West Wits Mining Limited · ASX:WWI

West Wits Mining — Australian Gold Conference 2026

20 slides from West Wits Mining's conference presentation, Oct 13, 2026

  1. Slide 1: West Wits Mining Presentation - Australian Gold Conference | Sydney 2026

    ASX Announcement and Media Release Tuesday 13 October 2026 For personal use only West Wits Mining Presentation Australian Gold Conference | Sydney 2026 West Wits Mining Ltd (ASX: WWI) (OTCQB: WMWWF)("West Wits" or "the Company") advises that the Company’s Executive Team will attend the Australian Go

  2. Slide 2: South Africa's Newest Gold Producer

    rsonal use only ASX : WWI South Africa’s Newest Gold Producer Qala Shallows is in production and ramping to a 70,000 oz p.a. steady state1, with a scoping- study blueprint for future growth. MARCH 2026 70,000 oz p.a. 7.24 Moz @ 4.0 g/t Au2 FIRST GOLD POURED STAGE 1: DFS JORC MINERAL RESOURCE ASX:WWI

  3. Slide 3: Disclaimer

    Disclaimer Forward-looking Statements This presentation includes “forward-looking statements” as that term within the meaning of securities laws of applicable jurisdictions. Forward-looking statements involve known and unknown risks, uncertainties and other factors that are in some cases beyond West

  4. Slide 4: Why West Wits Mining Now

    THE INVESTMENT CASE Why West Wits Mining Now 01 02 03 rsonal use only Producing Gold Today Low Cost, High Margin Fully Funded to Steady State First gold poured in March 2026 DFS AISC of US$1,289/oz1 versus gold ~A$97M Absa/Nedbank package; Qala Shallows in production & ramping up price above US$4,00

  5. Slide 5: Capital Structure & Funding Position

    CA P I TA L ST R U CT U R E Capital Structure & Funding Position A$165M market cap + fully funded to steady-state + 74% project ownership rsonal use only Shares on Issue 435 M + 7.24Moz Au resource base2 Share Price (07 Oct-2026) A$0.38 FULLY FUNDED AND DE-RISKED TO STEADY STATE ~A$97M Absa / Nedban

  6. Slide 6: Australian Capital Unlocking a Mispriced South African Gold Asset

    THE OPPORTUNITY Australian Capital Unlocking a Mispriced South African Gold Asset West Wits has used Australian capital markets to develop a high-grade Witwatersrand asset that was overlooked by the rsonal use only local market. A Mispriced Asset The Right Capital Market A shallow, high-grade Witwat

  7. Slide 7: The Witwatersrand Basin

    A ST R AT EG I C P O S I T I O N I N T H E W O R L D ’ S M O ST P RO L I F I C G O L D BA S I N The Witwatersrand Basin West Wits sits in the Central Rand, with established rsonal use only infrastructure, adjacent operations & access to both brownfield & greenfield development potential. ~22% ofWitw

  8. Slide 8: 7.24Moz Au Base Supports Production & Growth

    THE PRODUCING ASSET 7.24Moz2 Au Base Supports Production 384 koz & Growth Ore Reserve @ 2.60 g/t1 1.03 Moz rsonal use only WBP GLOBAL JORC MRE 2 — INCLUSIVE OF ORE RESERVES Tonnes Grade Ounces Qala Shallows mining inventory @ 3.0 g/t1 Category (Mt) (g/t Au) (Moz) Measured 14.08 4.40 1.99 Indicated 1

  9. Slide 9: Qala Shallows - High Margins, Strong Returns

    THE FINANCIAL CASE Qala Shallows - High Margins, Strong Returns At Conservative Gold Assumptions DFS1 economics based on US$2,850/oz gold price assumption, well below current spot, highlighting strong operating rsonal use only leverage & downside resilience. US$2.7bn US$983M US$500M 81% LIFE-OF-MINE

  10. Slide 10: 17-year Production Profile with a ~70koz p.a. Steady-state Plateau

    QALA SHALLOWS – LIFE OF MINE 17-year Production Profile with a ~70koz p.a. Steady-state Plateau1 1000 90000 944,000 oz rsonal use only 900 80000 800 70000 Recovered gold over Life of Mine 700 Recovered gold (oz) 60000 ROM tonnes (kt) 600 500 50000 12 yr Steady State 40000 400 30000 300 20000 ~70,000

