Arrow Minerals Limited · ASX:AMD

Arrow Minerals — Resources Rising Stars September 2026

23 slides from Arrow Minerals's conference presentation, Sep 9, 2026

  1. Slide 1: Bulking Up in the Lands of Giants

    BULKING UP IN THE LANDS OF GIANTS For personal use only Resources Rising Stars September 2026 ASX: AMD

  2. Slide 2: Disclaimer

    Disclaimer This presentation has been prepared by Arrow Minerals Limited (“Arrow” or the “Company”). It contains general information about the The information in this announcement relating to the Company’s previous exploration, Exploration Targets, and Mineral Resources are Company’s activities curr

  3. Slide 3: Presentation Summary

    Presentation Summary ►Yarraloola Copper-Gold – Pilbara WA For personal use only ►Yarraloola Iron Ore – Pilbara WA ►Niagara Bauxite Project – Guinea Simandou Corridor ►Next Steps ARROW MINERALS ASX: AMD | 3

  4. Slide 4: Arrow Corporate Snapshot

    Arrow Corporate Snapshot Capital Structure Board of Directors Major shareholders Non-Executive Board & Management 6% For personal use only Share Price 1.5cps Jeff Dowling Chairman Top 20 shareholders 45% Shares on issue 1.7Bn David Flanagan Managing Director Market capitalisation $27m Non-Executive

  5. Slide 5: Yarraloola Copper-Gold Project – Highlights

    Yarraloola Copper-Gold Project – Highlights ►Copper – WMC confirmed copper mineralisation in drilling adjacent to historical copper mine in the 1970’s and suggested it may be a VMS1 system. Did not For personal use only assay drilling for gold ►Gold1 – Rock chip samples by Newexco up to 0.95 g/t gol

  6. Slide 6: Yarraloola Copper-Gold

    Yarraloola Copper-Gold ► Yarraloola Target1- Yarraloola Copper Mine, a priority drill target, first discovered in 1907 by Mr Thomas, a local kangaroo shooter. For personal use only ► Ava Target1 - Newexco principals have substantial experience in the discovery of base metals deposits. Newexco recogn

  7. Slide 7: Yarraloola Iron Ore Project - Highlights

    Yarraloola Iron Ore Project - Highlights ► Acquisition1,2 of 70% stake in E08/3668 iron ore project with DSO grade rock chip samples at surface next to the eastern boundary of Arrow’s Yarraloola copper project For personal use only ► Target area shares tenement boundaries with permits associated wit

  8. Slide 8: Yarraloola Iron Ore Project

    For personal use only Yarraloola Iron Ore Project ►Work Programme ► Validation and integration of all historical data for ongoing target development ► Heritage clearance and detailed mapping and sampling of outcropping drill targets ► Complete gravity surveys over potentially soil covered CID deposi

  9. Slide 9: Guinea – Large Mineral Endowment

    Guinea – Large Mineral Endowment ►The Simandou Railway and Morebaya port are now in operation and ramping up. For personal use only ►Target combined exports from Rio, Baosteel, Winning, Chinalco in first year is 15 to 20Mt. ►At full ramp up target is 160Mtpa. Total rail capacity anticipated to be >4

  10. Slide 10: Niagara Bauxite Project, Guinea - A World Class Bauxite Opportunity

    Niagara Bauxite Project, Guinea - A World Class Bauxite Opportunity ► The Niagara Bauxite Project1,2 is a world class asset ~100km from multi-user rail (TGR) ► The Exploration Permit for Niagara has been re-issued by the Guinea Government for a term of 3 years, renewable for two 2-year terms. For pe

  11. Slide 11: The Opportunity

    The Opportunity ► Niagara Bauxite Project is a world class asset ~100km from the Simandou multi-user rail (the TGR) ► Recently granted new Exploration Permit1, 3 year term For personal use only ► Development strategy – to rapidly progress towards a DSO ‘starter mine’ to reduce capital, shorten proje

  12. Slide 12: Guinea – MOU Agreement with Soguipami

    Guinea – MOU Agreement with Soguipami, 100% Guinea Government owned entity For personal use only ► Soguipami is the holder of equity in many projects in Guinea that have attracted development investment. They include; ► The Simandou Iron ore project operated by Rio Tinto/Chinalco/Baosteel/Winning al

