West Wits Mining Limited · ASX:WWI

West Wits Mining — Investor Presentation (September 2025)

21 slides from West Wits Mining's investor presentation, September 2025

  1. Slide 1: West Wits Mining

    WEST WITS MINING SOUTH AFRICA | NEAR-TERM GOLD PRODUCER | ASX:WWI SEPTEMBER 2025 Qala Shallows, Witwatersrand Basin Project, Gauteng ASX:WWI COPYRIGHT ©2025 ALL RIGHTS RESERVED Mining District, Johannesburg, South Africa

  2. Slide 2: Disclaimer

    DISCLAIMER FORWARD-LOOKING STATEMENTS The production target and financial forecasting reported under the Qala Shallows Definitive Feasibility Study (DFS) contain inferred mineral resources. The directors confirm that it is reasonable to include these inferred This presentation includes “forward-look

  3. Slide 3: Why invest in West Wits

    Why invest in West Wits Significant gold resource in the WBP – Mineral Resource Estimate WBP - Project 200 - significant growth Witwatersrand Basin Project (WBP) 5Moz Gold opportunity aimed to produce South Africa (65% measured & indicated categories)1 200 000oz Gold per annum Qala Shallows (Stage 1

  4. Slide 4: Corporate Snapshot

    CORPORATE SNAPSHOT Transforming into mid-tier gold producer CAPITAL STRUCTURE (ASX:WWI) Shares on issue 3.39B Unlisted Options (exercise price range 2.2c – 25c)* 84.4M Performance Rights 7.5M Convertible Notes^ 3 Market Capitalisation A$119M @ 3.5c per share (on 27/08/2025) Cash – 27/08/2025 A$2.5M

  5. Slide 5: Board & Executive Team

    BOARD & EXECUTIVE TEAM ASX-experienced Mining Eng. with Chartered Accountant commercial lawyer Geophysics and MBA. and Associate Member of with extensive Production experience in the Governance Institute involvement in assisting conventional narrow of Australia with and advising publicly tabular und

  6. Slide 6: Qala Shallows - DFS Financial Model & Funding

    QALA SHALLOWS - DFS FINANCIAL MODEL & FUNDING2 KEY FINANCIAL METRICS – DFS Base Case US$2,850/oz GOLD PRICE GOLD PRICE DFS - Financial Evaluation DEFINITIVE FEASIBILITY STUDY US$2,850/oz US$3,850/oz ▪ Post-Tax Free Cashflow of US$983m over Life-of-Mine Peak Funding US$44m US$31m ▪ AISC cost in lowes

  7. Slide 7: Qala Shallows - Mining Inventory & Ore Reserve

    QALA SHALLOWS - MINING INVENTORY & ORE RESERVE2 RUN OF MINE INVENTORY (INCLUSIVE OF ORE RESERVES) 2 RUN OF MINE INVENTORY Mineral Resource Tonnage Grade Content Content Estimate Category (Mt) (g/t) (kg) (oz) ▪ 1.03Moz Gold at 3.0g/t, inclusive of Ore Reserves ▪ Ore Reserves – 4.6Mt at 2.60g/t for 38

  8. Slide 8: Qala Shallows - Mining Plan

    QALA SHALLOWS - MINING PLAN Trackless development with conventional stoping – tried and tested ▪ Ore body is accessed from surface via a decline system developed from the existing Qala adit box cut ▪ The decline is located centrally in the mining area and the K9B footwall ▪ Stopes will be accessed v

  9. Slide 9: Qala Shallows - Production Schedule

    QALA SHALLOWS - PRODUCTION SCHEDULE GOLD PRODUCTION Updated DFS completed in July 2025 by Bara Consulting2 • DFS completed on first stage of development to deliver 944,000oz gold at AISC of US$1,289/oz • Initial production will provide a robust 30,000 tonne ore stockpile to facilitate delivery of 15

  10. Slide 10: WWI – Gold Resources

    WWI – GOLD RESOURCES GLOBAL MINERAL RESOURCE ESTIMATE (JORC 2012)1 Category Tonnage (Mt) Grade (g/t) Content (oz) Measured 10.07 4.60 1 595 000 Indicated 12.29 4.19 1 700 000 Measured & 23.00 4.45 3 295 000 Indicated Inferred 10.49 5.10 1 730 000 Total 33.49 4.66 5 025 000 ▪ Significant global Miner

