Terramin Australia Limited · ASX:TZN
Terramin Australia — Shareholder Meeting (May 2017)
18 slides from Terramin Australia's shareholder meeting presentation, May 17, 2017
Slide 1: Terramin Australia Limited Annual General Meeting 17 May 2017
TERRAMIN AUSTRALIA LIMITED For personal use only Annual General Meeting 17 May 2017
Slide 2: Disclaimer & Competent Person Statement
Disclaimer & Competent Person Statement For personal use only Disclaimer This presentation has been prepared by Terramin Australia Limited (Terramin). It is current as at the date of this presentation. It contains information in a summary form and should be read in conjunction with Terramin’s other
Slide 3: Overview
Overview For personal use only 1. About Terramin 2. Highlights 3. Tala Hamza Zinc Project 4. Update on Global Zinc Market 5. Bird-in-Hand Gold Project 6. South Australian Exploration 7. Focus for 2017 TERRAMIN AUSTRALIA LIMITED SLIDE No. 3
Slide 4: About Terramin Australia Limited
About Terramin Australia Limited For personal use only World class base metal and gold portfolio Tala Hamza Zinc Project - Resource of 68.6 million tonnes at 4.6% Zinc, 1.1% Lead (3.9 million + tonnes of zinc and lead) Bird-in-Hand Gold Project – Resource of 252,000 ounces at 13.3gt All projec
Slide 5: Highlights
Highlights For personal use only Tala Hamza Project design well advanced to reduce environmental and capital expenditure. Algerian partners and regulators indicate strong support for project changes. “On ground” technical studies at Tala Hamza close to finalisation. Bird in Hand Draft Bi
Slide 6: World class resource containing 3.9 million tonnes of zinc and lead
Tala Hamza Zinc Project For personal use only World class resource containing 3.9 million tonnes of zinc and lead Joint venture with Algerian government owned entity (65% Terramin) Infrastructure deep water port (15kms) international airport (10kms) plentiful water Low Operating Cost
Slide 7: Background on Algeria
Tala Hamza Zinc Project For personal use only Background on Algeria Largest country in Africa by land mass and third largest African economy. Stable economy with over $114 billion of foreign exchange reserves (as at December 2016). Major export is hydrocarbons and is second largest supplier of
Slide 8: Terramin and its Algerian partners have agreed on final design of project
Tala Hamza Zinc Project For personal use only Terramin and its Algerian partners have agreed on final design of project. Incorporates improved project design including dry stacking of tailings, smaller processing plant footprint and simplified mine design Project enhancements will reduce upfro
Slide 9: Compelling Economics
Tala Hamza Zinc Project For personal use only Compelling Economics Low upfront capital – Availability of local infrastructure reduces capital expenditure Competitive operating costs – low labour and energy costs drive low cash costs Concessional local funding – potential for local long term
Slide 10: Global Zinc Markets
Global Zinc Markets For personal use only Mine closures have resulted in 5.6% reduction in supply in 2016. Demand for zinc remains robust supported by a stabilising Chinese economy and expectations of increasing infrastructure spending in major economies. It is estimated that the zinc market i
Slide 11: Global Zinc Markets
Global Zinc Markets For personal use only Zinc prices have rallied by from an average of USD 2,100 in 2016 to a current price of approximately USD 2,600. It has been as high as USD 2,900. Zinc stocks continue to fall. Zinc price rises are forecast by many industry experts. Source: Wood Mackenz
Slide 12: Adelaide Hills Project
Adelaide Hills Project For personal use only 100% Terramin. Bird-in-Hand Gold Project – Resource of 252,000 ounces at 13.3gt. Angas Zinc Mine Processing Plant – Existing 400,000 tonnes per annum base metals processing plant and tailings dam. 3,750 square kilometres of exploration tenements –
Slide 13: Bird-in-Hand Gold Project
Bird-in-Hand Gold Project For personal use only High grade gold and low start up capital drive strong financial returns. Processing through existing Angas Zinc Mine plant. Drilling has upgraded resource and reveals potential of the deposit. Engineering and environmental studies have been com
Slide 14: Bird-in-Hand Gold Project Exploration Potential
Bird-in-Hand Gold Project Exploration Potential For personal use only Existing Bird-in-Hand gold ore body is open at depth Bird-Extended and the Ridge recorded historical high grade production TERRAMIN AUSTRALIA LIMITED SLIDE No. 14
Slide 15: Gawler Ranges – Strong Foundation
Gawler Ranges – Strong Foundation For personal use only 100% Terramin Menninnie Dam - Inferred Resource of 7.7Mt @ 3.1% Zn and 2.6% Pb, and 27g/t Ag Large scale copper/gold potential (Olympic Dam nearby) 4,754 km2 tenement holding Further prospective targets identified with active explorat
Slide 16: Strong Growth potential
Strong Growth potential For personal use only Tala Hamza Zinc Project – Algeria (65%) Excellent relationship with JV partner and government Revised DFS and EIS based on new project structure On path towards decision to mine and approval Adelaide Hill Project - South Australia (100%) 252,
Slide 17: Focus for 2017
Focus for 2017 For personal use only Complete Tala Hamza technical studies Update project Resources and Reserves Proceed to Decision to Mine and lodge mining lease application Progress land acquisition and financing options with Algerian government Complete and lodge BIH Mining Lease appli
Slide 18: Terramin Australia Limited Annual General Meeting 17 May 2017
TERRAMIN AUSTRALIA LIMITED For personal use only Annual General Meeting 17 May 2017