  13. Slide 13: Presentation Summary and Next Steps

    Presentation Summary and Next Steps ►Yarraloola Copper-Gold – Pilbara WA ► WMC drilling targeted valid geophysical signature and historical mine. Gold at surface but not assayed in drilling. The company will target copper and silver rich zones down hole with the potential to host gold For personal u

  14. Slide 14: Appendix

    For personal use only Appendix

  15. Slide 15: Yarraloola Project – Close to World Class Export Infrastructure

    For personal use only Yarraloola Project – Close to World Class Export Infrastructure Yarraloola Project Location shown with bulk commodity rail and port infrastructure, and locations of GSWA MINEDEX 1 catalogued mineral deposits and occurrences for gold and copper. Coordinate system: MGA2020 Zone 5

  16. Slide 16: Building a better future for our communities

    Building a better future for our communities For personal use only Deeply committed to supporting the local community and respecting the environment Environment ► Respect our environment and maintain high standards ► On-going rehabilitation throughout life of project Social ► Create long term jobs,

  17. Slide 17: Niagara – Bauxite Resource Summary

    Niagara – Bauxite Resource Summary1 ► Table 1. Niagara Mineral Resource Statement (Inclusive of subsets given in Table 2 and Table 3) For personal use only Cutoff Criteria Mineral Resource Category Tonnes (Mt) Al2O3 (%) SiO2 (%) 34% Al2O3 Indicated 142.0 42.3 2.6 <10% SiO2 Inferred 42.6 42.2 3.0 >1m

  18. Slide 18: Niagara Bauxite Project – sections showing Al2O3 grade continuity

    Niagara Bauxite Project –sections showing Al2O3 grade continuity1, 2 For personal use only 1. Refer to ASX Announcement dated 13 January 2025 titled “Niagara resource estimation underway following receipt of final assays” ARROW MINERALS ASX: AMD | 18 2. Refer to ASX Announcement dated 25 March 2025

  19. Slide 19: Niagara Bauxite Project – sections showing Al2O3 grade continuity

    For personal use only Niagara Bauxite Project –sections showing Al2O3 grade continuity1, 2 1. Refer to ASX Announcement dated 13 January 2025 titled “Niagara resource estimation underway following receipt of final assays” ARROW MINERALS ASX: AMD | 19 2. Refer to ASX Announcement dated 25 March 2025

  20. Slide 20: Niagara Bauxite Project – Mineral Resource Classification and Bauxite Thickness

    Niagara Bauxite Project – Mineral Resource Classification and Bauxite Thickness For personal use only These figures show Mineral Resources and Exploration Targets based on historic data on the same illustrations to demonstrate potential continuity of mineralisation associated with plateau systems. D

  21. Slide 21: Why Guinea? - majors, major investments & multi-user infrastructure

    Why Guinea? - majors, major investments & multi-user infrastructure, mineral endowment Company Operation Description For personal use only Rio Tinto Global Major, Tier 1, iron ore, bauxite, alumina, aluminium, copper, 22.5% shareholder in CBG, operating the Sangaredi Bauxite mine. CBG is a third par

  22. Slide 22: Multiple Bulk Commodity Export Ports linked by Road & Rail

    Multiple BULK Commodity Export Ports linked by Road & Rail 1. Morebaya Port – due end of 2025 For personal use only 2. Conakry Port - operating 3. Boffa Port - operating 4. Konta Port - operating Conakry Port ARROW MINERALS ASX: AMD | 22 Arrow Minerals Ltd (ASX: AMD)

  23. Slide 23: Conakry, Boffa, Konta and Morebaya Ports

    CONAKRY PORT BOFFA PORT For personal use only KONTA PORT MOREBAYA PORT These images were captured from Google Earth. Arrow Minerals (ASX:AMD) is not the owner of any port, shipping or rail infrastructure depicted or described in this document ARROW MINERALS ASX: AMD | 23 Arrow Minerals Ltd (ASX: AMD

Arrow Minerals — Resources Rising Stars September 2026 on 6ix