Terramin Australia Limited · ASX:TZN

Terramin Australia — Corporate Update (January 2018)

29 slides from Terramin Australia's corporate update, Jan 29, 2018

  1. Slide 1: Bird in Hand Gold Project - Update

    Slide 1: Bird in Hand Gold Project - Update

    Bird in Hand Gold Project - Update  Draft Mining Lease Proposal provided to the Government on 20th December 2017  Checks against Mining Act, and regulatory requirements (Ministerial Determination)  Discussions continue on aspects of the project with CCC, landholders, local community and governmen

  2. Slide 2: Bird in Hand Gold Project - Update

    Slide 2: Bird in Hand Gold Project - Update

    Bird in Hand Gold Project - Update  Managed Aquifer Recharge trial  Discussion with Department of Environment, Water and Natural Resources (DEWNR) and Department of the Premier and Cabinet (Minerals) – awaiting feedback  2 - 4 reinjection wells and paired monitoring piezometers proposed  No feed

  3. Slide 3: Bird in Hand Gold Project - Update

    Slide 3: Bird in Hand Gold Project - Update

    Bird in Hand Gold Project - Update  EPBC Act Referral – Caladenia rigida  Optional – Company chose to refer Project  Meeting in Canberra last year advised potentially not necessary based on outline of Project  Lodged in October 2017 to ensure managing potential impacts appropriately  Can be dow

  4. Slide 4: Bird in Hand Gold Project - Update

    Slide 4: Bird in Hand Gold Project - Update

    Bird in Hand Gold Project - Update  Corporate Reorganisation  Announced to ASX on 11th January 2018  CEO to transform into executive management of Australian projects and exploration activities  Overall responsibility for Terramin’s corporate and finance functions  More resources for Bird in Ha

  5. Slide 5: Noise – Examples of Noise Abatement Angas Zinc Mine

    Slide 5: Noise – Examples of Noise Abatement Angas Zinc Mine

    Noise – Examples of Noise Abatement Angas Zinc Mine  Angas Zinc Mine – Underground and processing – Strathalbyn  Landscape bunding / noise shielding  Infrastructure placed below ground level  Ventilation fan underground  Activities limited during night – no road trucking or crushing between 10p

  6. Slide 6: Noise – Examples of Noise Abatement Angas Zinc Mine

    Slide 6: Noise – Examples of Noise Abatement Angas Zinc Mine

    Noise – Examples of Noise Abatement Angas Zinc Mine TERRAMIN AUSTRALIA LIMITED SLIDE No. 6

  7. Slide 7: Noise – Examples of Noise Abatement Waihi Gold Mine NZ

    Slide 7: Noise – Examples of Noise Abatement Waihi Gold Mine NZ

    Noise – Examples of Noise Abatement Waihi Gold Mine NZ  Waihi Gold Mine – New Zealand (open cut, underground + processing) – NZ TERRAMIN AUSTRALIA LIMITED SLIDE No. 7

  8. Slide 8: Noise – Examples of Noise Abatement Waihi Gold Mine NZ

    Slide 8: Noise – Examples of Noise Abatement Waihi Gold Mine NZ

    Noise – Examples of Noise Abatement Waihi Gold Mine NZ  Waihi Gold Mine  Town of approx. 5000 – horticulture and dairy farming region  2004: Underground commenced – 37km of drives, 360m deep  Employs 400  Includes ore brought to surface, crushed, 2.7km conveyor, and processing plant  Construct

  9. Slide 9: Blasting and Vibration

    Slide 9: Blasting and Vibration

    TERRAMIN AUSTRALIA LIMITED Blasting and Vibration

  10. Slide 10: 2q TERRAMIN AUSTRALIA LIMITED SLIDE No. 10

    Slide 10: 2q TERRAMIN AUSTRALIA LIMITED SLIDE No. 10

    2q TERRAMIN AUSTRALIA LIMITED SLIDE No. 10

  11. Slide 11: Project Cycle

    Slide 11: Project Cycle

    Project Cycle  After grouting cycle  Drill  Blast/Charge  Remove “bog/muck”  Insert ground support  Map geology  Check groundwater  Backfill TERRAMIN AUSTRALIA LIMITED SLIDE No. 11

  12. Slide 12: Explosive pattern

    Slide 12: Explosive pattern

    Explosive pattern  Twin boom drills on articulated carrier – Jumbo  ~60 holes per face  2.5m – 3.5m depth  45mm diameter  Twice over 24 hours  less than 30 seconds/day TERRAMIN AUSTRALIA LIMITED SLIDE No. 12

  13. Slide 13: Explosive pattern

    Slide 13: Explosive pattern

    Explosive pattern  Twin boom drills on articulated carrier – Jumbo  ~60 holes per face  2.5m – 3.5m depth  45mm diameter  Twice over 24 hours  Total blasting  less than 30 seconds/day TERRAMIN AUSTRALIA LIMITED SLIDE No. 13

