  1. Slide 1: Refinancing Investor presentation

    Refinancing Investor presentation 8 May 2025

  2. Slide 2: Disclaimer

    Disclaimer This investor presentation has been prepared by Aeris Resources Limited FUTURE PERFORMANCE AND FORWARD-LOOKING STATEMENTS Aeris confirms that the form and context in which the Competent Person’s (“Aeris” or the “Company”). By attending an investor presentation or This presentation contain

  3. Slide 3: Refinancing Overview

    Refinancing Overview

  4. Slide 4: Refinance Summary

    Refinance Summary Binding term sheet executed with Washington H. Soul Pattinson (WHSP) for a $60 million Guarantee Facility to provide long-term environmental bonding, replacing the current $50 million ANZ Facility $10 million currently in restricted cash released to provide additional working capit

  5. Slide 5: New WHSP guarantee facility

    New WHSP guarantee facility Key terms $3.5 million per quarter commencing 12 months Provider: Washington H. Soul Pattinson and Company Cash Backing: from financial close First ranking security over all Aeris Group assets, Facility Limit: $60 million Security: subsidiaries and undertakings1 Term: 3 y

  6. Slide 6: WHSP term facility extension

    WHSP term facility extension Key terms Facility Limit: $50 million ($40 million drawn) Term: Extended to August 2026 $1.5 million extension fee Other Fees: 2% additional exit fee Further 2% fee on repayment if not repaid by 31 January 2026 Other : All other conditions remain the in place 6

  7. Slide 7: Company update

    Company update

  8. Slide 8: Aeris investment thesis

    Aeris investment thesis Weighted to copper FY25 production guidance 29 79 47 Australian copper focused miner with high margin Au Cu Ag gold cashflows to support growth Copper Gold Silver 27-32 kt 50-62koz 200-240koz • 40 – 48kt Cu eq1,3 FY25 guidance Established miner with • FY25 group production gu

  9. Slide 9: Immediate goals: a simplified, resilient portfolio

    Immediate goals: a simplified, resilient portfolio High-grade, diversified, copper resource, with +0.5Moz gold in Mineral Resource¹ to support strategic copper growth Assets aligned with strategic copper focus Au supporting strategic Cu growth Tritton Cracow 1.7% Cu eq 0.5Moz Au1 Jaguar 1.3Mt Cu eq1

  10. Slide 10: Aeris medium and long term goals

    Aeris medium and long term goals Leading ASX copper company targeting +50ktpa, high margin copper production underpinned by capital investments at Tritton Immediate Medium term Long term Goals • Fill Tritton mill • Maintain +5 year mine life • Develop Constellation  High margin, long life, Tritton

  11. Slide 11: Tritton

    Tritton New South Wales

  12. Slide 12: Tritton: our flagship asset

    Tritton: our flagship asset Strategically located, diversified copper operation with a 20 year operating history Copper production (kt)1 Mining Processing Logistics 30 30 26 27 27 24 24 25 Tritton / Budgerygar 21 23 23 23 19 20 17 • Tritton: Mature mine at depth, targeting high grade extensions • Bu

  13. Slide 13: Tritton: investment thesis

    Tritton: investment thesis Large scale copper • 100% owned, integrated mining complex operation • 1.8Mtpa processing facility • 2,300km2 tenement package, located in the highly prospective Cobar Basin Strategic location adjacent to several proven mining operations • Targeting ~30ktpa copper producti

  14. Slide 14: Reinvestment strategy for Tritton

    Reinvestment strategy for Tritton Key issue 1 – Underutilised mill capacity Strategy – Murrawombie 1.8Mtpa mill, the largest in the Cobar region, but underutilised New open pit • Historical production averaged 1.6Mtpa • Stripping commenced in February • Reduced to 1.2Mtpa over recent years • Will en

  15. Slide 15: Reinvestment strategy for Tritton (cont.)

    Reinvestment strategy for Tritton (cont.) Key issue 2 – Declining reserve life Strategy – Constellation • Ore Reserves have depleted over the last 5 years due to capital • Constellation deposit – the new potential baseload ore source: prioritisation at Cracow, Jaguar operational issues and working –

  16. Slide 16: Constellation overview

    Constellation overview Tritton’s future baseload copper-gold ore source Long section looking west showing the March 2025 Indicated and Inferred Mineral Resource Updated Mineral Resource Estimate 7.6Mt of 2.01% copper and 0.66g/t gold containing 153kt copper and 161koz gold1 Represents a 24% increase

  17. Slide 17: Constellation development pathway

    Constellation development pathway Potential long life mine from three stages 1. Oxide for heap leach • 1.5Mt @ 0.6% Cu with high-grade zones (1-2% Cu) March 2025 Constellation Mineral Resource • Starting 5m below surface Cu Au Ag Mining Cu Mineralisation Resource Tonnes Cu Au Ag Cut-off metal metal

