Ads-tec Energy Plc · NASDAQ:ADSE
Ads-tec Energy — Investor Presentation (January 2022)
18 slides from Ads-tec Energy's investor presentation, January 2022
Slide 1: ADS-TEC Energy: Power … Everywhere
ADS-TEC Energy Power … Everywhere Our mission is to deliver distributed, high-capacity power for the All-Electric World
Slide 2: Disclaimer
Disclaimer Cautionary Language Regarding Forward-Looking Statements This presentation includes “forward-looking statements” within the meaning of the “safe harbor” provisions of the U.S. Private Securities Litigation Reform Act of 1995. Forward- looking statements may be identified by the use of wor
Slide 3: ADS-TEC Energy Core Capabilities
ADS-TEC 14 Energy Core Capabilities Years of Developing Advanced Energy Storage, Power Conversion, Digital Control Systems, Software Platforms Announcement of IPO Development of first Introduction of SRB Bosch acquires 39% through business First containerized 320 kW battery assisted own Li-Ion BMS a
Slide 4: Energy Storage and Control Systems for Commercial and Residential Applications
Energy Storage and Control Systems for Commercial and Residential Applications ADS-TEC Energy Microgrid in Lithuania; managing mixed input feed while Battery- Isolated Off-Grid Power Plant; managing very large-scale mixed feed Buffering System provides 150KWhr. while Battery Buffering System provide
Slide 5: Leading DC Energy: Battery-Buffered Ultra Fast Charging for Porsche
ADS-TEC Leading DCEnergy battery-buffered Ultra Fast Charging for Porsche Meeting The Challenging Requirements of the New Porsche Taycan even at power limited grids 3 Years of Joint Development Efficient Ultra Fast Charging without Dependency from High-Power Grids Delivering up to 320KW even on powe
Slide 6: The Need for Energy
ADS-TEC The Need forEnergy Power: The Need for Speed 2022 © by ads-tec Energy GmbH
Slide 7: High Power is Only Available in Limited Areas
High Power is Only Availability in Limited Areas ADS-TEC Energy Advanced Battery Buffering Allows for The Added Power Needed at the end of the line 2022 © by ads-tec Energy GmbH
Slide 8: ChargeBox Boosts Lower Power Availability to Useful Fast Charging Power
ADS-TEC Energy ChargeBox Boosts Lower Power Availability to Useful Fast Charging Power From 110 kW Input of 480 V grid AC Up to 320kW Output and 920V DC LOW POWER INPUT-50KW up to 110KW HIGH POWER OUTPUT – even up to 270KW output with 50KW input 2022 © by ads-tec Energy GmbH
Slide 9: Input / Output Capacity of the Charging Infrastructure
Input / Output Capacity of the Charging Infrastructure Competiton without battery-buffer 2 x ~ 150kW or 1 x ~ 300KW 300kW Grid ADS-TEC –Battery-Buffered ChargeBox 2 x ~ 140 kW or 1 x ~ 270KW 50kW Grid 2 x ~ 160 kW or 1 x ~ 320KW 110kW Grid
Slide 10: Benefits of ADS-TEC Battery-Buffered Technology
ADS-TEC Benefits ofEnergy ADS-TEC Battery-Buffered Technology vs Grid Upgrade and Common DC Chargers Lower Cost than Grid Upgrade Far Faster Installations, From Months to Weeks 30% Lower Total Cost of Ownership & Faster ROI Eliminate Peak Demand Charges Increased and Flexibility Reliability Independ
Slide 11: ChargeBox: Lower Installed Cost vs Standard DC Chargers with Grid Upgrade
ChargeBox: Lower Installed Cost vs Standard DC Chargers with Grid Upgrade Reduced Construction Costs, Elimination of Switchgear Upgrades drives lower installed Cost with reduced Construction and permitting Time ADS-tec ChargeBox Non–battery based DC fast charger (2 x 140KW) (2) DC fast charger (2 x
Slide 12: ChargeBox: Minimal Peak Demand Charges vs Standard DC Chargers
ChargeBox: Minimal Peak Demand Charges vs Standard DC Chargers ADS-TEC’s Battery-buffered charging solution cuts peak demand charges Peak Demand charge $/kw/month Peak Demand charge $ per year Non–battery based Non–battery based ADSE ChargeBox (at 50KW) ADSE ChargeBox (at 50KW) Utility Location DC f
Slide 13: ChargeBox: ~30% Lower Total Cost of Ownership
ChargeBox: ~30% Lower Total Cost of Ownership Taking into consideration both installation cost and peak demand charges, ADS-TEC’s ChargeBox shows a tremendous advantage in Total Cost of Ownership Non–battery based ADS-TEC ChargeBox DC ultra-fast charger CAPEX $ 315,845 $ 257,672 Installation cost $
Slide 14: Route to Market: Vertical Market Segments
ADS-TEC Energy Route to Market: Supply All Charging Network Operators, Uniquely Benefit Vertical Market Segments Vertical Market Segments 2022 © by ads-tec Energy GmbH
Slide 15: World Class ADS-TEC Manufacturing Facilities
World ClassEnergy ADS-TEC Manufacturing Facilities Production plants near Dresden / Germany • Since 2009 production plant with 4,500 square meter • New production facility since 2020 (45,000 sq ft) • In the immediate vicinity of the other ADS-TEC • Production for Industrial IT, Energy and EV Chargin
Slide 16: ChargeBox Urban Sample Installations
ADS-TEC Energy ChargeBox Urban Sample Installations Spain: Retailer Germany: Berlin: German Ministry of Environment Installed at a Gas station downtown 2022 © by ads-tec Energy GmbH
Slide 17: Global Senior Leadership: With Industry Specific Expertise
Global Senior Leadership: With Industry Specific Expertise Thomas Speidel Robert Vogt John Neville Thorsten Ochs Hakan Konyar Chief Executive Officer Chief Financial Officer Chief Sales Officer Chief Technology Officer Chief Production Officer & Founder ADS-TEC Energy GmbH 25+ yrs experience 14 yrs
Slide 18: Slide 18
ADS-TEC Energy — Investor Presentation (January 2022) on 6ix