  1. Slide 1: Building the Next Gold Mine in the Homestake District

    Building the Next Gold Mine in the Homestake District NYSE American: DC 38th Annual Mining Forum Americas September 29, 2026 dakotagoldcorp.com

  2. Slide 2: Disclaimer

    Disclaimer Dakota Gold is focused Forward-Looking Statements on responsible This communication contains forward-looking statements within the meaning of Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Exchange Act of 1934, as amended. When used in this commun

  3. Slide 3: Dakota Gold – A unique investment opportunity

    Dakota Gold Dakota Gold, NYSE – A unique investment opportunity American: DC is a • Gold and Silver prices and demand at record highs during a time of production deficits unique investment • Leadership team with track record success opportunity for • Advancing the Richmond Hill Gold Project, one of

  4. Slide 4: Homestake District: New Opportunities

    Richmond Hill Homestake District: New Opportunities​ Maitland Gold Project Gold Project Legend - Dakota Gold holds ~50k mineral acres in the • Private Land Homestake District • Over 3,000 mineral acres​​ • Private Land​ • Development stage Dakota Gold Land Package​ Richmond Hill – Private Land • 2,3

  5. Slide 5: Richmond Hill – IACF supports simple, open pit, heap leach project

    Richmond Hill – IACF supports simple, open pit, heap leach project​ (US$) M&I plan MI&I plan (US$) M&I plan MI&I plan Key Assumptions LOM AISC (Cash Cost plus $1,047 $1,050 Sustaining Cost) Base Case Gold Price $2,350/oz $2,350/oz Capital Costs Base Case Silver Price $29.00/oz $29.00/oz Initial Capi

  6. Slide 6: Richmond Hill - M&I plan production and cost profile

    Richmond Hill - M&I plan production and cost profile​ M&I plan 153,000 oz/yr GOLD PRODUCTION 2.6 Moz GOLD LOM PRODUCTION (17-year mine life) 8.7 Moz SILVER LOM PRODUCTION (17-year mine life) US$1,047/oz LOM AISC (US$2,350/oz Gold Price) (US$29/oz Silver Price) dakotagoldcorp.com | NYSE-A: DC 6

  7. Slide 7: Richmond Hill – IACF proposed mine plan

    Richmond Hill – Water Overburden Storage Area IACF proposed mine plan Treatment Plant (Reclaimed) North Leach Pad 3 Storm Event Reclaimed Conveyance Mined Area Spillway Leach Pad 2 • 580 acres of net disturbance is anticipated with the initial permit Mined Area Updated PFS • Initial mining to start

  8. Slide 8: Richmond Hill - 2025 to 2027 drill campaigns

    Richmond Hill - 2025 to 2027 drill campaigns Northern Expansion • 2025-2026 Drilling– 46,552 m (152,000 ft) of drilling completed in 354 holes. Adding ~30% new drilling data relative to the IACF to inform Q4 2026 PFS. • 2026-2027 Drilling– targeting ~3,800 m (~12,500 ft) of metallurgical drilling th

  9. Slide 9: Richmond Hill – 2025 and 2026 expansion drilling

    Richmond Hill – 2025 and 2026 expansion drilling • The 2025 and 2026 northeast expansion drill programs covered an area of 580 meters north-south and 730 meters east-west past the current M&I boundary. • Results will inform the 2026 Pre-Feasibility Study. • Higher-grade gold expansion drilling inter

  10. Slide 10: Richmond Hill – Pre-Feasibility trade-off studies

    Richmond Hill – Pre-Feasibility trade-off studies • Mining and Stacking Tonnage Rates o IACF 30,000 tpd versus 60,000 tpd optimized mining throughput and stacking rate to maximize ounce profile, cash flow, LOM timeline, and overall project financials Conveyor Stack o Crushing and stacking rates will

  11. Slide 11: Richmond Hill - Location and infrastructure

    Richmond Hill Dakota Gold Project Map - Location and JB Gold Zone infrastructure Unionville Zone Location: Richmond Hill Proposed Powerline • Project 15-minute drive from 3 km north of Maitland Wharf headquarters in Lead Existing Powerline Labor: • South Dakota provides access to labor for Access ro

  12. Slide 12: Richmond Hill - timeline to production

    Richmond Hill - timeline to production - Targeting first gold production in 2029 through a disciplined, phased responsible development approach that systematically de-risks Richmond Hill. 2026 2027 2028 2029 2030 Pre-Feasibility Study Feasibility Study Baseline Data Collection Permitting - County Co

  13. Slide 13: Maitland Gold Project - High-grade exploration optionality

    Maitland Gold Project - High-grade exploration optionality Gold bearing Homestake Formation (red to blue; shallow to deep) Mined out ore bodies (Precambrian Au) Projected to the surface Gold Mineralization in Ledges DC Precambrian Au drill hole intercepts Projected to the surface Maitland Project Ho

  14. Slide 14: Maitland – Unionville 2026 maiden resource infill drill plan

    Maitland – Unionville 2026 maiden resource infill drill plan • Planned 5,578 meters (18,300 feet) infill drill campaign in 44 holes with maiden resource H1 2027 • Step-out drilling near underground workings with historic production, but no historic drilling or surface sampling • Conceptual target ba

  15. Slide 15: Opportunity for increased valuation

    Opportunity for increased valuation • Opportunity for $EV/oz valuation to increase as Richmond Hill advances through Feasibility Study and into Production. 2026E 100 kozpa as EV (US$M) EV Developer US$EV/ Resource oz Company (US$M) Prod'n (AuEq koz) % of production per 100kozpa Alamos Gold $11,685 5

  16. Slide 16: Dakota Gold NYSE American: DC

    Dakota Gold Senior Management & Board Own ~8% Jan 1, 2025 – Sept 4, 2026 Dakota Gold 170% Spot Gold +68% NYSE American: DC Alignment with Shareholders​ Performance S&P 500 +31% CAPITAL STRUCTURE Robert Quartermain (in millions) (Jun 30, 2026) - Co-Chair and Director, 6.0% SSgA Funds, 5.5% Shares Out

  17. Slide 17: Significant Gold Optionality for Shareholders 2026/2027 Milestones

    Significant Gold Optionality 2026 /2027 Milestones for Shareholders Richmond Hill – Advancing • Richmond Hill - S-K 1300 Initial Feasibility and Permitting Assessment with Cash Flow outlined • Infill and expansion drilling 2.6 Moz Au and 8.7 Moz Ag life of mine • Metallurgical testing production wit

  18. Slide 18: NYSE American: DC

    MEDIA AND INVESTOR RELATIONS Jack Henris Chief Executive Officer, President and Director O +1 605 717 2540 Shawn Campbell Chief Financial and Development Officer info@dakotagoldcorp.com O +1 778 655 9638 Carling Gaze @dakotagoldcorp Director of Investor Relations O +1 605 679 7429 linkedin.com/compa