Azincourt Energy Corp · TSXV:AAZ
Azincourt Energy — Investor Presentation (April 2024)
17 slides from Azincourt Energy's investor presentation, April 2024
Slide 1: Alternative Energy Exploration & Development
April 2024 vvV ALTERNATIVE ENERGY EXPLORATION & DEVELOPMENT Uranium & Lithium Projects in Canada TSX.V: AAZ OTCQB: AZURF FSE: A0U2
Slide 2: Disclaimer
DISCLAIMER vvV vvV This presentation does not constitute or form part of any offer for sale or solicitation of any offer to buy or subscribe for any securities in Azincourt Energy Corp nor shall it or any part of it form the basis of or be relied on in connection with or act as any inducement to ent
Slide 3: Mission
MISSION vvV vvV • Azincourt Energy Corp pursues exploration and development projects that anchor the company in a globally critical space. • Clean trend initiatives are driving a paradigm shift in how future energy needs will be met. • Demand for the raw materials needed to produce cleaner and more
Slide 4: Management
MANAGEMENT vvV vvV Alex Klenman – President, CEO & Director • Mr. Klenman is an experienced junior mining executive whose career spans over 30 years in the private and public sectors, including the last seven years as CEO of Azincourt. • Over the past decade he has held and continues to hold leaders
Slide 5: Management
MANAGEMENT vvV vvV Paul Reynolds, P.Geo – Director • Professional geoscientist with over 30 years of experience working in Canada, USA, Bolivia, Argentina and Guyana, specializing in the conception and management of mineral exploration ventures. • Paul holds B.Sc. degree in geology from the Universi
Slide 6: Project Portfolio
PROJECT PORTFOLIO vvV vvV East Preston Uranium Project - Saskatchewan, Canada • Azincourt controls the majority interest (~90%) in the 25,000-ha+ exploration project situated in the western Athabasca Basin, Saskatchewan, the world’s premier location for uranium mining • Large inventory of priority d
Slide 7: The Athabasca Basin
THE ATHABASCA BASIN vvV vvV Saskatchewan, Canada World-Class District: The largest, highest grade, uranium deposits in the world with up to 100 times world average Production History: Uranium mining and production for 40+ years Stable Political Climate: Pro-mining attitudes and policies on federal a
Slide 8: Western Athabasca
WESTERN ATHABASCA vvV vvV Area Market Caps • NexGen Energy - $5.3B CDN • Orano (Areva) - $1.99B USD** • Cameco - $27.6B CDN • Fission - $950M CDN • Denison - $2.3B CDN • UEX Corp - Acquired • Skyharbour Resources - $92M CDN • Purepoint Uranium - $30M CDN • Fission 3.0 - $205M CDN • Azincourt Energy
Slide 9: East Preston Project
EAST PRESTON PROJECT vvV vvV Methodical Targeted Exploration Azincourt has employed several rounds of methodical, progressive work programs to delineate prime exploration targets for drill testing. Airborne Geophysical Surveys • Uranium deposits are often associated close to basement conductive tren
Slide 10: East Preston Project: Previous Drill Programs
EAST PRESTON PROJECT vvV vvV Previous Drill Programs • Limited drilling has confirmed: • elevated uranium, • favorable basement lithologies, • and graphitic structures • Analogous to the Patterson Lake South-Arrow-Hook Lake/Spitfire uranium deposit host rocks and setting. • Trace element geochemistr
Slide 11: East Preston: 2021-2022 Winter Drill Program
EAST PRESTON PROJECT vvV vvV 2021-2022 Winter Drill Program • 5,004 meters drilled in 19 holes • Largest drill program to date at East Preston • Three target trends drill tested • G-Zone • K-Zone • H-Zone • Three alteration zones, totaling 1700 meters identified • The discovery of the alteration zon
Slide 12: Significance of Alteration
EAST PRESTON PROJECT vvV vvV Significance of Alteration TSX.V: AAZ OTC: AZURF 11
Slide 13: East Preston: 2022-23 Winter Program
EAST PRESTON PROJECT vvV vvV 2022-23 Winter Program • 3,066m completed in 13 drill holes • Extensive dravite, illite and kaolinite clay alteration confirmed in the K-Zone. • K-Zone alteration zone extended 300m to a total of 1500m strike length. • Elevated radioactivity confirmed in the G-Zone. • Co
Slide 14: Big Hill Lithium Project
BIG HILL LITHIUM PROJECT vvV vvV • Azincourt has entered into a definitive property option agreement with Atlantis Battery Metals pursuant to which the Company has been granted the option to acquire up to a 75% interest in the Big Hill Lithium Project. • Big Hill is 7,500-hectare Lithium- Cesium-Tan
Slide 15: Big Hill Lithium Project
BIG HILL LITHIUM PROJECT vvV vvV • Preliminary reconnaissance at Big Hill has identified four known target areas, based on extrapolation of bedrock geology, structural disaggregation of stratigraphic blocks and apparent folding and late shear faulting. • Similar structural elements are observed in t
Slide 16: Capital Structure
CAPITAL STRUCTRE vvV vvV As of Common Shares 283,280,084 Options to purchase common shares 16,148,000 Warrants to purchase common shares 173,665,053 • Current cash on hand - $3M Major Shareholder Ownership Major Institutional Holders 30% Insiders, Close Associates 10% Family & Friends 10% TSX.V: AAZ
Slide 17: Contact
vvV vvV vvV Suite 1430 – 800 West Pender Street Vancouver, B.C. V6C 2V6 Corporate Communications Danica Topolewski (604) 638-8063 info@azincourtenergy.com azincourtenergy.com azincourtaaz azincourtenergy TSX.V: AAZ OTC: AZURF FSE: A0U2 TSX.V: AAZ OTC: AZURF 16
Azincourt Energy — Investor Presentation (April 2024) on 6ix