Terramin Australia Limited · ASX:TZN
Terramin Australia — Non-Deal Roadshow (October 2014)
22 slides from Terramin Australia's roadshow presentation, Oct 30, 2014
Slide 1: Terramin Australia Limited Non-deal Investor Presentation - Singapore
TERRAMIN AUSTRALIA LIMITED For personal use only Non-deal Investor Presentation - Singapore 30 October 2014
Slide 2: Important Notice and Disclaimer & Competent Person Statement
Important Notice and Disclaimer & Competent Person Statement For personal use only Important information This presentation has been prepared by Terramin Australia Limited (Terramin). It is current as at the date of this presentation. It contains information in a summary form and should be read in co
Slide 3: About Terramin Australia Limited
About Terramin Australia Limited For personal use only World class quality base metal project and gold portfolio World Class Tala Hamza Zinc Project ready to permit Resource of 68.6 million tonnes at 4.6% Zinc, 1.1% Lead (Measured, Indicated and Inferred) Bird-in-Hand Gold Project – Inferred R
Slide 4: Projects
Projects For personal use only Tala Hamza Menninnie Adelaide Hills 695 000 mE 700 000 mE 705 000 mE 710 000 mE 715 000 mE Bejaia International 385 000 mN Port 385 000 mN International Airport Amaden 380 000 mN 380 000 mN Oued Ounadjel Oued Amizour Iheddaden Exploration Permit Tala Hamza Lbarkouk PE5
Slide 5: Fast facts
Fast facts For personal use only Australian Securities Exchange Listed (ASX:TZN) Listed in December 2003 Shares on Issue: 1,318 million Market Capitalisation: approximately $103 million Over 3400 shareholders Technical Cooperation Agreement in place with China Nonferrous Metal Industry’s
Slide 6: Fast facts: Key Shareholders, Directors and Management
Fast facts For personal use only Key Shareholders Asipac Group Tronic Enterprise Development China Nonferrous Metal Industry’s Foreign Engineering and Construction Investec Bank New Asia Wealth Investment Holdings Directors and Management Michael Kennedy (Chairman) Martin Janes (Chief Executive
Slide 7: Tala Hamza Zinc
Tala Hamza Zinc Project For personal use only 65% Terramin : 35% ENOF/ ORGM Location Infrastructure deep water port (15 kms) international airport (10 kms) plentiful water on lease Workforce proximity to city local universities iron and zinc mining history Low Operating Cost po
Slide 8: Tala Hamza Zinc: Background on Algeria
Tala Hamza Zinc Project For personal use only Background on Algeria Largest country in Africa by land mass and third largest African economy. Stable economy with $200 billion of foreign exchange reserves Major export is hydrocarbons and is second largest supplier of gas to Europe. Stable pol
Slide 9: Tala Hamza Zinc
Tala Hamza Zinc Project For personal use only Revised DFS recently completed by China Nonferrous Metal Industry’s Foreign Engineering and Construction based on new agreed mining method. DFS presented to Algerian Partner, review ongoing. Long mine life with additional ore is available to the so
Slide 10: Tala Hamza Zinc
Tala Hamza Zinc Project For personal use only Excellent regional potential around Tala Hamza TERRAMIN AUSTRALIA LIMITED SLIDE No. 10
Slide 11: Tala Hamza Zinc
Tala Hamza Zinc Project For personal use only World class project which is in the top ten biggest zinc deposits in the world Only large advanced zinc project owned by developing mining company Ownership Top Zinc Deposits in the world Mount Isa Xstrata McArthur River Xstrata Red Dog Teck Rampura
Slide 12: Zinc Market
Zinc Market For personal use only Major zinc supply deficit expected from 2015. Mine closures are expected to result in fall in western world zinc production. New mine development constrained by lack of large economic deposits Major Mine Closures (within 4 years) Mine Zinc Production (‘000t) C
Slide 13: Tala Hamza Zinc
Tala Hamza Zinc Project For personal use only Zinc market in deficit from 2015 with deficit widening from later in the decade. Source: Teck Resources TERRAMIN AUSTRALIA LIMITED SLIDE No. 13
Slide 14: Adelaide Hills
Adelaide Hills Project For personal use only 100% Terramin. Bird-in-Hand Gold Project – Inferred Resource of 235,000 ounces at 13.0gt Angas Zinc Mine Processing Plant – Existing 400,000 tonnes per annum base metals processing plant and tailings dam. 3,750 square kilometres of exploration ten
Slide 15: Bird-in-Hand Gold
Bird-in-Hand Gold Project For personal use only Scoping Study highlights strong economics Low operating costs Low start up capital Processing through existing Angas Zinc Mine plant Environmental studies are well underway with permitting to commence in 2015. Exploration potential down dip
Slide 16: Bird-in-Hand Gold Project Exploration Potential
Bird-in-Hand Gold Project Exploration Potential For personal use only Potential to discover additional high grade gold resources. Existing Bird-in-Hand ore body is open at depth. Bird-Extended and the Ridge recorded historical high grade production. TERRAMIN AUSTRALIA LIMITED SLIDE No. 16
Slide 17: Angas Zinc Mine
Angas Zinc Mine For personal use only Recently placed on “care and maintenance” after 5 years of production 400,000 tonne per annum polymetalic process plant with tailings dam and extensive infrastructure Exploration potential near mine Sunter Garwood Rankine Prospective zone for Rankine type
Slide 18: Regional Exploration Potential
Regional Exploration Potential For personal use only Exploration licenses over more than 300 historical base metal and gold mines. Most of the historical gold mines have not been tested by modern exploration methods. Exploration targets include: Wheal Barton – historic copper mine with repor
Slide 19: Menninnie – Strong Foundation
Menninnie – Strong Foundation For personal use only Project fully funded by JV partner, Musgrave Minerals Ltd Menninnie Central Zone - Inferred Resource of 7.7Mt @ 3.1% Zn and 2.6% Pb, and 27g/t Ag (March 2011) 1,609km2 tenement holding 160km from Port Pirie lead smelter High lead/zinc rat
Slide 20: Capability for Further Growth
Capability for Further Growth For personal use only Tala Hamza Zinc Project – Algeria (65%) DFS completed, development decision pending - $50 million spent to date Adelaide Hill Project - South Australia (100%) 235,000 ounce high grade gold project 400Ktpa processing plant Exceptional ex
Slide 21: Terramin and Zinc
Terramin and Zinc For personal use only Terramin is an opportunity for early stage investment in significant zinc exposure Zinc is the base metal favoured by most analysts, due to fundamentals of demand/supply that point to substantially higher prices over the next 3-5 years Zinc tied to steel
Slide 22: Terramin Australia Limited
TERRAMIN AUSTRALIA LIMITED For personal use only Non-deal Investor Presentation - Singapore 30 October 2014
Terramin Australia — Non-Deal Roadshow (October 2014) on 6ix