Slide 1: Project Update – WCCC February 2018
Project Update – WCCC February 2018 TERRAMIN AUSTRALIA LIMITED SLIDE No. 1
Slide 2: Project Update
Project Update EPBC Act Referral – Federal government assessed and determined “Not a controlled action’’ Not conditional Received 7th February 2018 Endangered orchids and listed ecosystems within the proposed ML not impacted by mining operations – aspects such as groundwater, dust, etc asses
Slide 3: Community participation: Anchor to Pulse 4 (ALL)
Community participation: Anchor to Pulse 4 (ALL) Invited Completed all 4 surveys 444 211 Responded Strong engagement in the 2017 294 CSIRO Reflexivity process – 211 people completed all five surveys Response Rate across 12 months+ 66% TERRAMIN AUSTRALIA LIMITED SLIDE No. 3
Slide 4: Mining Lease Proposal (MLP)
Mining Lease Proposal (MLP) No feedback from Government regarding Managed Aquifer Recharge This has impacted our targeted timeframe We will update WCCC on targeted timeframe when we receive advice from the Government Terramin will release draft sections of the Mining Lease Proposal to the WC
Slide 5: Outcomes and Measurable Criteria
Outcomes and Measurable Criteria Outcomes and Outcome Measurable Criteria So far WCCC has received o Groundwater o Air Overpressure o Surface water o Traffic o Noise o Fire o Vibration o Air Quality Outcomes are set at Mining Lease Proposal (MLP) stage Measurable criteria developed from now
Slide 6: Outcomes and Lease Conditions – AZM Example
Outcomes and Lease Conditions – AZM Example how the conditions developed ML PROPOSED OUTCOME “Stabilise disturbed areas and prevent sediment from leaving the site” ML LEASE CONDITION “The Lessee must, in constructing and operating the lease and post mine closure, stabilise disturbed areas and preven
Slide 7: Outcome – proposed and measurable criteria
Outcome – proposed Measureable and Criteria finalised – draft now atbut Mining Leasethrough finalised ProposalPEPR stage TERRAMIN AUSTRALIA LIMITED SLIDE No. 7
Slide 8: Air Quality – Dust Control
TERRAMIN AUSTRALIA LIMITED Air Quality – Dust Control
Slide 9: Types of Dust
Types of Dust TERRAMIN AUSTRALIA LIMITED SLIDE No. 9
Slide 10: Baseline Monitoring at BIHGP
Baseline Monitoring at BIHGP What we measured for Total Suspended Particulates (TSP) - <50 micron PM10 - <10 micron Deposited Dust (Total Insoluble Matter) – any size Background metals TERRAMIN AUSTRALIA LIMITED SLIDE No. 10
Slide 11: Dust - compliance
Dust - compliance Dust is a recognised nuisance Environmental Protection (Air Quality) Policy (EP Act) sets the standards for airborne dust No Total Suspended Particulates / Dust deposition standards for SA Standard practice - NSW Approved Methods for Modelling and Assessment of Air Pollutan
Slide 12: TERRAMIN AUSTRALIA LIMITED SLIDE No. 12
TERRAMIN AUSTRALIA LIMITED SLIDE No. 12
Slide 13: Baseline
Baseline Updated Baseline Reports in 2017 PM10 more variable than expected baseline results for 2017 Strathalbyn range 0.2 – 30.6 µg/m³ Woodside range 10.7 – 78.9 µg/m³ EPA 2006 Woodside 6 - 90 µg/m³ Total Suspended Particulates variable with seasonal activities Total Dust Deposition s
Slide 14: Sources of Potential Dust
Sources of Potential Dust Dump trucks on surface – Mullock and Ore Integrated Mullock Landform Disturbed and cleared land Construction sites Vehicle emissions Ventilation fans TERRAMIN AUSTRALIA LIMITED SLIDE No. 14
Slide 15: Management of Potential Dust
Management of Potential Dust Enclosing, vegetation, spraying, all examples of how to control TERRAMIN AUSTRALIA LIMITED SLIDE No. 15
Slide 16: Site Design – increase vegetation moisture
