Aeris Resources Limited · ASX:AIS
Aeris Resources — Shareholder Meeting (November 2026)
37 slides from Aeris Resources's shareholder meeting presentation, Nov 19, 2026

Slide 1: 2026 Annual General Meeting
rsonal use only 2026 ANNUAL GENERAL MEETING 19 November 2026 Presented by: Andre Labuschagne

Slide 2: Disclaimer
DISCLAIMER rsonal use only This investor presentation has been prepared by Aeris Resources Limited (“Aeris” or the measures do not have standardised meanings prescribed by AAS or IFRS. Therefore, the non-IFRS “Company”). By attending an investor presentation or briefing, or accepting, accessing or f

Slide 3: Disclaimer
DISCLAIMER rsonal use only DISCLAIMER https://www.aerisresources.com.au/investor. To the maximum extent permitted by law, Aeris and each of its respective related bodies corporate, shareholders and affiliates, and each of their respective officers, Aeris confirms that it is not aware of any new info

Slide 4: Aeris Resources
AERIS RESOURCES Australian mid-tier, copper and gold rsonal use only producer 2 producing operations (FY26: 42.1kt copper eq.)1 Multiple development projects Investing in exploration Substantial copper production and metal inventory Excellent platform for growth 1. Cu Eq t = ((Cu Produced x Cu $/t)

Slide 5: Delivered on Aeris' FY26 Strategy
DELIVERED ON AERIS’ FY26 STRATEGY rsonal use only Balance Sheet Repay debt 06 01 Operational Delivery Tritton Assets sales Murrawombie Pit Consider hedging strategy Constellation on time Resource extension LOM Cracow Golden Plateau Resource extension LOM Growth • Focus on life ex

Slide 6: FY26 at a Glance
FY26 AT A GLANCE Group guidance achieved and strong balance sheet rsonal use only 23kt 49koz 42.1kt Copper Gold Production Production Group Cu Eq (+19% YoY) (within guidance) Peel acquisition $290 million $207 million completed EBITDA Cash and (+81% YoY) receivables (+318% YoY)

Slide 7: Delivering on Aeris' Strategy in FY27
DELIVERING ON AERIS’ STRATEGY IN FY27 rsonal use only 01 OPERATIONAL DELIVERY 02 03 JAGUAR STRATEGY Tritton Cracow PORTFOLIO • Murrawombie Pit • Low-cost care & complete in Q2 • Golden Plateau mining study Q2 SIMPLIFICATION maintenance • Constellation in • Get ready to drill Continually assess • Fin

Slide 8: Corporate Overview
CORPORATE OVERVIEW AIS SHARE PRICE Board of Directors rsonal use only 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 Andre Labuschagne Colin Moorhead Michele Muscillo Dr Carmen Letton Executive Chairman Non-Executive Director Non-Executive Director Non-Executive Director 0.00 Senior Executives CAPITALISATI

Slide 9: Tritton
rsonal use only TRITTON New South Wales

Slide 10: Tritton Operations
TRITTON OPERATIONS Strategic, cornerstone asset rsonal use only AT A GLANCE Strategic location: In copper-rich, Cobar region, NSW Established infrastructure: Central processing plant, access to grid power and rail network Growth potential: Potential to grow copper production and extend life bringing

Slide 11: Tritton's Future Secured
12 TRITTON’S FUTURE SECURED Fourfold increase in Ore Reserves1 10 +0.2 rsonal use only +2.7 8 Ore reserves grow to 10Mt containing 180kt Cu1 Tonnes (Mt) Total resources of 33Mt containing 540kt Cu (+70%)1 6 +3.8 10 Maiden underground reserve for Constellation of 3.8Mt (62kt Cu)1 4 Maiden reserve for

