  1. Slide 1: Building the Next Gold Mine in the Homestake District

    Building the Next Gold Mine in the Homestake District NYSE American: DC Precious Metals Summit Beaver Creek September 24, 2026 dakotagoldcorp.com

  2. Slide 2: Disclaimer

    Disclaimer Dakota Gold is focused Forward-Looking Statements on responsible This communication contains forward-looking statements within the meaning of Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Exchange Act of 1934, as amended. When used in this commun

  3. Slide 3: Dakota Gold – A unique investment opportunity

    Dakota Gold Dakota Gold, NYSE – A unique investment opportunity American: DC is a • Gold and Silver prices and demand at record highs during a time of production deficits unique investment • Leadership team with track record success opportunity for • Advancing the Richmond Hill Gold Project, one of

  4. Slide 4: Homestake District: New Opportunities

    Richmond Hill Homestake District: New Opportunities​ Maitland Gold Project Gold Project Legend - Dakota Gold holds ~50k mineral acres in the • Private Land Homestake District • Over 3,000 mineral acres​​ • Private Land​ • Development stage Dakota Gold Land Package​ Richmond Hill – Private Land • 2,3

  5. Slide 5: Richmond Hill – IACF supports simple, open pit, heap leach project

    Richmond Hill – IACF supports simple, open pit, heap leach project​ (US$) M&I plan MI&I plan (US$) M&I plan MI&I plan Key Assumptions LOM AISC (Cash Cost plus $1,047 $1,050 Sustaining Cost) Base Case Gold Price $2,350/oz $2,350/oz Capital Costs Base Case Silver Price $29.00/oz $29.00/oz Initial Capi

  6. Slide 6: Richmond Hill - M&I plan production and cost profile

    Richmond Hill - M&I plan production and cost profile​ M&I plan 153,000 oz/yr GOLD PRODUCTION 2.6 Moz GOLD LOM PRODUCTION (17-year mine life) 8.7 Moz SILVER LOM PRODUCTION (17-year mine life) US$1,047/oz LOM AISC (US$2,350/oz Gold Price) (US$29/oz Silver Price) dakotagoldcorp.com | NYSE-A: DC 6

  7. Slide 7: Richmond Hill - 2025 to 2027 drill campaigns

    Richmond Hill - 2025 to 2027 drill campaigns Northern Expansion • 2025-2026 Drilling– 46,552 m (152,000 ft) of drilling completed in 354 holes. Adding ~30% new drilling data relative to the IACF to inform Q4 2026 PFS. • 2026-2027 Drilling– targeting ~3,800 m (~12,500 ft) of metallurgical drilling th

  8. Slide 8: Richmond Hill - timeline to production

    Richmond Hill - timeline to production - Targeting first gold production in 2029 through a disciplined, phased responsible development approach that systematically de-risks Richmond Hill. 2026 2027 2028 2029 2030 Pre-Feasibility Study Feasibility Study Baseline Data Collection Permitting - County Co

  9. Slide 9: Maitland – Unionville Zone

    Maitland – Unionville Zone • Extensive zone of continuous Tertiary Long Section (A-A’) epithermal gold mineralization A Target Extension Surface Rock Chip Samples • Open in all directions • Target extension strike extends for at least 2,000 meters (6,500 feet) • With inclusion of rock chip samples,

  10. Slide 10: Maitland Gold Project - High-grade exploration optionality

    Maitland Gold Project - High-grade exploration optionality Gold bearing Homestake Formation (red to blue; shallow to deep) Mined out ore bodies (Precambrian Au) Projected to the surface Gold Mineralization in Ledges DC Precambrian Au drill hole intercepts Projected to the surface Maitland Project Ho

  11. Slide 11: Opportunity for increased valuation

    Opportunity for increased valuation • Opportunity for $EV/oz valuation to increase as Richmond Hill advances through Feasibility Study and into Production. 2026E 100 kozpa as EV (US$M) EV Developer US$EV/ Resource oz Company (US$M) Prod'n (AuEq koz) % of production per 100kozpa Alamos Gold $11,685 5

  12. Slide 12: Dakota Gold NYSE American: DC

    Dakota Gold Senior Management & Board Own ~8% Jan 1, 2025 – Sept 4, 2026 Dakota Gold 170% Spot Gold +68% NYSE American: DC Alignment with Shareholders​ Performance S&P 500 +31% CAPITAL STRUCTURE Robert Quartermain (in millions) (Jun 30, 2026) - Co-Chair and Director, 6.0% SSgA Funds, 5.5% Shares Out

  13. Slide 13: Significant Gold Optionality for Shareholders 2026/2027 Milestones

    Significant Gold Optionality 2026 /2027 Milestones for Shareholders Richmond Hill – Advancing • Richmond Hill - S-K 1300 Initial Feasibility and Permitting Assessment with Cash Flow outlined • Infill and expansion drilling 2.6 Moz Au and 8.7 Moz Ag life of mine • Metallurgical testing production wit

  14. Slide 14: NYSE American: DC

    MEDIA AND INVESTOR RELATIONS Jack Henris Chief Executive Officer, President and Director O +1 605 717 2540 Shawn Campbell Chief Financial and Development Officer info@dakotagoldcorp.com O +1 778 655 9638 Carling Gaze @dakotagoldcorp Director of Investor Relations O +1 605 679 7429 linkedin.com/compa