  11. Slide 11: Operational Ramp-Up is Well Underway

    THE PRODUCING ASSET Operational Ramp-Up is Well Underway September 2026 quarter – record 200m monthly underground (UG) development, haulage road complete & workforce rsonal use only up ten-fold from May-25 as West Wits building towards primary stope production from February 2027. 1,150m UG Developme

  12. Slide 12: Fully Funded and On Schedule to 70,000 oz p.a.

    T H E PAT H WAY TO ST E A DY- STAT E P RO D U C T I O N Fully Funded and On Schedule to 70,000 oz p.a. Key Milestones remain on track following receipt of the second senior debt drawdown (ASX, 7 October 2026). rsonal use only Oct 2026 · ACHIEVED Feb 2027 Q3 2027 Q4 2027 Q1 2029 Second drawdown Stopi

  13. Slide 13: Scoping Study: a Blueprint for Growth

    PROJECT 200 & BIRD REEF CENTRAL Scoping Study: a Blueprint for Growth The Project 200 scoping study is a conceptual blueprint showing how production could potentially scale towards 200,000 oz rsonal use only p.a. production rate from the existing 7.24 Moz Au Mineral Resource2 base, with uranium-gold

  14. Slide 14: ESG in action - Jobs, Safety & Local Enterprise

    RESPONSIBLE MINING ESG in action − Jobs, Safety & Local Enterprise 500+ workers on site rsonal use only Local enterprise Supporting local SMMEs & community vendors across catering, logistics & site services. Skills & employment Learnerships & local hiring are building workforce capability & supporti

  15. Slide 15: Derisked Operations in a Mining Friendly Jurisdiction

    THE FINAL CASE Derisked Operations in a Mining Friendly Jurisdiction Proven Geology 7.24Moz @ 4.0g/t Au2 rsonal use only Fully Funded First Gold Poured All Approvals in Place Toll-treatment: Near-Term Low-Cost Producer No Plant Build Absa & Nedbank, two leading Qala Shallows poured first gold Mining

  16. Slide 16: Building South Africa's next mid-tier gold producer

    ASX : WWI rsonal use only Building South Africa's next mid-tier gold producer. INVESTOR RELATIONS ir@westwitsmining.com · westwitsmining.com SOUTH AFRICA Unit 8A, Sifon Industrial Park, 279 Sifon Street, Robertville, Roodepoort 1709 AUSTRALIA Level 6, 400 Collins Street, Melbourne VIC 3000 ASX:WWI |

  17. Slide 17: Appendix

    rsonal use only Appendix West Wits Management Team · Ore Reserve & Mineral Resource statements · References ASX:WWI | West Wits Mining | October 2026

  18. Slide 18: Experienced Team to Deliver The Ramp-up and Growth Plan

    THE TEAM Experienced Team to Deliver The Ramp-up and Growth Plan Board rsonal use only Michael Quinert Rudi Deysel Simon Whyte Chairman (AUS) CEO / MD (SA) CFO / Co. Secretary (AUS) ASX-experienced commercial lawyer advising Mining engineer (MBA); underground, open-cast Chartered Accountant; mining,

  19. Slide 19: Ore Reserve & Mineral Resource

    APPENDIX 1 Ore Reserve & Mineral Resource Qala Shallows Ore Reserve (JORC 2012)1 rsonal use only Category Tonnes (Mt) Grade (g/t) Content (oz) NOTES Proved 1.10 2.79 99,205 Global MRE reported per the JORC Code (2012), Probable 3.49 2.54 284,730 inclusive of Ore Reserves. Total 4.60 2.60 383,934 Ree

  20. Slide 20: References

    APPENDIX 2 References 1. The original report was “Updates to Qala Shallows DFS provide improved results for Witwatersrand Basin Project” , which was issued with the consent of the rsonal use only Competent Person, Mr Andrew Pooley. The report was released to the ASX on 27 July 2023 and is available