Slide 12: Targeting Long Life Tritton Operation
TARGETING LONG LIFE TRITTON OPERATION rsonal use only Significant resources not yet in reserve Avoca Tank Budgery Murrawombie Kurrajong Tritton & SW Budgerygar Wirlong Mallee Bull Constellation 0 2 4 6 8 10 Resource (Mt) Reserve (Mt) 1. As at 30 June 2026. See Appendix for Mineral Resource and Ore R

Slide 13: FY27 Mine Plan
FY27 MINE PLAN Increased reliance on open pits rsonal use only Murrawombie pit to be completed in Q2 FY27, resulting in ore stockpile for FY27/28 Constellation stripping started Q1, first primary ore to mill in Q3 High ore tonnes and grade in Q4 Avoca Tank extension confirmed – additional ore in FY2

Slide 14: Constellation
CONSTELLATION Construction underway on Aeris’s next rsonal use only mine Ore reserve1 – 5.3Mt @ 1.5% Cu and 0.6g/t Au Mineral resource1 – 8.4Mt @ 1.9% Cu and 0.6g/t Au 2 years open pit mining Underground after 12 months Significant inferred resource to be converted through drilling Infrastructure ca

Slide 15: Constellation Construction
CONSTELLATION CONSTRUCTION rsonal use only Site construction underway 5km of 25km haul road completed and sealed

Slide 16: Constellation Waste Stripping
CONSTELLATION WASTE STRIPPING rsonal use only

Slide 17: Mallee Bull
MALLEE BULL Potential second, long-life ore source rsonal use only High-grade maiden ore reserve1 – 2.7Mt @ 2.4% Cu, 0.2g/t Au Large mineral resource1 – 7.0Mt @ 1.8% Cu, 0.4g/t Au Potential for long life operation to complement Constellation Targeting production in FY30 Capital investment expected t

Slide 18: Tritton Exploration
TRITTON EXPLORATION All deposits open at depth rsonal use only

Slide 19: Avoca Tank
AVOCA TANK Successful exploration extending the mine life at Avoca Tank rsonal use only See Appendix for Mineral Resource and Ore Reserve Tables. Refer to ASX release “Major Increase in Tritton Mineral Resources and Ore Reserves” dated 21 July 2026

Slide 20: Budgerygar
BUDGERYGAR Resources and reserves increased with drilling1 rsonal use only 1. As at 30 June 2026. See Appendix for Mineral Resource and Ore Reserve Tables. Refer to ASX release “Major Increase in Tritton Mineral Resources and Ore Reserves” dated 21 July 2026

Slide 21: Cracow
rsonal use only CRACOW Queensland

Slide 22: Cracow Operations
CRACOW OPERATIONS Consistent operation with a long production history rsonal use only AT A GLANCE Location: Cracow, Central Qld Underground gold mine: In continuous production since 2004 Strong history of reserve replacement 40.6 koz Au FY26 production Exploration/ High quality +1.7Moz gold project

Slide 23: Golden Plateau
GOLDEN PLATEAU Potential for mine life extension rsonal use only Jun 26 MRE Drill hole Oct 26 MRE Drill hole

Slide 24: Golden Plateau: Material increase to Mineral Resource
GOLDEN PLATEAU Material increase to Mineral Resource1 rsonal use only Grade Contained Metal Tonnes Deposit Category Au Ag Au Ag (kt) (g/t) (g/t) (koz) (koz) 220% increase in contained gold metal Measured 95 2.8 8 8.4 23 Indicated 910 2.1 5 60 160 Open Pit Measured and Indicated Mineral Resources now

Slide 25: Exploration: Greenfield targets
EXPLORATION Greenfield targets rsonal use only Exploring for a Western Vein Field analogue at the Southern Vein Field Airborne magnetic survey completed to aid finalisation of drill targets under 500m cover Drilling planned for FY27 (limited historical drilling) Western Frontier is an interpreted st

Slide 26: Projects
rsonal use only PROJECTS

Slide 27: Stockman Project
STOCKMAN PROJECT Potential long-life, polymetallic development asset rsonal use only AT A GLANCE Omeo region, Victoria ~300km NE Melbourne Studies underway Proposed underground mines and conventional flotation plant Strong community support Major permits granted Mining Lease, EIS, tailings permit FY

