Aeris Resources Limited · ASX:AIS

Aeris Resources — Diggers and Dealers 2024

25 slides from Aeris Resources's conference presentation, Aug 7, 2024

  1. Slide 1: Correction to ASX Announcement - Diggers and Dealers Presentation

    7 August 2024 ASX/MEDIA RELEASE CORRECTION TO ASX ANNOUNCEMENT DATED 5 AUGUST 2024 – “AERIS RESOURCES - DIGGERS AND DEALERS PRESENTATION” Aeris Resources Limited (ASX:AIS) would like to provide a corrected version of the presentation released to the ASX on 5 August 2024. A number of changes have bee

  2. Slide 2: Diggers and Dealers Presentation

    Diggers and Dealers Presentation August 2024 Presented by: Andre Labuschagne

  3. Slide 3: Disclaimer

    Disclaimer This investor presentation has been prepared by Aeris Resources Limited However, investors should note that the non-IFRS financial information DISCLAIMER (“Aeris” or the “Company”). By attending an investor presentation or and non-GAAP financial measures do not have standardised meanings

  4. Slide 4: Aeris Resources

    Aeris Resources Weighted to copper Australian mid-tier, base and precious metals FY25 production guidance producer 29 79 47 Cu Au Ag Copper Gold Silver 27-32 kt 50-62koz 200-240koz 3 producing operations (40-48kt copper eq.)1 3 development projects All sites prospective for further discoveries Subst

  5. Slide 5: Corporate overview

    Corporate overview Board of Directors AIS SHARE PRICE 0.50 0.40 0.30 Andre Colin Michele Robert Labuschagne Moorhead Muscillo Millner 0.20 Executive Chairman Non-Executive Non-Executive Non-Executive Director Director Director 0.10 0.00 Senior Executives CAPITALISATION Market capitalisation1 A$203 m

  6. Slide 6: Mining Portfolio: large Mineral Resource inventory

    Mining Portfolio: large Mineral Resource inventory Production Assets Development Projects Asset Tritton Cracow North Queensland Jaguar Stockman ~820,000t copper metal, ~1,000,000t zinc metal, ~1,400,000oz gold 1 Ownership 100% 100% 100% 100% 100% Primary Copper / Gold Gold Copper / Gold Copper / Zin

  7. Slide 7: Production assets Tritton

    Production assets Tritton New South Wales

  8. Slide 8: Tritton

    Tritton Our cornerstone asset 100% owned, high-grade underground copper mines located in central NSW 430kt copper produced since operations began in 2005 2,330km prospective tenement package Mineral Resource1 of 22.5Mt at 1.5% Cu, 0.3g/t Au Ore Reserve2,3 of 2.8Mt at 1.5% Cu, 0.3g/t Au FY25 guidance

  9. Slide 9: Tritton

    Tritton A long life copper operation now producing from multiple deposits Production Development Ready Study Phase Exploration Tritton Murrawombie Pit Constellation Kurrajong • Mature mine at depth • Cut back of old pit • Potential future baseload mill feed • High grade deposit • Targeting high-grad

  10. Slide 10: Murrawombie Pit

    Murrawombie Pit Cut back on old pit also provides major rehab saving Stripping expected to commence in Q2 FY25 with contract miner First ore to mill mid FY25 Ore Reserve of 1.3Mt ore @ 1.3%Cu, 0.2g/t Au1 Waste from cut back used to cap old heap leach pads, saving c.$8M rehabilitation costs 1. Ore Re

  11. Slide 11: Constellation deposit

    Constellation deposit Potential future baseload feed for Tritton mill Located 45km northeast of the Tritton plant Mineral Resource1 of 6.7Mt at 1.9% Cu and 0.6g/t Au Drill program commenced in May with two key objectives: 1. Target conversion of 2Mt – 3Mt of Inferred Mineral Resource to an Indicated

  12. Slide 12: Cracow

    Cracow Queensland

  13. Slide 13: Cracow

    Cracow Mature, high-grade gold mine Low-sulphidation epithermal underground gold mine located 500km northwest of Brisbane Conventional crush and grind CIP processing plant Produced +1.5Moz gold since first production in 2004 FY25 guidance 40 – 49koz Au Strong history of reserve replacement in the We

  14. Slide 14: Near mine exploration

    Near mine exploration Defining new mineralised structures Two new near-mine structures discovered (Apollo / Coronation West) Apollo traced 180m (strike) x 60m (down-plunge) – awaiting assays from latest drilling Coronation West drill program underway targeting high grade gold zones similar to the ne

  15. Slide 15: Southern Vein Field

    Southern Vein Field 1 Could be the game-changer for Cracow Approx. 2.5Moz gold produced to date from the WVF and 850koz gold from Golden Plateau Structures with the potential to host WVF style ore shoots interpreted under cover in the Southern Vein Field Southern Vein Field has had very limited expl

  16. Slide 16: North Queensland

    North Queensland Queensland

  17. Slide 17: Mt Colin

    Mt Colin Harvesting cash to fund group capital developments Mine in final stages of life FY25 guidance of 6 – 7kt Cu Production to continue through to Q2 FY25 Significant stockpiles of mined ore available for toll processing 16

  18. Slide 18: Development projects

    Development projects

  19. Slide 19: Barbara project

    Barbara project Potential follow-on operation to Mt Colin Updated resource of 2.2Mt at 2.0% Cu and 0.2g/t Au1 completed Resource remains open down-plunge Feasibility studies underway on a potential underground operation Toll treatment options with regional mills Low capital development utilising inf

  20. Slide 20: Jaguar

    Jaguar Brownfield copper/zinc restart opportunity Mineral Resource1 8Mt @ 1.3% Cu, 5.6% Zn, 0.5g/t Au and 65g/t Ag across 4 deposits Transitioned to care and maintenance in Q1 FY24 Restart study update due Q1 FY25 Tenement package highly prospective for base metals and gold with numerous targets ide

  21. Slide 21: Stockman

    Stockman Long life, Cu-Zn-Au-Ag project with all primary permits Feasibility Study well advanced 12 year mine plan producing at up to 850ktpa1 from a single deposit (Currawong) Potential to extend mine life with other known deposits Currawong mine plan Albion leaching technology being investigated t

  22. Slide 22: Investment highlights

    Investment highlights Company set for growth Diversified production from 3 operations Significant internal growth opportunities to lift production and extend mine lives All sites located in tier 1 mining jurisdiction Leveraged to copper, critical to electrification FY25 production guidance of 40 – 4

  23. Slide 23: Appendix

    We are (cis Appendix

  24. Slide 24: Group Ore Reserves

    Group Ore Reserves PROJECT CATEGORY TONNES (‘000) GRADE CONTAINED METAL Base Metals % Cu % Zn g/t Au g/t Ag kt Cu kt Zn koz Au koz Ag Tritton Proved 5 1.8 - - - 0.1 - - - Probable 2,790 1.5 - 0.3 5 41 - 23 451 Total 2,790 1.5 - 0.3 5 41 - 23 451 Jaguar Proved 90 1.4 8.7 0.8 74 1 8 2 225 Probable 1,0

  25. Slide 25: Group Mineral Resources

    Group Mineral Resources PROJECT CATEGORY TONNES (‘000) GRADE CONTAINED METAL Base Metals % Cu % Zn g/t Au g/t Ag kt Cu kt Zn koz Au koz Ag Tritton Measured 1,300 1.0 - 0.1 3 13 - 4 120 Indicated 11,200 1.4 - 0.3 4 145 - 91 1,280 Inferred 10,000 1.7 - 0.3 4 183 - 137 1,440 Total 22,500 1.5 - 0.3 4 34