Azincourt Energy Corp · TSXV:AAZ
Azincourt Energy — Investor Presentation (September 2025)
21 slides from Azincourt Energy's investor presentation, Sep 2, 2025
Slide 1: Advanced Uranium Exploration & Development in Canada's Central Mineral Belt and Athabasca Basin
ADVANCED URANIUM EXPLORATION & DEVELOPMENT IN CANADA’S CENTRAL MINERAL BELT AND ATHABASCA BASIN TSX.V: AAZ OTC: AZURF FSE: A0U2
Slide 2: Azincourt Energy – Strategic Uranium Exploration in Canada
AZINC OU RT E NERGY – STRATEGIC URANIU M E XP LORATION IN C ANADA ▪ Azincourt Energy specializes in the strategic acquisition, exploration, and ▪ Canada, as development of clean energy/fuel projects. Our focus is on advanced but the world’s under-explored uranium projects with significant upside pot
Slide 3: The Uranium Supply Gap – Why Uranium, Why Now?
THE URANIUM SUPPL Y GA P – WHY URANIUM, WHY NOW ? ▪ Global energy demand is Fig 1 ▪ After the Declaration to Triple Nuclear Energy was formed at COP28 and increasing rapidly, driven joined by 31 nations including the US, Canada and the UK, the number of by population growth, the global nuclear react
Slide 4: Leadership Team
LE ADE RSH IP TEAM Alex Klenman C. Trevor Perkins, P.Geo Paul Reynolds, P.Geo John Fraser President, CEO & Director VP of Exploration Director Director ▪ Experienced junior mining ▪ Geologist with 25+ years ▪ Geoscientist with 30+ years ▪ 20+ years experience in the executive with 30+ years in explo
Slide 5: Project Portfolio – Harrier Uranium Project
Harrier Uranium Project – Central Mineral Belt, Newfoundland and Labrador, Canada ▪ Azincourt has acquired the PR OJECT Harrier Uranium Project in PORTFOLIO Canada’s highly prospective Central Mineral Belt. ▪ 49,400 hectares covering Cen tr al 12 mineralized uranium zones, including grades M in eral
Slide 6: The Harrier Project: Jurisdiction – Central Mineral Belt, NL
THE H ARRIE R PROJE CT: JU RISDIC TION – CE NTRAL MINE RAL BE LT, NL ▪ Tier 1, World-Class District: The Central Mineral Belt in Canada’s Newfoundland & Labrador province is a 260km X 75km belt of proven mineral occurrences SNEGAMOOK PROJECT containing multiple large-scale uranium deposits, includin
Slide 7: The Harrier Project – Overview
THE H ARRIE R PROJE CT – OVE RVIEW THE SNEGAMO OK PRO JECT – OVERVIEW Previous exploration (Koba Resources, Uranidor Resources) identified 12 uranium mineralization zones throughout the project, including: ▪ Fish Hawk North: up to 5.08% U₃O₈ ▪ Brook: up to 4.86% U₃O₈ ▪ Moran Heights: up to 7.48% U₃O
Slide 8: The Snegamook Deposit – Overview
THE SNEG AMOOK DEP OSIT – OVE RVIEW THE SNEGAMO OK PRO JECT – OVERVIEW Advanced Project with potential for new discoveries ▪ Acquired by Azincourt in October 2024. ▪ 3 km along strike and southeast of the Two Time Zone deposit (Indicated and Inferred resource of 5.55 Mlb U3O8, June 2008). ▪ Previous
Slide 9: The Snegamook Deposit – Geology of Uranium Mineralization
THE SNEG AMOOK DEP OSIT – GE OLOGY OF URANIUM MINE RALIZATION THE SNEGAMO OK PRO JECT – OVERVIEW ▪ Four mineralized uranium lenses were discovered at ▪ Zones appear to be disrupted to the south ▪ Two drill holes (SN-08-18 and SN-08-20) tested a radon Snegamook in 2008. The lenses are shallow and dow
Slide 10: The Snegamook Deposit – Summary of Previous Exploration
THE SNEG AMOOK DEP OSIT – SUM MARY OF PRE VIOUS E X PLORATION THE SNEGAMO OK PRO JECT – OVERVIEW ▪ Silver Spruce Resources conducted airborne radiometric and magnetic surveys, follow-up prospecting, lake sediment and soil sampling, radon gas surveys, geological mapping, trenching, and diamond drilli
Slide 11: The Harrier Project & Snegamook Deposit – Exploration Plan
