Aeris Resources Limited · ASX:AIS

Aeris Resources — Tribeca Future Facing Symposium 2026

35 slides from Aeris Resources's conference presentation, Aug 25, 2026

  1. Slide 1: Tribeca Future Facing Symposium

    For personal use only Tribeca Future Facing Symposium 25 August 2026 Presented by: Andre Labuschagne

  2. Slide 2: Disclaimer

    DISCLAIMER For personal use only This investor presentation has been prepared by Aeris Resources Limited (“Aeris” or the “Company”). By attending an FUTURE PERFORMANCE AND FORWARD-LOOKING STATEMENTS investor presentation or briefing, or accepting, accessing or reviewing this presentation, you acknow

  3. Slide 3: Disclaimer

    DISCLAIMER For personal use only DISCLAIMER NOT FOR DISTRIBUTION OR RELEASE IN THE UNITED STATES To the maximum extent permitted by law, Aeris and each of its respective related bodies corporate, shareholders and This Presentation does not constitute an offer to sell, or the solicitation of an offer

  4. Slide 4: Aeris Resources

    AERIS RESOURCES Australian mid-tier, copper and gold For personal use only producer 2 producing operations (FY26: 42.1kt copper eq.)1 Multiple development projects Investing in exploration Substantial copper production and metal inventory Excellent platform for growth 1. Cu Eq t = ((Cu Produced x Cu

  5. Slide 5: Delivered on Aeris' FY26 Strategy

    Delivered on Aeris’ FY26 Strategy For personal use only Balance Sheet  Repay debt 06 01 Operational Delivery Tritton  Assets sales  Murrawombie Pit  Consider hedging strategy  Constellation on time  Resource extension  LOM Cracow  Golden Plateau  Resource extension  LOM Growth • Focus on l

  6. Slide 6: FY26 at a Glance

    FY26 AT A GLANCE Group guidance achieved and strong balance sheet For personal use only 23kt 49koz 42.1kt Copper Gold Production Production Group Cu Eq (+19% YoY) (within guidance) Peel acquisition $285 million $202 million completed EBITDA1 Cash and (+78% YoY) receivables1 (+308% YoY) 1. Unaudited

  7. Slide 7: Corporate Overview

    CORPORATE OVERVIEW AIS SHARE PRICE Board of Directors For personal use only 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 Andre Labuschagne Colin Moorhead Michele Muscillo Dr Carmen Letton Executive Chairman Non-Executive Director Non-Executive Director Non-Executive Director 0.00 Senior Executives CAPITA

  8. Slide 8: Tritton's Future Secured

    12 TRITTON’S FUTURE SECURED Fourfold increase in Ore Reserves1 10 +0.2 For personal use only +2.7 8 Ore reserves grow to +10Mt containing 180kt Cu1 Tonnes (Mt) Total resources of 33Mt containing 540kt Cu1+70% 6 +3.8 10 Maiden underground reserve for Constellation of 3.8Mt (62kt Cu)1 4 Maiden reserve

  9. Slide 9: Tritton

    For personal use only TRITTON New South Wales

  10. Slide 10: Tritton Operations

    TRITTON OPERATIONS Strategic, cornerstone asset For personal use only AT A GLANCE Strategic location: In copper-rich, Cobar region, NSW Established infrastructure: Central processing plant, access to grid power and rail network Growth potential: Potential to grow copper production and extend life br

  11. Slide 11: Targeting Long Life Tritton Operation

    TARGETING LONG LIFE TRITTON OPERATION For personal use only Significant resources not yet in reserve Avoca Tank Budgery Murrawombie Kurrajong Tritton & SW Budgerygar Wirlong Mallee Bull Constellation 0 2 4 6 8 10 Resource (Mt) Reserve (Mt) 1. As at 30 June 2026. See Appendix for Mineral Resource and

  12. Slide 12: FY27 Mine Plan

    FY27 MINE PLAN Increased reliance on open pits For personal use only Over 1.2Mt Murrawombie ore to be mined in FY27 with pit completed in Q2 FY27 Constellation stripping to start Q1, first primary ore to mill in Q3 High ore tonnes and grade in Q4 Avoca Tank stoping to complete in Q1 – develop to con

  13. Slide 13: Constellation

    CONSTELLATION Updated Ore Reserve supports long-life For personal use only operation Ore reserve1 – 5.3Mt @ 1.5% Cu and 0.6g/t Au Mineral resource1 – 8.4Mt @ 1.9% Cu and 0.6g/t Au 2 years open pit mining Underground after 12 months Significant inferred resource to be converted through drilling Infra

  14. Slide 14: Constellation Timeline

    CONSTELLATION TIMELINE FY26 FY27 FY28 FY29 For personal use only MINING MINING OF TWO STAGE OPEN PIT UG PRODUCTION LEASE Strip ratio 14:1 BEGINS APPLICATION1 Long hole open stoping Construction underway with paste fill UNDERGROUND PORTAL DEVELOPMENT TO START After stage 1 of the open pit FROM MINE T

  15. Slide 15: Mallee Bull

    MALLEE BULL New development project from Peel acquisition For personal use only Maiden Ore reserve1 – 2.7Mt @ 2.4% Cu and 0.2g/t Au Mineral resource1 – 7.0Mt @ 1.8% Cu and 0.4g/t Au Approval for exploration decline Permitting and studies underway for full production Current expectation is for produc

  16. Slide 16: Tritton Exploration

    TRITTON EXPLORATION All deposits open at depth For personal use only

  17. Slide 17: Avoca Tank

    AVOCA TANK Successful exploration increased contained copper 13kt after mining depletion1 For personal use only 1. As at 30 June 2026. See Appendix for Mineral Resource and Ore Reserve Tables. Refer to ASX release “Major Increase in Tritton Mineral Resources and Ore Reserves” dated 21 July 2026

