    Groundwater Management Bird in Hand Gold Project TERRAMIN AUSTRALIA LIMITED SLIDE No. 1

  2. Slide 2: Legislative Process

    Slide 2: Legislative Process

    LEGISLATIVE PROCESS ➤ Mine is approved under Mining Act and any other permit it requires (EPA, DEWNR, SafeWork) ➤ Mine is subject to Natural Resources Management Act ➤ Department advised that Project must comply with objectives of Water Allocation Plan ➤ S. 128 - Authorised Use of Water ➤ Used by pr

  3. Slide 3: How Is Information Collected

    Slide 3: How Is Information Collected

    HOW IS INFORMATION COLLECTED ➤ Taking water levels and field measurements (pH, TDS, etc) ➤ Sending water samples to the laboratory ➤ Drilling monitoring bores (piezometers) ➤ Equipping bores with pressure transducers, or dipping manually ➤ Live monitoring for quality and level can be set with trigge

  4. Slide 4: Groundwater Baseline

    Slide 4: Groundwater Baseline

    GROUNDWATER BASELINE ➤ Groundwater census 2014-2017 ➤ Water levels ➤ Water quality ➤ Springs and groundwater dependent ecosystems ➤ Investigation bores drilled and pump tested in 2014 ➤ Understanding of system on a local and regional scale ➤ Groundwater model constructed based on over 250 assays, th

  5. Slide 5: Modelling and Calibrations

    Slide 5: Modelling and Calibrations

    MODELLING AND CALIBRATIONS Transient Calibration – Seasonal groundwater decline (m) due to irrigation pumping 385 6628-10199 380 RSWL 375 370 365 2/03/14 18/09/14 6/04/15 23/10/15 10/05/16 26/11/16 Woodside 420 6628-8937 415 RSWL 410 405 400 2/03/14 18/09/14 6/04/15 23/10/15 10/05/16 26/11/16 410 66

  6. Slide 6: Geology - Aquifers, Fractures and Salinity

    Slide 6: Geology - Aquifers, Fractures and Salinity

    GEOLOGY - AQUIFERS, FRACTURES AND SALINITY

  7. Slide 7: Mine Entry Portal

    Slide 7: Mine Entry Portal

    Mine Entry Portal

  8. Slide 8: Probe Drilling

    Slide 8: Probe Drilling

    PROBE DRILLING 4. 4. Water moves around the grouted shell following natural flow paths

  9. Slide 9: Managed Aquifer Recharge

    Slide 9: Managed Aquifer Recharge

    MANAGED AQUIFER RECHARGE Reinjection Bore eee wa

  10. Slide 10: Inverbrackie Creek – Based on CDM Smith

    Slide 10: Inverbrackie Creek – Based on CDM Smith

    INVERBRACKIE CREEK – BASED ON CDM SMITH CONCEPTUAL IMAGE

  11. Slide 11: Inverbrackie Creek – Based on CDM Smith

    Slide 11: Inverbrackie Creek – Based on CDM Smith

    INVERBRACKIE CREEK – BASED ON CDM SMITH CONCEPTUAL IMAGE Depressurisation bore Reinjection Bores

  12. Slide 12: Reinjection Concepts

    Slide 12: Reinjection Concepts

    REINJECTION CONCEPTS Water level Not to scale

  13. Slide 13: Reinjection Concepts

    Slide 13: Reinjection Concepts

    REINJECTION CONCEPTS ~10-15 metres < Mine Irrigation bores > Not to scale

  14. Slide 14: Groundwater Monitoring Network

    Slide 14: Groundwater Monitoring Network

    GROUNDWATER MONITORING NETWORK CONCEPTUAL ➤ Additional monitoring wells to be placed between receptors and reinjection: ➤ Private wells ➤ Inverbrackie Creek ➤ Dawesley Creek catchment ➤ High frequency monitoring of : ---- Reinjection bore network ➤ Groundwater seepage ---- Monitoring bore network &

  15. Slide 15: Reinjection System

    Slide 15: Reinjection System

    REINJECTION SYSTEM ➤ Dept. Environment Water and Natural Resources Well Drainage Permits ➤ All with license conditions ➤ Cannot impact water quality of existing bores ➤ Cannot take away existing users access to water ➤ Pipelines along existing fence lines and existing cleared land