Site Design – increase vegetation moisture Irrigation systems Perennial vegetation – green all year Significant reduction of grasses with high fuel loads – phalaris Native C3 and C4 grasses TERRAMIN AUSTRALIA LIMITED SLIDE No. 16
Slide 17: Monitoring of Potential Dust
Monitoring of Potential Dust Beta Attenuation Particulate Monitors – “BAM Units” Live Link to weather station Can have alert systems in place Example – wind direction, wind speed and increased dust can set off early warning alarms to change activities Options – more mitigation or alter/s
Slide 18: Example – Olympic Dam
Example – Olympic Dam OUTCOME: No adverse impacts to public health as a result of fugitive particulate emissions from BHP Billiton’s expansion activities at Olympic Dam Real time monitoring with weather station – rapid response Trigger Action Response Plan 1. Relocating activities – more dis
Slide 19: Bird in Hand – Air Quality Strategies
Bird in Hand – Air Quality Strategies Water carts, sprinklers on exposed and disturbed soils (inc. IML) Vegetate exposed soils as soon as practical, hydromulching, cover all soil bunds with vegetation (reduces air velocity on soil) Ore – enclosed in silo rather than on ground Tip points full
Slide 20: Proposed outcomes
Proposed outcomes 1. No nuisance impacts to local residents from dust generated by construction, mining or closure activities. 2. No public health impacts to local residents from dust generated by construction, mining or closure activities. 3. No loss of productivity on properties surrounding the mi
Slide 21: Traffic Management of Heavy Vehicles
TERRAMIN AUSTRALIA LIMITED Traffic Management of Heavy Vehicles
Slide 22: Proof of Traffic concepts
Proof of Traffic concepts Tonkin Consulting Type of road haul truck Analysis of road haul truck movements Analysis of haulage routes Suitability Safety Existing conditions Haulage Exclusions - understanding Peak traffic periods Overnight exclusion Disaster plan – bushfire, accide
Slide 23: Existing Pfeiffer Road Traffic
Existing Pfeiffer Road Traffic Existing Traffic Traffic volumes are highly April Feb Nov-Dec variable Volumes on Pfeiffer Nov 14 2014 2015 2017 Always activities on Pfeiffer Road Road 24 Hours 1036 953 955 944 Vintage + bottling Expansions of current Cars 867 762 857 879 businesses New own
Slide 24: What type & how many vehicles?
What type & how many vehicles? Ore haulage vehicles – 19m Rigid Truck and Dog; 12 loads = 24 movements per day Other supply trucks – Rigid Trucks thru’ to Semi-Trailers 2 loads = 4 movements per day Company vehicles - Utes/SUV’s 5 vehicles = 10 movements per day Employee vehicles – Cars 15 c
Slide 25: 19m Truck and Dog – General Access Vehicle
19m Truck and Dog – General Access Vehicle TERRAMIN AUSTRALIA LIMITED SLIDE No. 25
Slide 26: Management
Management Safety is top priority Dedicated access to site on Pfeiffer Road – Wide enough with good sightlines Dpt. Planning, Transport and Infrastructure approved design Exclusion times – no ore haulage between BIH and Angas 10pm – 6am (excludes night) 6am – 9am (excludes commuter tra
Slide 27: TERRAMIN AUSTRALIA LIMITED SLIDE No. 27
TERRAMIN AUSTRALIA LIMITED SLIDE No. 27
Slide 28: Potential Routes
Potential Routes Woodside to Strathalbyn - 3 possible routes: Route 1 – via Nairne Road, Old Princes Hwy, Bald Hills Rd, Hartman Rd, Paech Rd, Wellington Rd & Callington Rd (35 mins) Route 2 – via Nairne Rd, South Eastern Freeway and Callington Rd (40 mins) – preferred Opportunity to upgrade N
Slide 29: TERRAMIN AUSTRALIA LIMITED SLIDE No. 29
TERRAMIN AUSTRALIA LIMITED SLIDE No. 29
Slide 30: Proposed outcome
Proposed outcome No unauthorised damage to public infrastructure as a result of mining operations No traffic accidents occur involving the public and mine traffic that could have been reasonably prevented TERRAMIN AUSTRALIA LIMITED SLIDE No. 30