THE H ARRIE R PROJE CT & SNE GAM OOK DE POSIT – E XPLORATION PLA N THE SNEGAMO OK PRO JECT – OVERVIEW ▪ Prior exploration at the Harrier Project included rock sampling, airborne radiometric surveys, and limited drilling. No exploration work has been conducted at the Snegamook Zone since 2008. ▪ Azin
Slide 12: Project Portfolio – East Preston Uranium Project
East Preston Uranium Project – Athabasca Basin, Saskatchewan, Canada PR OJECT ▪ Azincourt controls the majority interest (~87%) in the 20,674-ha PORTFOLIO project, situated in the western Athabasca Basin, Saskatchewan, in an area containing over $20B in market cap. Athabasca Basin ▪ Project is locat
Slide 13: East Preston Project: Jurisdiction – Athabasca Basin, SK
E AST PRE STON PROJ EC T: J URISDICTION – ATH ABASCA BASIN, SK THE SNEGAMO OK PRO JECT – OVERVIEW ▪ World-Class District: The largest, highest grade, uranium deposits in the world with up to 100 times world average ▪ Production History: Uranium mining and production for 40+ years ▪ Stable Political
Slide 14: East Preston Project – Overview
E AST PRE STON PROJ EC T – OVE RVIEW THE SNEGAMO OK PRO JECT – OVERVIEW Highly prospective grassroots uranium Western Athabasca: Area Market Caps exploration project. Azincourt has conducted significant exploration work: ▪ NexGen Energy - $5.3B CDN ▪ Orano (Areva) - $1.99B USD** ▪ Airborne Geophysic
Slide 15: East Preston Project – Summary of Early Drilling
E AST PRE STON PROJ EC T – SUM MARY OF E ARLY DRILLING THE SNEGAMO OK PRO JECT – OVERVIEW Limited drilling (2014-2021) ▪ 5,743 m completed in 24 drill holes during several small programs over an eight-year period ▪ Limited drilling confirmed: ▪ Elevated uranium ▪ Favorable basement lithologies and g
Slide 16: East Preston Project – 2022 and 2023 Drill Programs
E AST PRE STON PROJ EC T – 2022 an d 2023 DRILL PROGRAM S THE SNEGAMO OK PRO JECT – OVERVIEW ▪ 8,070 m completed in 32 drill holes: ▪ Hydrothermal clay alteration identified in K- and H-Zone. ▪ K-Zone: Extensive dravite, illite and kaolinite clay alteration confirmed, alteration zone extends to a 15
Slide 17: East Preston Project – 2024 Winter Drill Program
E AST PRE STON PROJ EC T – 2024 WINTE R DRILL PROGRAM THE SNEGAMO OK PRO JECT – OVERVIEW ▪ 1,086m completed in four drill holes: ▪ K-Zone: Anomalous uranium enrichment and clay alteration confirmed and expanded. ▪ H-Zone: Alteration halo now extends to 3 km strike length. ▪ Regional Illite clay anom
Slide 18: Significance of Alteration
A D V A N C E D U R A N I U M EAS T PRES TON E X P L O R A T T I O N PROJECT Significance of & Alteration D E V E L O P M E N T I N C A N A D A 18 A zi nc ou rt E ner gy | T SXV : AA Z OT CQB : A ZURF | F SE : A 0U2 | A DVANCED URANIUM E XP LORAT IO N & DE VEL OPME NT IN CANADA | azincourtenergy.com
Slide 19: Capital Structure
CAP ITAL STRU CTU RE THE SNEGAMO OK PRO JECT – OVERVIEW A D V A N C E D Capitalization Table Major Shareholder Ownership U R A N I U M Common Shares 374,328,104 Warrants 175,193,817 E X P L O R A T T I O N Options 11,060,000 30% 50% RSUs 17,500,000 Retail Institutional Fully Diluted 578,081,921 & D
Slide 20: Disclaimer & Forward-Looking Statement
DISCLAIM ER & FORWARD-LOOKING STATEMENT This presentation does not constitute or form part of any offer for sale or solicitation of any offer to buy or subscribe for any securities in Azincourt Energy Corp nor shall it or any part of it form the basis of or be relied on in connection with or act as
Slide 21: Contact
Suite 1430 – 800 West Pender Street Vancouver, B.C. V6C 2V6 Corporate Communications Danica Topolewski (604) 638-8063 info@azincourtenergy.com azincourtenergy.com azincourtaaz azincourtenergy TSX.V: AAZ OTC: AZURF FSE: A0U2
Azincourt Energy — Investor Presentation (September 2025) on 6ix