  16. Slide 16: Live Monitoring

    Slide 16: Live Monitoring

    LIVE MONITORING ➤ Live and public – web hosted ➤ Monitoring bores between reinjection bores and irrigation bores ➤ Monitoring will compare against mine water flows and levels - ➤ Irrigation bores ➤ Native vegetation area ➤ Inverbrackie Creek ➤ Monitoring includes salinity

  17. Slide 17: Similar Projects

    Slide 17: Similar Projects

    SIMILAR PROJECTS ➤ Ernest Henry, QLD - Grouting Parameters Ernest Henry Bird in Hand Inflows (l/s) 75-100 1-38L/s Pressure (kPa) 3500 1400 Temperature (oC) 49 20 ➤ Ophthalmia Dam, WA - MAR To maintain the hydrological regimes of groundwater and surface water so that existing and potential uses, incl

  18. Slide 18: Proposed Outcomes and Measurement Criteria

    Slide 18: Proposed Outcomes and Measurement Criteria

    Proposed Outcomes and Measurement Criteria No adverse impact to the supply or quality of water by the mining operations to existing users and water dependant ecosystems TERRAMIN AUSTRALIA LIMITED SLIDE No. 19

  19. Slide 19: No adverse impact to the supply or quality of water

    Slide 19: No adverse impact to the supply or quality of water

    No adverse impact to the supply or quality of water by the mining operations to existing users and water dependant ecosystems Measurement Criteria – How should we demonstrate this? Suggestions ► Monitor water levels and quality in new monitoring wells (“piezometers”) – live and publically available

  20. Slide 20: Discussion

    Slide 20: Discussion

    Discussion -  Comments on Outcome Criteria?  Any questions from the Groundwater Assessment?  Any questions on IGS Peer Review or CDM Smith Peer Review? TERRAMIN AUSTRALIA LIMITED SLIDE No. 21

  21. Slide 21: Surface Water Management

    Slide 21: Surface Water Management

    SURFACE WATER MANAGEMENT Bird in Hand Gold Project

  22. Slide 22: Baseline Environment

    Slide 22: Baseline Environment

    BASELINE ENVIRONMENT ➤ Desktop Study – looked at DEWNR and EPA reports ➤ Samples obtained over 3 years from Inverbrackie Creek, tributaries and dams (>370 samples) ➤ Before-After, Control- Impact (BACI) approach – from ANZECC (Aus/NZ Environment Conservation Council) ➤ Springs identified from water

  23. Slide 23: Macroinvertebrate + habitat work

    Slide 23: Macroinvertebrate + habitat work

    Samples taken using the BACI (Before After / Control Impact) method Macroinvertebrate + habitat work – Habitat assessment using AusRivas – Australian River Assessment System

  24. Slide 24: Outcome of Baseline Studies

    Slide 24: Outcome of Baseline Studies

    OUTCOME OF BASELINE STUDIES ➤ EPA studies: ➤ 2008 – 2016 rated between very poor and poor ➤ Water turbid, enriched with nutrients. ➤ Weedy shrubs over introduced grasses ➤ AC Environmental Studies ➤ Waterway highly disturbed ➤ Metals: higher than freshwater trigger levels at some sites: Arsenic, cad

  25. Slide 25: Site Catchment Map

    Slide 25: Site Catchment Map

    ‘5m Contours Surface Design mem Water course / Drainage Line J sie Boundary (>) Proposed Catchment - = : * a Terramin Australia limited kin : ; CATCHMENT PLAN Consus a better approach Figure 33

  26. Slide 26: Proposed stormwater and water treatment layout

    Slide 26: Proposed stormwater and water treatment layout

    Proposed Primary ExiingNatura Fw Waste Runof Fw Die sits Drecton ) pel seve 100y0=rARI Inestucire Proposed Secondary bialaes 5 ‘Stormwater Treaiment = Contour (Sm) EBB Rainwater Tanks Devoe Cconiou (1m) Ste Road © Somucier?e 50017800 eh nh! Wash © Mercy ecwacon OF omorraterion ater BD excirgries Bs

  27. Slide 27: Surface Water Management Strategy

    Slide 27: Surface Water Management Strategy

    SURFACE WATER MANAGEMENT STRATEGY Proposed Outcome: No contamination of natural water drainage systems, streams and rivers, groundwater, land and soils occurs either on or off site ➤ Maintain existing flow into creek systems ➤ Measurement Criteria: ➤ Water quality – any water flowing offsite must be

Source: Internet Archive copy of terramin.com.au