Aeris Resources Limited · ASX:AIS
Aeris Resources — Resource Rising Stars Conference September 2026
34 slides from Aeris Resources's conference presentation, Sep 9, 2026
Slide 1: Resource Rising Stars Conference
Resource Rising Stars Conference September 2026 Presented by: Andre Labuschagne
Slide 2: Disclaimer
DISCLAIMER This investor presentation has been prepared by Aeris Resources Limited (“Aeris” or the “Company”). By attending an FUTURE PERFORMANCE AND FORWARD-LOOKING STATEMENTS investor presentation or briefing, or accepting, accessing or reviewing this presentation, you acknowledge and agree to Thi
Slide 3: Disclaimer
DISCLAIMER DISCLAIMER NOT FOR DISTRIBUTION OR RELEASE IN THE UNITED STATES To the maximum extent permitted by law, Aeris and each of its respective related bodies corporate, shareholders and This Presentation does not constitute an offer to sell, or the solicitation of an offer to buy, any securitie
Slide 4: Aeris Resources
AERIS RESOURCES Australian mid-tier, copper and gold producer 2 producing operations (FY26: 42.1kt copper eq.)1 Multiple development projects Investing in exploration Substantial copper production and metal inventory Excellent platform for growth 1. Cu Eq t = ((Cu Produced x Cu $/t) + (Au Produced x
Slide 5: Delivered on Aeris' FY26 Strategy
Delivered on Aeris’ FY26 Strategy Balance Sheet ✓ Repay debt 06 01 Operational Delivery Tritton ✓ Assets sales ✓ Murrawombie Pit ✓ Consider hedging strategy ✓ Constellation on time ✓ Resource extension ✓ LOM Cracow ✓ Golden Plateau ✓ Resource extension ✓ LOM Growth • Focus on life extensions 05 Real
Slide 6: FY26 at a Glance
FY26 AT A GLANCE Group guidance achieved and strong balance sheet 23kt 49koz 42.1kt Copper Gold Production Production Group Cu Eq (+19% YoY) (within guidance) Peel acquisition $290 million $202 million completed EBITDA Cash and (+81% YoY) receivables (+308% YoY)
Slide 7: Corporate Overview
CORPORATE OVERVIEW AIS SHARE PRICE Board of Directors 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 Andre Labuschagne Executive Chairman Colin Moorhead Non-Executive Director Michele Muscillo Dr Carmen Letton Non-Executive Director Non-Executive Director 0.00 Senior Executives CAPITALISATION Market capita
Slide 8: Tritton
TRITTON wn a0) fe = £S = =) fe) nM = ® Z
Slide 9: Tritton Operations
TRITTON OPERATIONS Strategic, cornerstone asset AT A GLANCE Strategic location: In copper-rich, Cobar region, NSW Established infrastructure: Central processing plant, access to grid power and rail network Growth potential: Potential to grow copper production and extend life bringing new mines 1.8Mt
Slide 10: Tritton's Future Secured
12 TRITTON’S FUTURE SECURED Fourfold increase in Ore Reserves1 10 +0.2 +2.7 8 Ore reserves grow to +10Mt containing 180kt Cu1 Tonnes (Mt) Total resources of 33Mt containing 540kt Cu1+70% 6 +3.8 10 Maiden underground reserve for Constellation of 3.8Mt (62kt Cu)1 4 Maiden reserve for Mallee Bull of 2.
Slide 11: Targeting Long Life Tritton Operation
TARGETING LONG LIFE TRITTON OPERATION Significant resources not yet in reserve Avoca Tank Budgery Murrawombie Kurrajong Tritton & SW Budgerygar Wirlong Mallee Bull Constellation 0 2 4 6 8 10 Resource (Mt) Reserve (Mt) 1. As at 30 June 2026. See Appendix for Mineral Resource and Ore Reserve Tables. R
Slide 12: FY27 Mine Plan
FY27 MINE PLAN Increased reliance on open pits Over 1.2Mt Murrawombie ore to be mined in FY27 with pit completed in Q2 FY27 Constellation stripping started, first primary ore to mill in Q3 High ore tonnes and grade in Q4 Avoca Tank stoping to complete in Q1 – develop to continue out to resource exte
Slide 13: Constellation
CONSTELLATION Updated Ore Reserve supports long-life operation Ore reserve1 – 5.3Mt @ 1.5% Cu and 0.6g/t Au Mineral resource1 – 8.4Mt @ 1.9% Cu and 0.6g/t Au 2 years open pit mining Underground after 12 months Significant inferred resource to be converted through drilling Infrastructure capital ~$10
Slide 14: Mallee Bull
MALLEE BULL New development project from Peel acquisition Maiden Ore reserve1 – 2.7Mt @ 2.4% Cu and 0.2g/t Au Mineral resource1 – 7.0Mt @ 1.8% Cu and 0.4g/t Au Approval for exploration decline Permitting and studies underway for full production Current expectation is for production in FY30 Multiple
Slide 15: Tritton Exploration
TRITTON EXPLORATION All deposits open at depth
Slide 16: Avoca Tank
AVOCA TANK Successful exploration increased contained copper 13kt after mining depletion1 1. As at 30 June 2026. See Appendix for Mineral Resource and Ore Reserve Tables. Refer to ASX release “Major Increase in Tritton Mineral Resources and Ore Reserves” dated 21 July 2026
