Aeris Resources Limited · ASX:AIS
Aeris Resources — Bell Potter Unearthed Conference 2024
20 slides from Aeris Resources's conference presentation, Feb 13, 2024
Slide 1: Bell Potter Unearthed conference
Bell Potter Unearthed conference February 2024 Presented by: Andre Labuschagne
Slide 2: Disclaimer
Disclaimer This investor presentation has been prepared by Aeris Resources Limited However, investors should note that the non-IFRS financial information DISCLAIMER (“Aeris” or the “Company”). By attending an investor presentation or and non-GAAP financial measures do not have standardised meanings
Slide 3: Aeris Resources
Aeris Resources Australian mid-tier, base and precious metals Weighted to copper2 producer 29 30 79 47 Cu Zn Au Ag Copper Zinc Gold Silver 28 – 35 kt 1.2 – 1.5 kt 48 - 60 koz 181 - 227 koz 3 producing operations + 1 care & maintenance 1 long life development project All sites prospective for further
Slide 4: Mining Portfolio: large Mineral Resource inventory
Mining Portfolio: large Mineral Resource inventory Production Assets Development Projects Asset Tritton Cracow North Queensland Jaguar Stockman ~850,000t copper metal, ~1,000,000t zinc metal, ~1,400,000oz gold Ownership 100% 100% 100% 100% 100% Primary Copper / Gold Gold Copper / Gold Copper / Zinc
Slide 5: Diversified production from three assets
Diversified production from three assets Tritton Cracow North Queensland Copper production (kt) Gold production (koz) Copper production (kt) 25 24 Aeris Aeris 23 acquisition acquisition 88 Copper production (kt) 19 17 74 19 54 48 48 10 38 7 8 FY20 FY21 FY22 FY23 FY24 FY20 FY21 FY22 FY23 FY24 FY20 FY
Slide 6: Production assets: Tritton
Production assets Tritton New South Wales
Slide 7: Tritton
Tritton Our cornerstone asset 100% owned, high-grade underground copper mines located in central NSW 430kt copper produced since operations began in 2005 2,330km2 prospective tenement package Mineral Resource1 of 24.8Mt at 1.5% Cu, 0.3g/t Au Ore Reserve1 of 4.0Mt at 1.4% Cu, 0.2g/t Au Targeting prod
Slide 8: Tritton: A long life copper operation now producing from multiple deposits
Tritton A long life copper operation now producing from multiple deposits Production Development Ready Study Phase Exploration Tritton Murrawombie Pit Constellation Kurrajong • Mature mine at depth, • Cut back of old pit, • Potential future baseload mill feed • High grade deposit • Targeting high-gr
Slide 9: Constellation deposit
Constellation deposit Potential future baseload feed for Tritton mill Located 45km northeast of the Tritton plant Mineral Resource1 of 6.7Mt at 1.85% Cu and 0.58g/t Au Recently completed drill program, including high-grade intercept TAKD095: 26m @ 3.81% Cu, 1.12g/t Au, 10.3g/t Ag2 Extended mineralis
Slide 10: Cracow
> ° ) o O xe} < Ae) a c 0) 0) > ie}
Slide 11: Cracow
Cracow Mature, high-grade gold mine Low-sulphidation epithermal underground gold mine located 500km northwest of Brisbane Conventional crush and grind CIP processing plant Produced +1.5Moz gold since first production in 2004 History of production and resource replacement FY24 production guidance of
Slide 12: Golden Plateau
Golden Plateau Potential new mining area at Cracow Historic mining area with potential for future underground operation close to the mill 62koz Au Mineral Resource1 defined in FY23 Significant potential to add additional Mineral Resources with further drilling Developing exploration decline to impro
Slide 13: Southern Vein Field
Southern Vein Field Could be the game-changer for Cracow Approx. 2.5Moz gold produced to date from the WVF and 850koz gold from Golden Plateau Structures with the potential to host WVF style ore shoots interpreted under cover in the Southern Vein Field Southern Vein Field has had very limited explor
Slide 14: Mt Colin
Mt Colin North Queensland
Slide 15: North Queensland
North Queensland Harvesting cash from Mt Colin mine to fund group capital developments Mt Colin copper-gold mine due to finish mining operations in Q4 FY24 Toll processing through Ernest Henry mill to extend in Q1 FY25 Working capital managed with monthly, partial payment of ore stockpiles Large ten
Slide 16: Barbara project
Barbara project Potential follow-on operation to Mt Colin Updated resource of 2.2Mt at 2.0% Cu and 0.2g/t Au1 completed Resource remains open down-plunge Feasibility studies to be undertaken in FY24 on a potential underground operation Toll treatment options with regional mills reduces capital and s
Slide 17: Development projects
Development projects
Slide 18: Jaguar
Jaguar Brownfield copper/zinc restart opportunity Mineral Resource1 8Mt @ 1.1% Cu, 5.6% Zn, 1.3g/t Au and 215g/t Ag across 4 deposits: ̶ Bentley ̶ Jaguar ̶ Triumph ̶ Teutonic Bore Transitioned to care and maintenance in Q1 FY24 Progressing feasibility study on restart options including increasing or
Slide 19: Stockman
Stockman Long life, Cu-Zn-Au-Ag project with all primary permits Feasibility Study (FS) well advanced 12 year mine plan producing at up to 850ktpa1 from a single deposit (Currawong) Potential to extend mine life with other known deposits Leaching technology being investigated to improve recoveries i
Slide 20: Investment highlights
Investment highlights Company set for growth Diversified production from 3 operations Significant internal growth opportunities to lift production and extend mine lives All sites located in tier 1 mining jurisdiction Strong exposure to copper, critical to electrification Strengthened balance sheet w
Aeris Resources — Bell Potter Unearthed Conference 2024 on 6ix