  14. Slide 14: Vibration and Air overpressure

    Slide 14: Vibration and Air overpressure

    Vibration and Air overpressure When explosives detonate in rock, most of the energy is used in breaking and displacing the rockmass. However, some of energy is released in the form of ground vibration and air-overpressure. A soundwave from blasting is generated below the threshold of human hearin

  15. Slide 15: Proposed Project Outcome

    Slide 15: Proposed Project Outcome

    Proposed Project Outcome No public nuisance impacts from air- overpressure and vibration caused by blasting Proposal addition: “from the mining operation”. TERRAMIN AUSTRALIA LIMITED SLIDE No. 15

  16. Slide 16: Blasting Mitigation

    Slide 16: Blasting Mitigation

    Blasting Mitigation Ground Vibration Air Overpressure Process of charging • Explosive quantity • Explosive quantity • Explosive type • Explosive type • Initiation timing • Degree of Confinement • Burden to free face – Rock and space between – Uncharged drillhole length explosive drillholes • Number

  17. Slide 17: Vibration - Context

    Slide 17: Vibration - Context

    Vibration - Context Terramin commitment AS 2670.2–1990 TERRAMIN AUSTRALIA LIMITED SLIDE No. 17

  18. Slide 18: Air Overpressure

    Slide 18: Air Overpressure

    Air Overpressure  Background air-overpressure is currently peaking over 110-120 dBL  Data collected remotely by Saros (independent expert consultants in 140.00 blasting) 731 instances above 115 dBL = 0.58% 130.00 212 instances above 120 dBL = 0.17% 120.00 dBL 110.00 100.00 90.00 80.00 22/09/2017 2

  19. Slide 19: Compliance Requirements

    Slide 19: Compliance Requirements

    Compliance Requirements Australian blasting compliance limits AS 2670.2–1990 are amongst the most stringent in the world. Both ground vibration and air overpressure limits are based on human comfort criteria Terramin commits to:  Ground Vibration – Not to exceed 5mm/second for 95% of occasions, wit

  20. Slide 20: Underground Development

    Slide 20: Underground Development

    Underground Development 0.5 1 2 10 5 TERRAMIN AUSTRALIA LIMITED SLIDE No. 20

  21. Slide 21: TERRAMIN AUSTRALIA LIMITED SLIDE No. 21

    Slide 21: TERRAMIN AUSTRALIA LIMITED SLIDE No. 21

    0.5 2 1 TERRAMIN AUSTRALIA LIMITED SLIDE No. 21

  22. Slide 22: TERRAMIN AUSTRALIA LIMITED SLIDE No. 22

    Slide 22: TERRAMIN AUSTRALIA LIMITED SLIDE No. 22

    0.5 1 TERRAMIN AUSTRALIA LIMITED SLIDE No. 22

  23. Slide 23: TERRAMIN AUSTRALIA LIMITED SLIDE No. 23

    Slide 23: TERRAMIN AUSTRALIA LIMITED SLIDE No. 23

    0.5 TERRAMIN AUSTRALIA LIMITED SLIDE No. 23

  24. Slide 24: TERRAMIN AUSTRALIA LIMITED SLIDE No. 24

    Slide 24: TERRAMIN AUSTRALIA LIMITED SLIDE No. 24

    0.5 TERRAMIN AUSTRALIA LIMITED SLIDE No. 24

  25. Slide 25: TERRAMIN AUSTRALIA LIMITED SLIDE No. 25

    Slide 25: TERRAMIN AUSTRALIA LIMITED SLIDE No. 25

    0.5 TERRAMIN AUSTRALIA LIMITED SLIDE No. 25

  26. Slide 26: Managed Aquifer Recharge - Update

    Slide 26: Managed Aquifer Recharge - Update

    Managed Aquifer Recharge - Update  Met with DEWNR (Water Dept.) and DPC (Mining Dept.) in December  Waiting on feedback as to what testwork would be suitable to meet expectations  Trial will inform final design of Managed Aquifer Recharge network for operations  Trial will be between 2 and 4 rei

  27. Slide 27: Reinjection and Water Treatment Process

    Slide 27: Reinjection and Water Treatment Process

    Reinjection and Water Treatment Process TERRAMIN AUSTRALIA LIMITED SLIDE No. 27

  28. Slide 28: Reinjection and Water Treatment Process

    Slide 28: Reinjection and Water Treatment Process

    Reinjection and Water Treatment Process TERRAMIN AUSTRALIA LIMITED SLIDE No. 28

  29. Slide 29: Credible Worst Case Scenario Inflows

    Slide 29: Credible Worst Case Scenario Inflows

    Credible Worst Case Scenario Inflows How was it built?  Using the credible worst case scenario of a 70% effective grouting regime  A maximum peak inflow of 24l/s  The underground dewatering system has been designed on this plus an additional 14l/s.  The additional 14l/s came from doubling of aqu