  11. Slide 11: WBP – Location & Growth Potential

    WBP – LOCATION & GROWTH POTENTIAL SANDTON CBD 5. BIRD REEF CENTRAL (BRC) Gold & Uranium JOHANNESBURG CBD ▪ 2022 Scoping Study identified Five (5) distinct development stages for the Witwatersrand Basin Project with Stages 1 – 4 Gold Projects for a 27yr Life of Mine.4 ▪ Qala Shallows is Stage 1 of th

  12. Slide 12: WBP - MRE & Ore Reserve Growth

    WBP - MRE & ORE RESERVE GROWTH 6 5 0,35 GOLD OUNCES (MILLION) 0,38 WBP tenement area previously held by DRD Gold 4 0,29 which had a Historical MRE 1,51 1,49 - declared (2000 ASX Report) of - 0,28 1,37 12.8Moz at 4.6g/t Gold under 3 1,42 0,60 the previous JORC Code3. 1,21 1,44 1,42 2 1,38 1,31 WWI ha

  13. Slide 13: Targeting First Gold Pour Q1 2026

    TARGETING FIRST GOLD POUR Q1 2026 2024 2025E 2026E 2027E 2028E H1 H2 H1 H2 H1 H2 H1 H2 Progress completion of Project Finance package Mobilise mining contractors Commission underground mine development Build 30,000t stockpile & start deliveries to Sibanye First gold pour EPCM contract works – major

  14. Slide 14: Key Milestones Driving Value

    KEY MILESTONES DRIVING VALUE Milestones Catalysts 2021✓ Mining Right granted with 3.5Moz gold MRE8 ✓ Release updated Qala Shallows DFS including ✓ Stage 1 DFS confirms 278koz Reserves & AISC US$1,144/oz7 US$500M Post-Tax NPV7.5 (Jun-25) ✓ MRE increased to 4.3Moz Gold7 ✓ Execute project ownership to

  15. Slide 15: Mobilisation at Qala Shallows is Underway

    MOBILISATION AT QALA SHALLOWS IS UNDERWAY ASX:WWI PAGE | 15

  16. Slide 16: WBP Environmental, Social & Governance (ESG)

    WBP ENVIRONMENTAL, SOCIAL & GOVERNANCE (ESG) ENVIRONMENTAL STEWARDSHIP & BIODIVERSITY CONSERVATION ▪ Complete underground operation: Low noise and dust levels ▪ Small footprint & surface infrastructure: Low rehabilitation liability & minimal impact on surrounding environment ▪ Efficient water use mo

  17. Slide 17: westwitsmining.com | info@westwitsmining.com

    Qala Shallows Box Cut CHIEF EXECUTIVE OFFICER INVESTOR RELATIONS SOUTH AFRICA AUSTRALIA Rudi Deysel Keith Middleton Unit 8A, Sifon Industrial Park Level 6, 400 Collins Street 279 Sifon Street, Robertville Melbourne, Victoria rdeysel@westwitsmining.com keith@middletoncorporate.com.au Roodepoort Austr

  18. Slide 18: Experienced Management Team

    EXPERIENCED MANAGEMENT TEAM Mining Engineer with BSc Chemical experience managing Engineering, PGDip large, diverse teams in Industrial Engineering, mining operations, from and MBA. Experience shallow underground spans multiple business mining to deep level gold functions, including mining, operatio

  19. Slide 19: Appendix 1: Ore Reserve & Mineral Resource Estimate Statements

    APPENDIX 1: ORE RESERVE & MINERAL RESOURCE ESTIMATE STATEMENTS Table 1: WBP (JORC) Ore Reserve2 Declared Ore Reserve of 4.6MT at 2.6g/t for 383,934oz Gold2 Ore Reserve Notes: 1. No Inferred Mineral Resources are included in the Ore Reserves. ORE RESERVE STATEMENT FOR QALA SHALLOWS (JORC 2012) 2. The

  20. Slide 20: Appendix 2 - References

    APPENDIX 2 - REFERENCES 1. The original report was “WBP Global MRE Increases with New Prospecting Right” which was issued with consent of the Competent Person, Mr Hermanus Berhardus Swart. The report was released to the ASX on 16 December 2024 and can be found on the Company’s website (https://westw

  21. Slide 21: Appendix 2 – References continued

    APPENDIX 2 – REFERENCES continued 8. The original report was “Global Resource Grows by 428,000oz Au to 3.67Moz at Witwatersrand Basin Project” which was issued with consent of competent persons, Hermanus Berhardus Swart & Dr Andrew J. Tunks and released to the ASX on 16th July 2018 and can be found

West Wits Mining — Investor Presentation (September 2025) on 6ix