Dakota Gold Corp. · AMEX:DC
Dakota Gold — Investor Presentation (November 2026)
37 slides from Dakota Gold's investor presentation, Nov 25, 2026

Slide 1: Building the Next Gold Mine in the Homestake District
Building the Next Gold Mine in the Homestake District NYSE American: DC Investor Presentation | November 2026 dakotagoldcorp.com

Slide 2: Disclaimer
Disclaimer Cautionary Note Regarding Forward-Looking Statements This presentation and any related oral statements contain “forward-looking statements” within the meaning of Section 27A of the Securities Act of 1933 and Section 21E of the Securities Exchange Act of 1934. These statements are intende

Slide 3: Responsibly developing the next gold mine in the Homestake District
Dakota Gold – Responsibly developing the next gold mine in the Homestake District, South Dakota EXPERIENCED TEAM Management with Track Record Success Extensive experience building and operating gold mines FLAGSHIP PROJECT ON PRIVATE LAND Maitland Richmond Hill Located in the prolific Homestake Distr

Slide 4: Richmond Hill Gold Project
RICHMOND HILL GOLD PROJECT Near Term Development Project Targeting Production in 2029 dakotagoldcorp.com | NYSE-A: DC 4

Slide 5: PFS supports simple, open pit, heap leach project
Richmond Hill – PFS supports simple, open pit, heap leach project Richmond Hill Pre-Feasibility Study outlines an efficient, three stage crush and truck stack operation to provide strong economics and leverage to the gold price GOLD PRICE AFTER-TAX NPV 5% AFTER-TAX IRR AFTER-TAX PAYBACK LOM AISC US

Slide 6: PFS outlines strong foundation for future growth and mine sequence optimization
Richmond Hill – PFS outlines strong foundation for future growth and mine sequence optimization Pre-Feasibility Key Parameters Growth potential (All Currencies in US$) Key Assumptions with Base Case Gold $3,500/oz Gold / Silver $50/oz 2026-2027 DEFINITION DRILL Production Profile Unit Operating Cost

Slide 7: Reserve and Resource review
Richmond Hill – Reserve and Resource review PFS Mineral Reserve and Resource - November 2026 • Heap Leachable Mineral Reserve: • 2.2 M oz of P&P Gold • 25.4 M oz of P&P Silver • Heap Leachable Mineral Resource: (Exclusive of Reserves) • 0.4 M oz of M&I Gold • 5.2 M oz of M&I Silver • 1.1 M oz of Inf

Slide 8: Resource growth opportunities
Richmond Hill – Resource growth opportunities • The 2026-2027 Definition Drill Program includes approximately 11,000 meters in 123 holes and is designed to test the potential to convert Inferred Mineral Resources within and adjacent to the PFS pit to Measured and Indicated (M&I) N • The Definition D

Slide 9: PFS plan production & cost profile
Richmond Hill – PFS plan production & cost profile Gold Equiv Prod (kozs) Gold Prod (kozs) Gold Grade (g/t) YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 YEAR 6 YEAR 7 YEAR 8 YEAR 9 YEAR 10 250 PFS 171,000 oz/yr 200 AVG GOLD PRODUCTION Gold Production (1,000’s oz) 150 1.6 Moz GOLD LOM PRODUCTION (9-year mine

Slide 10: PFS mine production schedule
Richmond Hill – PFS mine production schedule Mine Sequence • Eight-year mining, focusing on grade and recoveries to bring value forward Years 1 – 2: Sub-phasing high grade smaller pits Years 3 – 5: Higher value ultimate pits Years 6 – 8: Final pits and mining • Peak mining rates ~36mt per year star

Slide 11: PFS heap leach pad production profile
Richmond Hill – PFS heap leach pad production profile • Quick recovery – 30-to-45-day average leach cycle to achieve a projected LOM pad recovery of 72.4% • Heap leach pad with Merrill Crowe processing designed for with a capacity of 41ktpd but with potential future expansion to 54ktpd • Residual p

Slide 12: PFS proposed layout & infrastructure
Richmond Hill – PFS proposed layout & infrastructure • Existing powerline and road access 15-min drive to headquarters in Lead, SD • Concurrent reclamation with mining to reduce disturbance footprint backfill, reshape and revegetate to approved design plan • Conventional truck & shovel open pit oper

Slide 13: Processing flow sheet
Richmond Hill - Processing flow sheet Three stage, crush, shovel and truck operation processing ~41kTPD dakotagoldcorp.com NYSE-A: DC dakotagoldcorp.com || NYSE-A: DC 13

