Azincourt Energy Corp · TSXV:AAZ
Azincourt Energy — Investor Presentation (September 2021)
23 slides from Azincourt Energy's investor presentation, September 2021
Slide 1: Uranium Exploration & Development
vvV SEPTEMBER 2021 vvV URANIUM EXPLORATION & DEVELOPMENT TSX.V: AAZ OTCQB: AZURF FSE: A0U2
Slide 2: Disclaimer
DISCLAIMER vvV vvV This presentation does not constitute or form part of any offer for sale or solicitation of any offer to buy or subscribe for any securities in Azincourt Energy Corp nor shall it or any part of it form the basis of or be relied on in connection with or act as any inducement to ent
Slide 3: Mission
MISSION vvV vvV • Azincourt Energy Corp pursues exploration and development projects that anchor the company in a globally critical space. • Clean trend initiatives are driving a paradigm shift in how future energy needs will be met. • Demand for the raw materials needed to produce cleaner and more
Slide 4: Management
MANAGEMENT vvV vvV Alex Klenman – President, CEO & Director • Mr. Klenman is an experienced junior mining executive whose career spans over 30 years in the private and public sectors. • Over the past decade he has held and continues to hold leadership roles with numerous publicly traded resource com
Slide 5: Management
MANAGEMENT vvV vvV Ted O’Connor, P.Geo – Director • Over 25 years experience in the uranium/lithium exploration Industry including 20 years with Cameco Corporation. • Former CEO and current member of the Board of Directors of Plateau Energy Metals (TSX.V: PLU). • 17 years as Director, Corporate Deve
Slide 6: Industry Overview
INDUSTRY OVERVIEW vvV vvV • The uranium market is on the cusp of significant supply deficits that will not be able to meet rising nuclear power demand. • Production costs far exceeding selling prices for many of the world’s uranium miners has led to an over 20% reduction in uranium mining production
Slide 7: Projects
PROJECTS vvV vvV East Preston Project - Saskatchewan, Canada • Azincourt controls majority interest (>70%) in the over 25,000-ha exploration project situated in the western Athabasca Basin, Saskatchewan, the world’s premier location for uranium mining • Large inventory of priority drill targets iden
Slide 8: The Athabasca Basin
THE ANTABASCA BASIN vvV vvV East Preston Project, Saskatchewan, Canada World-Class District: The largest, highest grade, uranium deposits in the world with up to 100 times world average Production History: Uranium mining and production for 40+ years Stable Political Climate: Pro-mining attitudes and
Slide 9: Western Athabasca
WESTERN ANTABASCA vvV vvV Area Market Caps • NexGen Energy - $3.39B CDN • Orano (Areva) - $1.99B USD • Cameco - $10.7BB CDN • Fission - $504M CDN • Denison - $1.4B CDN • UEX Corp - $219M CDN • Skyharbour Resources - $67M CDN • Purepoint Uranium - $42M CDN • Fission 3.0 - $25M CDN • Azincourt Energy
Slide 10: East Preston Project
EAST PRESTON PROJECT vvV vvV • Azincourt controls a 70% interest the Eastern portion of the Preston Project • The Preston Project is one of the largest tenure land positions in the Paterson Lake region • Strategically located near NexGen Energy Ltd’s high - grade Arrow deposit, Fission Uranium Corp’
Slide 11: East Preston Project: 2018 Geophysical Survey Results
EAST PRESTON PROJECT vvV vvV 2018 Geophysical Survey Results • In the winter of 2017-18 numerous, high-quality drill targets were generated through HLEM and Gravity geophysical surveys • The geophysical program consisted of 51.45 km of grid preparation, 46.05 km of horizontal loop electromagnetic (H
Slide 12: East Preston Project: Priority Targets
EAST PRESTON PROJECT vvV vvV Priority Targets – East Preston • This graphic shows multiple long linear conductors with flexural changes in orientation and offset breaks in the vicinity of interpreted fault lineaments – classic targets for basement-hosted unconformity uranium deposits • These are not