Slide 28: Jaguar
JAGUAR Highly prospective exploration project rsonal use only AT A GLANCE Significant resources defined 6.6Mt at 1.4% Cu, 6.3% Zn, 0.6g/t Au, 71g/t Ag1 Mine and plant on care and maintenance Reduced holding costs Highly prospective for both base metals and gold Gold Prospective tenement package alon

Slide 29: Jaguar Exploration
JAGUAR EXPLORATION Base metal targets Gold targets rsonal use only

Slide 30: Aeris Resources
AERIS RESOURCES Australian mid-tier, copper and gold rsonal use only producer 2 producing operations (FY26: 42.1kt copper eq.)1 Multiple development projects Investing in exploration Substantial copper production and metal inventory Excellent platform for growth 1. Cu Eq t = ((Cu Produced x Cu $/t)

Slide 31: rsonal use only
rsonal use only

Slide 32: Appendix
rsonal use only APPENDIX

Slide 33: Group Mineral Resources
GROUP MINERAL RESOURCES As at 30 June 2026. Refer to ASX announcement “Group Mineral Resource and Ore Reserve Statement” dated 30 July 2026 rsonal use only BASE Tonnes Grade Contained Metal METALS Category Cu Zn Au Ag Cu Zn Au Ag Asset (Mt) (%) (%) (g/t) (g/t) (kt) (kt) (koz) (koz) Measured 1.8 1.4

Slide 34: Tritton Mineral Resources
TRITTON MINERAL RESOURCES As at 30 June 2026. Refer to ASX announcement “Major Increase in Tritton Mineral Resources and Ore Reserves” dated 21 July 2026 Grade Contained Metal Grade Contained Metal Grade Contained Metal rsonal use only Deposit Category (Mt) Cu Au Ag Cu Au Ag Deposit Category (Mt) Cu

Slide 35: Group Ore Reserves
GROUP ORE RESERVES As at 30 June 2026. Refer to ASX announcement “Group Mineral Resource and Ore Reserve Statement” dated 30 July 2026 rsonal use only BASE Tonnes Grade Contained Metal METALS Category Cu Zn Au Ag Cu Zn Au Ag Asset (Mt) (%) (%) (g/t) (g/t) (kt) (kt) (koz) (koz) Proved 0.75 1.2 - 0.1

Slide 36: Tritton Ore Reserves
TRITTON ORE RESERVES As at 30 June 2026. Refer to ASX announcement “Major Increase in Tritton Mineral Resources and Ore Reserves” dated 21 July 2026 rsonal use only Tonnes Grade Contained Metal Deposit Category (Mt) Cu Au Ag Cu Au Ag (%) (g/t) (g/t) (kt) (koz) (koz) Proved - - - - - - - Tritton Unde

Slide 37: FY27 Guidance
FY27 GUIDANCE Group FY27 Guidance FY26 Actual Tritton FY27 Guidance FY26 Actual rsonal use only Production Production Copper kt 22 - 27 23 Copper kt 22 - 27 23 Gold koz 42 - 51 49 Gold koz 8 - 10 8 Silver koz 130 - 160 256 Silver koz 100 - 130 229 Copper equivalent kt 37 - 46 42 Operating Costs Oper
Source: ASX announcement, Nov 19, 2026
More decks from Aeris Resources Limited
Q1 FY27 Earnings Presentation22 slides · Oct 31, 2026
Resource Rising Stars Conference September 202634 slides · Sep 9, 2026
Tribeca Future Facing Symposium 202635 slides · Aug 25, 2026
Q4 FY26 Earnings Presentation28 slides · Jul 29, 2026
Noosa Mining Conference 202633 slides · Jul 23, 2026
Q3 FY26 Earnings Presentation29 slides · Apr 29, 2026