  18. Slide 18: Other exploration potential

    Other exploration potential Multiple targets provide potential to further extend mine life Extensions: Tritton, Murrawombie, Avoca Tank and Budgerygar all still open at depth Kurrajong: high grade deposit, open at depth Budgery: potential open pit target located close to infrastructure Numerous othe

  19. Slide 19: Cracow

    Cracow Queensland

  20. Slide 20: Cracow

    Cracow High margin gold mine History of stable production and resource replacement (Au koz)2 710 500 520 510 530 520 450 350 390 460 High margin, underground gold mine located 500km northwest of Brisbane 1,069 1,160 1,250 1,340 1,421 1,509 1,582 1,636 1,684 1,730 Conventional crush and grind CIP pro

  21. Slide 21: Historical profitability

    Historical profitability Gold production (koz)1 History of stable operations and high margin cashflow 74 generation FY25 guidance 54 48 40-49 46 +220koz gold produced under Aeris ownership FY21 FY22 FY23 FY24 FY25 EBITDA (A$m)1 $45.9 million adjusted EBITDA generated in 1H FY25 $98.1 Q3 FY25 product

  22. Slide 22: Exploration

    Exploration Highly prospective greenfield targets Continuing to drill near mine targets in the Western Vein Field (WVF) for incremental additional ounces Priority conceptual greenfield targets with the potential to host new mineralised structures Western Frontier represents a potential new structura

  23. Slide 23: Other Assets

    Other Assets

  24. Slide 24: Jaguar

    Jaguar Brownfield copper/zinc restart opportunity Mineral Resource1 8Mt @ 1.3% Cu, 5.6% Zn, 0.5g/t Au and 65g/t Ag across 4 deposits Transitioned to care and maintenance in Q1 FY24 Potential restart on resources at Bentley with development out to high-grade Turbo lens Restart to include mill and inf

  25. Slide 25: Jaguar gold exploration

    Jaguar gold exploration Focus on five prospective areas ① 1. Heather Bore Shear – 12km structure including 2km shallow gold anomaly1 along strike from Northern Star’s Thunderbox operation ⑤ 2. Aesop – Halloween Trend – 6km structural corridor consider prospective but subject to limited exploration ②

  26. Slide 26: Stockman

    Stockman Concentrator flowsheet for Albion Process Long life, Cu-Zn-Au-Ag project with all primary permits Feasibility study well advanced 12 year mine plan producing at up to 850ktpa1 from a single deposit Potential to extend mine life with other known deposits Currawong mine plan Albion leaching t

  27. Slide 27: North Queensland

    North Queensland Mining completed; non-core tenement package Mining and processing now completed at Mt Colin Rehabilitation activities underway Part of an attractive 952km2 tenement package including the feasibility-stage Barbara project Considering options for divestment 27

  28. Slide 28: Aeris Resources

    Aeris Resources Set for growth in copper production with reset balance sheet and strong operating cash flows Refinance reset provides flexibility to deliver business strategy Strong Cracow cash flows to support copper growth Constellation the game changer – potential long life ore source to support

  29. Slide 29: Thank you

    7 Netis Thank you

  30. Slide 30: Appendix A Reserve and Resource Tables

    Appendix A Reserve and Resource Tables

  31. Slide 31: Group Ore Reserves

    Group Ore Reserves PROJECT CATEGORY TONNES (‘000) GRADE CONTAINED METAL Base Metals % Cu % Zn g/t Au g/t Ag kt Cu kt Zn koz Au koz Ag Tritton Proved 5 1.8 - - - 0.1 - - - Probable 2,790 1.5 - 0.3 5 41 - 23 451 Total 2,790 1.5 - 0.3 5 41 - 23 451 Jaguar Proved 90 1.4 8.7 0.8 74 1 8 2 225 Probable 1,0

  32. Slide 32: Group Mineral Resources

    Group Mineral Resources PROJECT CATEGORY TONNES (‘000) GRADE CONTAINED METAL Base Metals % Cu % Zn g/t Au g/t Ag kt Cu kt Zn koz Au koz Ag Tritton Measured 1,300 1.0 - 0.1 3 13 - 4 120 Indicated 11,200 1.4 - 0.3 4 145 - 91 1,280 Inferred 10,000 1.7 - 0.3 4 183 - 137 1,440 Total 22,500 1.5 - 0.3 4 34

  33. Slide 33: Tritton Mineral Resources

    Tritton Mineral Resources PROJECT CATEGORY TONNES (‘000) GRADE CONTAINED METAL Base Metals % Cu g/t Au g/t Ag kt Cu koz Au koz Ag Tritton Measured 1,300 1.0 0.1 3 13 4 120 Indicated 1,500 1.1 0.0 2 16 2 90 Inferred 1,200 1.3 0.2 7 16 10 290 Total 4,000 1.1 0.1 4 46 16 500 Murrawombie Measured - - -