  18. Slide 18: Budgerygar

    BUDGERYGAR Resources and reserves increased with drilling1 For personal use only 1. As at 30 June 2026. See Appendix for Mineral Resource and Ore Reserve Tables. Refer to ASX release “Major Increase in Tritton Mineral Resources and Ore Reserves” dated 21 July 2026

  19. Slide 19: Cracow

    For personal use only Queensland CRACOW

  20. Slide 20: Cracow Operations

    CRACOW OPERATIONS Consistent operation with a long production history For personal use only AT A GLANCE Location: Cracow, Central Qld Underground gold mine: In continuous production since 2004 Strong history of reserve replacement 40.6 koz Au FY26 production Exploration/ High quality +1.7Moz gold pr

  21. Slide 21: Golden Plateau

    GOLDEN PLATEAU Increasing confidence in future mining For personal use only opportunity Drill program underway to test remnant mineralisation around historic stoping areas 14,000m program underway Mineral Resource update expected H1 FY27 Key intersections include1: GPS160 14.2m2 at 9.1g/t Au (Main l

  22. Slide 22: Exploration: Greenfield Targets

    EXPLORATION Greenfield targets For personal use only Exploring for a Western Vein Field analogue at the Southern Vein Field Airborne magnetic survey completed to aid finalisation of drill targets under 500m cover Drilling planned for FY27 (limited historical drilling) Western Frontier is an interpre

  23. Slide 23: Projects

    For personal use only PROJECTS

  24. Slide 24: Stockman Project

    STOCKMAN PROJECT Potential long-life, polymetallic development asset For personal use only AT A GLANCE Omeo region, Victoria, ~300km NE Melbourne Studies underway Proposed underground mines and conventional flotation plant Strong community support Major permits granted Mining Lease, EIS, tailings pe

  25. Slide 25: Jaguar

    JAGUAR Highly prospective exploration project For personal use only AT A GLANCE Significant resources defined 6.6Mt at 1.4% Cu, 6.3% Zn, 0.6g/t Au, 71g/t Ag1 Mine and plant on care and maintenance Reduced holding costs Highly prospective for both base metals and gold Gold Prospective tenement packag

  26. Slide 26: Jaguar Exploration

    JAGUAR EXPLORATION Base metal targets Gold targets For personal use only 26

  27. Slide 27: Delivering on Aeris' Strategy in FY27

    DELIVERING ON AERIS’ STRATEGY IN FY27 For personal use only 01 OPERATIONAL DELIVERY 02 03 JAGUAR STRATEGY Tritton Cracow PORTFOLIO • Murrawombie Pit • Low-cost care & complete in Q2 • Golden Plateau mining study Q2 SIMPLIFICATION maintenance • Constellation in • Get ready to drill Continually assess

  28. Slide 28: Aeris Resources

    AERIS RESOURCES Australian mid-tier, copper and gold For personal use only producer 2 producing operations (FY26: 42.1kt copper eq.)1 Multiple development projects Investing in exploration Substantial copper production and metal inventory Excellent platform for growth 1. Cu Eq t = ((Cu Produced x Cu

  29. Slide 29: For personal use only

    For personal use only

  30. Slide 30: Appendix

    For personal use only APPENDIX

  31. Slide 31: Group Mineral Resources

    GROUP MINERAL RESOURCES As at 30 June 2026. Refer to ASX announcement “Group Mineral Resource and Ore Reserve Statement” dated 30 July 2026 For personal use only BASE Tonnes Grade Contained Metal METALS Category Cu Zn Au Ag Cu Zn Au Ag Asset (Mt) (%) (%) (g/t) (g/t) (kt) (kt) (koz) (koz) Measured 1.

  32. Slide 32: Tritton Mineral Resources

    TRITTON MINERAL RESOURCES As at 30 June 2026. Refer to ASX announcement “Major Increase in Tritton Ore Reserves and Mineral Resources” dated 21 July 2026 Grade Contained Metal Grade Contained Metal Grade Contained Metal For personal use only Deposit Category (Mt) Cu Au Ag Cu Au Ag Deposit Category (

  33. Slide 33: Group Ore Reserves

    GROUP ORE RESERVES As at 30 June 2026. Refer to ASX announcement “Group Mineral Resource and Ore Reserve Statement” dated 30 July 2026 For personal use only BASE Tonnes Grade Contained Metal METALS Category Cu Zn Au Ag Cu Zn Au Ag Asset (Mt) (%) (%) (g/t) (g/t) (kt) (kt) (koz) (koz) Proved 0.75 1.2

  34. Slide 34: Tritton Ore Reserves

    TRITTON ORE RESERVES As at 30 June 2026. Refer to ASX announcement “Major Increase in Tritton Ore Reserves and Mineral Resources” dated 21 July 2026 For personal use only Tonnes Grade Contained Metal Deposit Category (Mt) Cu Au Ag Cu Au Ag (%) (g/t) (g/t) (kt) (koz) (koz) Proved - - - - - - - Tritto

  35. Slide 35: FY27 Guidance

    FY27 GUIDANCE Group FY27 Guidance FY26 Actual Tritton FY27 Guidance FY26 Actual For personal use only Production Production Copper kt 22 - 27 23 Copper kt 22 - 27 23 Gold koz 42 - 51 49 Gold koz 8 - 10 8 Silver koz 130 - 160 256 Silver koz 100 - 130 229 Copper equivalent kt 37 - 46 42 Operating Cost

Aeris Resources — Tribeca Future Facing Symposium 2026 on 6ix