Slide 14: Timeline to production
Richmond Hill - Timeline to production - Targeting first gold production in 2029 through a disciplined, phased responsible development approach 2026 2027 2028 2029 2030 Pre-Feasibility Study Feasibility Study Baseline Data Collection Permitting - County Conditional Use Permit - SD DANR Large Scale M

Slide 15: PFS strong economics
Richmond Hill – PFS strong economics • The PFS has robust project economics, including a $2.0 billion NPV(5%), 71% IRR and a payback of only 1.4 years at a base case gold price of $3,500/oz. The financial metrics remain robust in a lower gold price environment, and at a gold price of $4,250/oz the

Slide 16: PFS after-tax free cash flow profile
Richmond Hill – PFS after-tax free cash flow profile • For years 1 through 8 the average after-tax free cash flow per year is ~$366 M at a gold price of $3,500/oz and $474 M at a gold price of $4,250/oz PRE-PROD YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 YEAR 6 YEAR 7 YEAR 8 YEAR 9 YEAR 10 YEAR 11 LOM $4,0

Slide 17: Benchmarking grade and strip ratio for USA heap leach projects
Benchmarking grade and strip ratio for USA heap leach projects • Richmond Hill has the highest strip-adjusted gold grade among comparable USA heap leach projects Grade (g/t Au) Strip Ratio (w:o) Strip-Adjusted Grade (g/t mined) Santa Fe 0.76 DeLamar 0.54 Richmond Hill 0.26 Wharf 0.71 CC&V 0.65 CC&V

Slide 18: Opportunity for increased valuation
Opportunity for increased valuation • Opportunity for $EV/oz of Resources and Reserves valuation to increase as Richmond Hill advances through Feasibility Study and into Production. Developer US$EV/ RESOURCE oz Developer US$EV/ RESERVE oz Source: CIBC Weekly Mining Comps as at Nov 2, 2026 dakotagold

Slide 19: Illustrative peer production multiples
Illustrative peer production multiples Source: CIBC Weekly Mining Comps Report as of Nov 2, 2026 170 KOZPA as 1.TEV = market cap + net debt + non-controlling interest + preferred shares 2026E Prod'n EV (US$M) 2.Analyst consensus estimates. COMPANY TEV (US$M)1 % of (AuEq koz)2 per 170 KOZPA PRODUCTIO

Slide 20: Maitland Gold Project
MAITLAND GOLD PROJECT High-Grade Underground Gold Exploration Opportunity dakotagoldcorp.com | NYSE-A: DC 20

Slide 21: Maitland Gold Project - High-grade exploration optionality
Maitland Gold Project - High-grade exploration optionality Gold bearing Homestake Formation (red to blue; shallow to deep) Mined out ore bodies (Precambrian Au) Projected to the surface Gold Mineralization in Ledges DC Precambrian Au drill hole intercepts Projected to the surface Maitland Project Ho

Slide 22: Maitland – JB Gold Zone analogous to West Ledge System
Maitland – JB Gold Zone analogous to West Ledge System North South 2.5 m @ 5.25 g/t 6.4 m @ 1.5 m @ 9.46 g/t 8.24 g/t 4.4 m @ 2.0 m @ 25.03 g/t 4.70 g/t 5.5 m @ 3.84 g/t 3.2 m @ 300 10.01 g/t meters 6.4 m @ 4.77 g/t 5.0 m @ 19.54 g/t 21 Ledge 2.5 M oz Au 600 Meters Long Section View Homestake Mine 2

Slide 23: Maitland – Unionville Zone
Maitland – Unionville Zone • Extensive zone of continuous Tertiary Long Section (A-A’) epithermal gold mineralization A Target Extension Surface Rock Chip Samples • Open in all directions • Target extension strike extends for at least 2,000 meters (6,500 feet) • With inclusion of rock chip samples,

Slide 24: Maitland – Unionville 2026 maiden resource infill drill plan
Maitland – Unionville 2026 maiden resource infill drill plan • 5,578 meters (18,300 feet) infill drill campaign in 44 holes • Drilling in 2026 and maiden resource H1 2027 • Step-out drilling near underground workings with historic production, but no historic drilling or surface sampling • Conceptual

Slide 25: Corporate Structure
CORPORATE STRUCTURE A strong foundation for responsible development in the Homestake District, South Dakota dakotagoldcorp.com | NYSE-A: DC 25

Slide 26: Dakota Gold is a responsible operator
Dakota Gold is a responsible operator HEALTH AND SAFETY • 5 consecutive years with ZERO Lost-Time Incidents (2021 to 2025) ENVIRONMENTAL STEWARDSHIP • ZERO Notices of Environmental Violation since drilling began in 2022 • Comprehensive environmental baseline studies underway, including groundwater a