Slide 13: East Preston Project: VTEM Survey January 2019
EAST PRESTON PROJECT vvV vvV VTEM ™ Survey – January 2019 • A helicopter-borne Versatile Time-Domain Electromagnetic (VTEM™ Max) and Magnetic survey was completed over the southern portion of the East Preston Project to complete survey coverage over the entire 25,000+ hectare project area • Results
Slide 14: East Preston Project: Drill Programs
EAST PRESTON PROJECT vvV vvV Drill Programs • To date 4,178 meters in 17 holes have been drilled at East Preston. Limited drilling has confirmed basement lithologies and graphitic structures intersected at East Preston are very similar and appear to be analogous to the Patterson Lake South-Arrow-Hoo
Slide 15: East Preston Project: Winter Drill Programs
EAST PRESTON PROJECT vvV vvV 2020-2021 Winter Drill Programs • 2021 drill campaign was a planned 10-12 hole, up to 2500m, diamond drill program targeting the conductive corridor from the A-Zone through to the G- Zone and was based on a compilation of results from the 2019 and 2020 drill programs, 20
Slide 16: Hatchet Lake Uranium Project
HATCHET LAKE URANIUM PROJECT vvV vvV • Azincourt has entered into a definitive property option agreement with ValOre Metals Corp. pursuant to which the Company has been granted the option to acquire up to a seventy-five percent interest in the Hatchet Lake Uranium Project. • Hatchet Lake is 13,711-h
Slide 17: Hatchet Lake Uranium Project
HATCHET LAKE URANIUM PROJECT vvV vvV • Previous work includes geophysics, boulder, soil, lake sediment and bio- geochemical sampling. The project contains substantial historic exploration datasets with identified uranium anomalism and showings to help guide exploration programs. • Two high-priority
Slide 18: Hatchet Lake: Terms and Considerations
HATCHET LAKE URANIUM PROJECT vvV vvV Terms and Considerations Pursuant to the terms of the Option, the Company can acquire a seventy-five percent interest in the Project by completing a series of cash payments and share issuances to the Optionor, and incurring certain expenditures on the Project, as
Slide 19: Escalera Group – Puno, Peru
ESCALERA GROUP – PUNO, PERU vvV vvV • The Escalera Group consists of three concessions (Lituania, Condorlit, Escalera) covering a combined area of 7,400 hectares of prospective exploration targets for volcanic hosted supergene/surficial uranium and lithium on the Picotani Plateau, Puno district, sou
Slide 20: Escalera Group: 2018 Exploration Results
ESCALERA GROUP – PUNO, PERU vvV vvV 2018 Exploration Results • First phase groundwork included detailed reconnaissance to locate favorable outcroppings and known host rock formations, focused ground radiometric geophysical surveys using hand portable scintillometers to test for elevated radioactivit
Slide 21: Escalera Group – Puno, Peru
ESCALERA GROUP – PUNO, PERU vvV vvV • A total of 113 rock samples were collected during the three-week long reconnaissance sampling and prospecting program; with a total of 94 rock samples collected on the 5,500-hectare Escalera Property • To ascertain the potential for uranium enrichment in the tar
Slide 22: Capital Structure
CAPITAL STRUCTRE vvV vvV As of November 11, 2021 As of Septemb Common Shares 483,033,463 Options to purchase common shares 12,790,000 Warrants to purchase common shares 257,858,848 • Potential funding from warrant exercise – approximately $22M CDN • Current cash on hand - $12M + Major Shareholder Ow
Slide 23: Contact
vvV vvV vvV Suite 1430 – 800 West Pender Street Vancouver, B.C. V6C 2V6 Corporate Communications Danica Topolewski (604) 638-8063 info@azincourtenergy.com azincourtenergy.com azincourtaaz azincourtenergy TSX.V: AAZ OTCQB: AZURF FSE: A0U2 TSX.V: AAZ OTCQB: AZURF 22
Azincourt Energy — Investor Presentation (September 2021) on 6ix