilling CS extension North 103 Zone Updated Mineral Resource Estimate (Q3 2026) Preliminary Economic Assessment (PEA) Q4 Other winter targets of drilling on CS Yellore

  11. Slide 11: 2026 Drilling Program

    2026 Drilling Program Con Mine Option Property initial September 2022 MRE @ 2.5 g/t COG: UG Indicated 0.45 M tonnes averaging 7.55 g/t Au for 109,000 ounces contained gold UG Inferred of 2.0 M tonnes averaging 6.74 g/t Au for 432,000 ounces contained gold S N Drilling2026 –Q1 North (103) Level 2300

  12. Slide 12: Underground Cross Section 7900 looking North

    Underground Cross Section 7900 looking North 12

  13. Slide 13: CS – Close up Long Section looking West

    CS – Close up Long Section looking West S Robertson Shaft C1 shaft N North (103) CS L 2300 feet L 3100 feet ? GxT gram*meters 5-20 20-50 60m Campbell Shear 50-100 ++100 Long Section -1900 m GTCM23-055 12.7 g/t over 1.7m GTCM25-056a CS intersection 13

  14. Slide 14: Hole GTCM23-055 core showing the Campbell Shear

    Hole GTCM23-055 core showing the Campbell Shear from 2102 to 2118 metres Including 12.63 g/t over 1.7m (quartz veining): 14

  15. Slide 15: Winter 2026 Drilling – Yellorex Area

    Winter 2026 Drilling – Yellorex Area ▪ 2026 Winter drilling is targeting the Yellorex zone immediately south of the past producing Con Mine and Campbell Shear (CS) ▪ The drilling program aims to expand Gold Terra’s near surface 2022 Mineral Resource Estimate (MRE) on the Con Mine Option property. Fi

  16. Slide 16: New High-Grade Zones – Mispickel Area – North Belt

    New High-Grade Zones – Mispickel Area – North Belt 19 holes for 6,011 metres completed in 2022 (Not included in the last 2022 MRE) Extended gold mineralization in the Mispickel area with the addition of two new gold zones, MP-Ryan and Zone 14 (next slide for section) • GTWL22-002 = 19.00 g/t gold ov

  17. Slide 17: New MP Ryan Zone – Mispickel Area – Visible Gold

    New MP Ryan Zone – Mispickel Area – Visible Gold VG in GTWL22-002 VG in GTWL22-014 17

  18. Slide 18: Commitment to ESG

    Commitment to ESG Gold Terra is the recipient of the 2023 NWT MAX Environmental and Social Responsibility Award in recognition of exceptional efforts in supporting the 2023 NWT wildfire efforts Forward-Looking Community Relations Environmental • The City of Yellowknife Responsibility Engagement Plan

  19. Slide 19: Potential Timeline - Catalysts

    Potential Timeline - Catalysts 2021-25 2026 2027 2028 2029 Con Mine DRILLING POTENTIAL POTENTIAL POTENTIAL 36,000m +10000m FEASABILITY DEVELOPMENT PRODUCTION drilling Q1 MRE Q3 MRE 19

  20. Slide 20: 20

    20

  21. Slide 21: For more information, please contact

    For more information, please contact: Gerald Panneton Chairman & CEO gpanneton@goldterracorp.com Mara Strazdins Investor Relations Phone: 1-778-897-1590 | 1-416-710-0646 Strazdins@goldterracorp.com www.goldterracorp.com TSX.V: YGT | OTCQX: YGTFF | Frankfurt: TX0

  22. Slide 22: 2025 Drilling: Wedge Hole 56A Intersects Campbell Shear

    2025 Drilling: Wedge Hole 56A Intersects Campbell Shear Cross section showing wedge hole GTCM24-056A drilled from master hole GTCM24-056, intersected the Campbell Shear from approximately 2,665 to 2,707 metres downhole 22

  23. Slide 23: Campbell Shear Model

    Campbell Shear Model High Grade (+ 30 g/t Au) bordered by pinching quartz vein systems with lower grade intersections No question we are in the Campbell Shear and more drilling is needed 23

  24. Slide 24: Con Mine Option Property - Substantial Benefits To Unlock

    Con Mine Option Property - Substantial Benefits To UNLOCK Con Mine Option to purchase 100% Interest would have MAJOR BENEFITS • Mineral leases and surface rights. • Access to infrastructure, such underground openings and shafts, buildings, storage facilities Oct. 21, 2022, Technical Report and roads

Gold Terra Resource — Investor Presentation (April 2026) on 6ix