Slide 27: Management
~87% of Dakota Gold employees live in South Directors and Management Dakota with 10 South Dakota School of Mines alumni, students or former faculty Robert Quartermain Over 45 years in the mining and resource industry including past Executive Brian Iverson More than 30 years of experience in the util

Slide 28: Share Ownership & Performance
Dakota Gold Share Ownership & Performance (Nov 20, 2026) NYSE American: DC MANAGEMENT & BOARD 8% CAPITAL STRUCTURE (in millions) (Sept 30, 2026) Shares Outstanding 134 ONE YEAR Stock Options 2.4 PERFORMANCE RSU and PSU 1.4 RETAIL (Nov 20, 2026) 31% Fully Diluted 138.1 INSTITUTIONAL Dakota Gold +8

Slide 29: One location. Multiple opportunities.
HOMESTAKE One location. Multiple opportunities. DISTRICT Dakota Gold’s land package creates a diversified project-development portfolio in one of America’s most prolific gold districts. ~50K MINERAL ACRES DEVELOPMENT PROJECT RICHMOND HILL Production pathway and Pre-Feasibility Feasibility Permitting

Slide 30: Media and Investor Relations
MEDIA AND INVESTOR RELATIONS Jack Henris Chief Executive Officer, President and Director O +1 605 717 2540 Shawn Campbell Chief Financial and Development Officer info@dakotagoldcorp.com O +1 778 655 9638 Carling Gaze @dakotagoldcorp Director of Investor Relations O +1 605 679 7429 linkedin.com/compa

Slide 31: Appendix
APPENDIX dakotagoldcorp.com | NYSE-A: DC 31

Slide 32: Heap leachable reserves and resources
Richmond Hill – Heap leachable reserves and resources Richmond Hill Heap Leachable Reserves Notes: NSR Gold Silver • Mineral resources reported are exclusive of reserves. Category Ktonnes Gold (koz) Silver (koz) • Based on a constrained block model using drill results up to June 17, 2026, ($/tonne)

Slide 33: Millable Resources
Richmond Hill – Millable Resources Notes: NSR Gold Silver • Based on a constrained block model using drill results up to June 17, 2026, Category Ktonnes Gold (koz) Silver (koz) ($/tonne) (g/tonne) (g/tonne) with estimation using inverse distance squared methodology. • A gold price of $2,900 per ounc

Slide 34: Combined Heap Leachable and Millable Resources Inclusive of Reserves
Richmond Hill – Combined Heap Leachable and Millable Resources Inclusive of Reserves Notes: NSR Gold Silver Gold • Based on a constrained block model using drill results up to June 17, 2026, Category Ktonnes Silver (koz) ($/tonne) (g/tonne) (g/tonne) (koz) with estimation using inverse distance squa

Slide 35: PFS capital and operating cost details
Richmond Hill – PFS capital and operating cost details US$/tonne Capital Cost Items (US$M) Initial Sustaining LOM Operating Cost Items LOM (US$M) US$/oz Au leached Ore Preparation (Earthworks and Crushing circuit) $127.2 $0.0 $127.2 Mining $787.9 $6.59 $505 Heap Leach Pad, Ponds and Pump System $87.

Slide 36: Strong project financial metrics
Richmond Hill – Strong project financial metrics $3,500/oz Au (Base Case) $4,250/oz Au Net Present Value discounted at 5% to Initial Capital Cost Ratio NPV5% @ $3,500/ oz Gold Price $2,000 M $2,744 M Initial Capital Cost $538 M $538 M Ratio of NPV5%: CAPEX 3.7 X 5.1 X Number of Times Initial CAPEX i

Slide 37: County and State Permits – Mining permit pathways
County and State Permits – Mining permit pathways Large Scale Mine Permit Conditional Use Permit State — SD DANR County — Lawrence County 1 Baseline Data 1 Conditional Use Permit 2025 pre-submission meetings; baseline plan approved. Required for specific land uses such as mining. 2 File Notice of In
Source: company website
More decks from Dakota Gold Corp.
Technical Presentation (November 2026)38 slides · Nov 23, 2026
Investor Presentation (November 2026)30 slides · November 2026
LD Micro 20th Annual Main Event (October 2026)21 slides · Oct 21, 2026
Investor Presentation (October 2026)30 slides · October 2026
38th Annual Mining Forum Americas (September 2026)18 slides · Sep 29, 2026
Precious Metals Summit Beaver Creek 202614 slides · Sep 24, 2026