Arrow Minerals Limited · ASX:AMD

Arrow Minerals — Investor Presentation (March 2024)

18 slides from Arrow Minerals's investor presentation, Mar 6, 2024

  1. Slide 1: ASX Announcement: Corporate Presentation

    ASX Announcement 13 December 2023 6 March 2024 Corporate Presentation Arrow Minerals Limited (ASX: AMD) (Arrow or the Company) advises that it has released an updated Corporate Presentation. Managing Director David Flanagan will deliver this presentation at this week's Resources Rising Stars investo

  2. Slide 2: Simandou North Iron Project Company Update March 2024

    SIMANDOU NORTH IRON PROJECT Company Update March 2024 For personal use only This is an image of the Conakry Port in Guinea is operated by Page 1 Albayrak Group under 25 year lease from the Conakry Ports SA.

  3. Slide 3: Key Messages

    Key Messages • The Arrow project is along strike and adjoins the giant Simandou iron ore project under development by Winning3/Simfer(RIO/Chalco). 1 • At 4.6bt at 65% Fe, Simandou is the worlds largest1,3 undeveloped high grade iron ore project. High-grade, low-impurity iron ores For personal use on

  4. Slide 4: Board and Management on Completion

    Board and Management on Completion CORPORATE OVERVIEW Jeff Dowling NON-EXECUTIVE CHAIRMAN More than 45 years experience across David Flanagan BSc (Mining and Mineral Exploration WASM), FAICD MANAGING DIRECTOR Assuming Completion of Recapitalisation professional services with Ernst and Young and vari

  5. Slide 5: Simandou - the world's largest undeveloped high grade iron ore project

    “Simandou - the world’s largest undeveloped high grade iron ore project” For personal use only 1. Performance rights subject to performance hurdles: Page 4

  6. Slide 6: Infrastructure – Substantial port, stockyard, project cargo

    Infrastructure – Substantial port, stockyard, project cargo For personal use only Image Sourced via google earth 24th February 2024: Page 5

  7. Slide 7: Infrastructure – ore handling, rail loop and yards

    Infrastructure – ore handling, rail loop and yards For personal use only Image Sourced via google earth 24th February 2024: Page 6

  8. Slide 8: Infrastructure – Rail bridge construction ongoing

    Infrastructure – Rail bridge construction ongoing For personal use only Image Sourced via google earth 24th February 2024: Page 7

  9. Slide 9: Simandou North – Amazing neighbours

    Simandou North – “Amazing neighbours” • The Arrow Minerals Project tenure boundary is only 15 km along strike from WCS resource 1.8Bt at 65% Fe.2 For personal use only • Further south along strike, the Rio Tinto Simfer JV hosting a further 2.8Bt at 65% Fe.1 • At 4.6Bt at 65% Fe, Simandou (Simfer plu

  10. Slide 10: Drilling Starts Feb – Results from June

    Drilling Starts Feb – Results from June • The Arrow Minerals Project is host to approximately 40km of the prospective iron For personal use only formation. • The Arrow Minerals Project tenure boundary is only 15 km along strike from WCS resource 1.8Bt at 65% Fe.1 • The company has mapped and chip sa

  11. Slide 11: Previous Exploration Field Season 2023

    Previous Exploration Field Season 2023 For personal use only • Arrow has mapped and chip sampled several areas of enriched BIF within the prospective rock sequence. • Arrow intercepted high grade iron (DALDDH003, 12 metres at 60.1% Fe) in scout drilling program of 16 holes completed in 20231. • 2 ri

  12. Slide 12: A pipeline of high quality targets just waiting to be drilled

    A pipeline of high quality targets just waiting to be drilled For personal use only • The company has mapped and chip sampled extensive areas of enriched BIF within the prospective rock sequence • Limited work has mainly focused on the South East corner of the project. It is highly significant to ha

  13. Slide 13: Investment Summary

    INVESTMENT SUMMARY For personal use only We have the rocks. Arrow has mapped the geology and delivered high grade drilling intercepts, along strike, joining the worlds largest high grade iron ore system 1,2,3 Port and rail is normally the barrier. We will leverage major investment of $27Bn in multi-

  14. Slide 14: Building a Better Future for Our Communities

    BUILDING A BETTER FUTURE FOR OUR COMMUNITIES DEEPLY COMMITTED TO SUPPORTING THE LOCAL COMMUNITY AND RESPECTING THE ENVIORNMENT For personal use only ENVIRONMENT • Respect our environment and maintain highest standards • On-going rehabilitation throughout life of project SOCIAL • Create long term dir

  15. Slide 15: Appendix

    For personal use only Appendix Page Page 14 14

  16. Slide 16: Building a Greener World

    BUILDING A GREENER WORLD STEEL CRUCIAL IN THE TRANSITION TO NET–ZERO AMBITIONS AND THE DECARBONISATION CHALLENGE For personal use only • Electrification of the global economy is essential to reduce carbon emissions and alternative power sources to fossil fuel powerplants required • Any transition to

  17. Slide 17: Disclaimer

    DISCLAIMER This presentation has been prepared by Arrow Minerals Limited (Arrow or the Company). It contains general information about the Company’s activities current as at the date of the presentation. The information is provided in summary form and does not purport to be complete. This presentati

  18. Slide 18: Arrow Minerals Limited Contact

    ARROW MINERALS LIMITED For personal use only ASX : AMD CONTACT ADDRESS Email: info@arrowminerals.com.au Suite 5, 63 Hay Street Website: arrowminerals.com.au Subiaco WA 6008 Media Enquiries: FOLLOW US ON SOCIAL MEDIA Paul@readcorporate.com.au www.linkedin.com/company/arrow-minerals-limited twitter.co

Arrow Minerals — Investor Presentation (March 2024) on 6ix