Slide 17: Budgerygar
BUDGERYGAR Resources and reserves increased with drilling1 1. As at 30 June 2026. See Appendix for Mineral Resource and Ore Reserve Tables. Refer to ASX release “Major Increase in Tritton Mineral Resources and Ore Reserves” dated 21 July 2026
Slide 18: Cracow
“CRACOW Queensland
Slide 19: Cracow Operations
CRACOW OPERATIONS Consistent operation with a long production history AT A GLANCE Location: Cracow, Central Qld Underground gold mine: In continuous production since 2004 Strong history of reserve replacement 40.6 koz Au FY26 production Exploration/ High quality +1.7Moz gold project potential Produc
Slide 20: Golden Plateau
GOLDEN PLATEAU Increasing confidence in future mining opportunity Drill program underway to test remnant mineralisation around historic stoping areas 14,000m program underway Mineral Resource update expected H1 FY27 Key intersections include1: GPS160 14.2m2 at 9.1g/t Au (Main lode) GPS171 32.2m2 at
Slide 21: Exploration
EXPLORATION Greenfield targets Exploring for a Western Vein Field analogue at the Southern Vein Field Airborne magnetic survey completed to aid finalisation of drill targets under 500m cover Drilling planned for FY27 (limited historical drilling) Western Frontier is an interpreted structural corrido
Slide 22: Projects
PROJECTS —
Slide 23: Stockman Project
STOCKMAN PROJECT Potential long-life, polymetallic development asset AT A GLANCE Omeo region, Victoria, ~300km NE Melbourne Studies underway Proposed underground mines and conventional flotation plant Strong community support Major permits granted Mining Lease, EIS, tailings permit H1 FY27 17Mt Feas
Slide 24: Jaguar
JAGUAR Highly prospective exploration project AT A GLANCE Significant resources defined 6.6Mt at 1.4% Cu, 6.3% Zn, 0.6g/t Au, 71g/t Ag1 Mine and plant on care and maintenance Reduced holding costs Highly prospective for both base metals and gold Gold Prospective tenement package along trend from maj
Slide 25: Jaguar Exploration
JAGUAR EXPLORATION Base metal targets Gold targets 25
Slide 26: Delivering on Aeris' Strategy in FY27
DELIVERING ON AERIS’ STRATEGY IN FY27 01 OPERATIONAL DELIVERY 02 03 JAGUAR STRATEGY Tritton Cracow PORTFOLIO • Murrawombie Pit • Golden Plateau mining • Low-cost care & complete in Q2 study Q2 SIMPLIFICATION maintenance • Constellation in • Get ready to drill Continually assess • Finalise priority p
Slide 27: Aeris Resources
AERIS RESOURCES Australian mid-tier, copper and gold producer 2 producing operations (FY26: 42.1kt copper eq.)1 Multiple development projects Investing in exploration Substantial copper production and metal inventory Excellent platform for growth 1. Cu Eq t = ((Cu Produced x Cu $/t) + (Au Produced x
Slide 28: = Reris
= 7 Reris
Slide 29: Appendix
APPENDIX
Slide 30: Group Mineral Resources
GROUP MINERAL RESOURCES As at 30 June 2026. Refer to ASX announcement “Group Mineral Resource and Ore Reserve Statement” dated 30 July 2026 BASE Tonnes Grade Contained Metal METALS Category Cu Zn Au Ag Cu Zn Au Ag Asset (Mt) (%) (%) (g/t) (g/t) (kt) (kt) (koz) (koz) Measured 1.8 1.4 - 0.2 4 25 - 11
Slide 31: Tritton Mineral Resources
TRITTON MINERAL RESOURCES As at 30 June 2026. Refer to ASX announcement “Major Increase in Tritton Ore Reserves and Mineral Resources” dated 21 July 2026 Grade Contained Metal Grade Contained Metal Grade Contained Metal Deposit Category (Mt) Cu Au Ag Cu Au Ag Deposit Category (Mt) Cu Au Ag Cu Au Ag
Slide 32: Group Ore Reserves
GROUP ORE RESERVES As at 30 June 2026. Refer to ASX announcement “Group Mineral Resource and Ore Reserve Statement” dated 30 July 2026 BASE Tonnes Grade Contained Metal METALS Category Cu Zn Au Ag Cu Zn Au Ag Asset (Mt) (%) (%) (g/t) (g/t) (kt) (kt) (koz) (koz) Proved 0.75 1.2 - 0.1 3 9.2 - 2.4 63 T
Slide 33: Tritton Ore Reserves
TRITTON ORE RESERVES As at 30 June 2026. Refer to ASX announcement “Major Increase in Tritton Ore Reserves and Mineral Resources” dated 21 July 2026 Tonnes Grade Contained Metal Deposit Category (Mt) Cu Au Ag Cu Au Ag (%) (g/t) (g/t) (kt) (koz) (koz) Proved - - - - - - - Probable Tritton Underground
Slide 34: FY27 Guidance
FY27 GUIDANCE Group FY27 Guidance FY26 Actual Tritton FY27 Guidance FY26 Actual Production Production Copper kt 22 - 27 23 Copper kt 22 - 27 23 Gold koz 42 - 51 49 Gold koz 8 - 10 8 Silver koz 130 - 160 256 Silver koz 100 - 130 229 Copper equivalent kt 37 - 46 42 Operating Costs Operating Costs Mine