Slide 31: Monitoring – Draft Outcome Measurable Criteria
Monitoring – Draft Outcome Measurable Criteria Independent investigation of all traffic accidents demonstrates that the mine operator could not have reasonably prevented the accident from occurring. Investigation of all public infrastructure related complaints demonstrates that the Mine Operator
Slide 32: Bushfire Prevention and Emergency Response Planning
TERRAMIN AUSTRALIA LIMITED Bushfire Prevention and Emergency Response Planning
Slide 33: Bushfire Prevention - Currently
Bushfire Prevention - Currently Rotational grazing – 5 paddocks Slashing of other fencelines/paddocks Gradual replacement of introduced pasture grasses with native C3 and C4 perennial to reduce fire fuel loading Exotic grasses (phalaris & cocksfoot) 17-27 t/Ha Native grasses (C3/C4) 1.5-8
Slide 34: Bushfire Prevention - Currently
Bushfire Prevention - Currently Rotational grazing – 5 paddocks Slashing of other fencelines/paddocks Gradual replacement of introduced pasture grasses with native C3 and C4 perennial to reduce fire fuel loading Exotic grasses (phalaris & cocksfoot) 17-27 t/Ha Native grasses (C3/C4) 1.5-8
Slide 35: Bushfire Prevention - Currently
Bushfire Prevention - Currently Rotational grazing – 5 paddocks Slashing of other fencelines/paddocks Gradual replacement of introduced pasture grasses with native C3 and C4 perennial to reduce fire fuel loading Exotic grasses (phalaris & cocksfoot) 17-27 t/Ha Native grasses (C3/C4) 1.5-8
Slide 36: Bushfire Prevention – during mining operations
Bushfire Prevention – during mining operations “Hot works” permits for all activities which have risk of sparks – e.g. angle grinding, welding Fire hydrants and extinguishers located onsite Reticulated irrigation systems can be used for fire prevention More water access points across site
Slide 37: Emergency Response Management
Emergency Response Management Emergency response management plan – required under SA Work Health and Safety Regulations 2012 Based on a risk assessment process Reviewed at least annually Regular drills and mock scenarios Like any other location – 000 services are available and would be cal
Slide 38: Regulations
Regulations SA Work Health and Safety Regulations 2012 – 1.7.2016 43—Duty to prepare, maintain and implement emergency plan A person conducting a business or undertaking at a workplace must ensure that an emergency plan is prepared for the workplace, that provides for the following: (a) emer
Slide 39: Emergency incidents
Emergency incidents Fire Hazchem Response Vehicle extraction Search and Rescue First Aid TERRAMIN AUSTRALIA LIMITED SLIDE No. 39
Slide 40: ERT Teams
ERT Teams Nationally accredited training programs and qualifications State, National and International competitions held between mine sites. Opportunities to combine training and resources with other emergency services organisations Can provide additional support to community incidents TERRA
Slide 41: ERT organisation
ERT organisation Typical arrangement one team per shift made up of personnel on site 6-8 persons per shift First responders to incidents on site Ongoing training Accredited courses On site mock emergencies Opportunities for local services to be involved TERRAMIN AUSTRALIA LIMITED SLIDE
Slide 42: Proposed outcome
Proposed outcome 1. No public injuries or deaths as a result of fires originating in the proposed mining lease that could have been reasonably prevented. 2. No unplanned fires on site and ensure control measures are in place to manage potential offsite impacts. 3. No permanent loss of abundance, con
Terramin Australia — Corporate Update (February 2018) on 6ix