West Wits Mining Limited · ASX:WWI
West Wits Mining — Africa Down Under 2026
19 slides from West Wits Mining's conference presentation, Sep 3, 2026
Slide 1: West Wits Mining Presentation - Africa Down Under | Perth 2026
ASX Announcement and Media Release Thursday 3 September 2026 West Wits Mining Presentation Africa Down Under | Perth 2026 West Wits Mining Limited (ASX: WWI) (OTCQB: WMWWF) advises that the executive team are attending key investor and industry events in Perth, Western Australia. CEO & Managing Dire
Slide 2: South Africa's Newest Gold Producer
ADU Investor Presentation · September 2026 For personal use only ASX : WWI South Africa’s Newest Gold Producer Qala Shallows is in production and ramping to a 70,000 oz p.a. steady state1, with a scoping- study blueprint for future growth. MARCH 2026 70,000 oz p.a. 7.24 Moz Au FIRST GOLD POURED STAG
Slide 3: Disclaimer
Disclaimer Forward-looking Statements This presentation includes “forward-looking statements” as that term within the meaning of securities laws of applicable jurisdictions. Forward-looking statements involve known and unknown risks, uncertainties and other factors that are in some cases beyond West
Slide 4: Why West Wits Mining Now
THE INVESTMENT CASE Why West Wits Mining Now For personal use only 01 02 03 Producing Gold Today Low cost, high margin Funded to Steady State First gold poured in March 2026 - Qala DFS AISC of US$1,289/oz 1versus gold ~A$97M Absa/Nedbank funding package Shallows is now in production & ramping to abo
Slide 5: Capital Structure & Funding Position
CAPITAL STRUCTURE A$194M market cap Capital Structure & Funding Position + fully funded to steady-state + 74% project ownership For personal use only Shares on issue 434.9 M + 7.24Moz Au resource base2 Share price (28 Aug 2026) A$0.45 FULLY FUNDED AND DE -RISKED TO STEADY STATE Market capitalisation
Slide 6: Australian Capital Unlocking a Mispriced South African Gold Asset
THE OPPORTUNITY Australian Capital Unlocking a Mispriced South African Gold Asset West Wits has used Australian capital markets to develop a high-grade For personal use only Witwatersrand asset that was overlooked by the local market. A Mispriced Asset The Right Capital Market A shallow, high-grade
Slide 7: The Witwatersrand Basin
A STRATEGIC POSITION IN THE WORLD’S MOST PROLIFIC GOLD BASIN The Witwatersrand Basin West Wits sits in the Central Rand, with established For personal use only infrastructure, adjacent operations & access to both brownfield & greenfield development potential. ~22% ofbasin all gold ever mined has com
Slide 8: A 7.24Moz Base Supports Production & Growth
THE PRODUCING ASSET 384 koz A 7.24Moz2 base Supports Production & Growth Maiden Ore Reserve @ 2.60 g/t1 For personal use only 1.03 Moz WBP GLOBAL JORC MRE 2 — INCLUSIVE OF ORE RESERVES Qala Shallows mining inventory @ 3.0 g/t1 Grade (g/t Ounces Category Tonnes (Mt) Au) (Moz) Measured 14.08 4.40 1.99
Slide 9: From First Gold to Steady State and a Blueprint for Growth
THE ROADMAP From First Gold to Steady State and a Blueprint for Growth Production is underway, with a funded ramp up to a 70koz p.a. steady state1. The Project 200 scoping study set out a blueprint for growth towards 200,000oz p.a. production rate with separate uranium upside at BRC Project within M
Slide 10: Qala Shallows - High margins, strong returns at conservative gold assumptions
THE FINANCIAL CASE Qala Shallows - High margins, strong returns at conservative gold assumptions DFS1 economics based on US$2,850/oz gold price assumption, well below current spot, highlighting strong operating leverage & downside resilience. For personal use only US$2.7bn US$983M US$500M 81% LIFE-O
Slide 11: Qala Shallows - Life of Mine
QALA SHALLOWS – LIFE OF MINE 17-year production profile with a ~70koz p.a. steady-state plateau1 For personal use only 1000 90000 900 80000 944 koz Recovered gold over mine life 800 70000 700 Recovered gold (oz) 60000 ROM tonnes (kt) 600 50000 ~10yrs 500 of sustained ~70koz p.a. production 40000 400
Slide 12: Operational Ramp-Up is well underway
THE PRODUCING ASSET Operational Ramp-Up is well underway June 2026 quarter - underground development, surface infrastructure & workforce expansion progressing toward steady-state production. For personal use only 544 m UG development to 30 Jun (375 m on-reef) 45% Surface infrastructure complete ~1 y
Slide 13: Scoping Study: a blueprint for growth
PROJECT 200 & BIRD REEF CENTRAL Scoping Study: a blueprint for growth The Project 200 scoping study is a conceptual blueprint showing how production could scale towards 200,000oz p.a. production rate from the existing 7.24Moz Au Mineral Resource2 base, with uranium-gold upside at Bird Reef Central.
Slide 14: ESG in action - jobs, safety & local enterprise
RESPONSIBLE MINING ESG in action - jobs, safety & local enterprise 450+ workers on site For personal use only Local enterprise Supporting local SMMEs & community vendors across catering, logistics & site services. Skills & employment Learnerships & local hiring are building workforce capability & su
Slide 15: Experienced team to deliver the ramp-up and growth plan
THE TEAM Experienced team to deliver the ramp-up and growth plan BOARD For personal use only Michael Quinert Rudi Deysel Simon Whyte Chairman (AUS) CEO / MD (SA) CFO / Co. Secretary (AUS) ASX-experienced commercial lawyer advising Mining engineer (MBA); underground, open-cast & Chartered Accountant;
Slide 16: Investor Relations
ASX : WWI INVESTOR RELATIONS For personal use only Building South Africa's ir@westwitsmining.com · westwitsmining.com next gold producer. SOUTH AFRICA Unit 8A, Sifon Industrial Park, 279 Sifon Street, Robertville, Roodepoort 1709 AUSTRALIA Level 6, 400 Collins Street, Melbourne VIC 3000 ASX:WWI | We
Slide 17: Appendix
For personal use only Appendix Ore Reserve & Mineral Resource statements · References ASX:WWI | West Wits Mining | September 2026
Slide 18: Ore Reserve & Mineral Resource
APPENDIX 1 Ore Reserve & Mineral Resource Qala Shallows Ore Reserve (JORC 2012)1 For personal use only Category Tonnes (Mt) Grade (g/t) Content (oz) NOTES Proved 1.10 2.79 99,205 Global MRE reported per the JORC Code (2012), inclusive Probable 3.49 2.54 284,730 of Ore Reserves. Total 4.60 2.60 383,9
Slide 19: References
APPENDIX 2 References 1. The original report was “Updates to Qala Shallows DFS provide improved results for Witwatersrand Basin Project” which was issued with consent of the Competent Person, Mr. Andrew Pooley. The report was released to the ASX on 27 July 2023 and can be found on the Company’s webs