  1. Slide 1: Bulking Up

    Slide 1: Bulking Up

    BULKING UP Focused on the fastest path to production for Iron Ore and Bauxite Investor Presentation October 2024 ASX:AMD

  2. Slide 2: Disclaimer

    Slide 2: Disclaimer

    DISCLAIMER This presentation has been prepared by Arrow Minerals Limited (Arrow or the Company). It contains general information about the Company’s activities current as at the date of the presentation. The information is provided in summary form and does not purport to be complete. This presentati

  3. Slide 3: Iron Ore, Bauxite, Port, Rail, Transformation, Value

    Slide 3: Iron Ore, Bauxite, Port, Rail, Transformation, Value

    • IRON ORE • BAUXITE • PORT • RAIL • TRANSFORMATION • VALUE Arrow Minerals Ltd (ASX: AMD) 3

  4. Slide 4: Arrow Strategy – Start Small, Get Cashflow, Grow

    Slide 4: Arrow Strategy – Start Small, Get Cashflow, Grow

    ARROW STRATEGY – “START SMALL, GET CASHFLOW, GROW” Rapid and targeted exploration Explore as much of the project as quickly as possible to prioritise & right size the targets that have the best potential to deliver a mine Wherever possible, run workstreams in parallel Develop and execute “a starter

  5. Slide 5: Simandou North – Defining a Project

    Slide 5: Simandou North – Defining a Project

    SIMANDOU NORTH – DEFINING A PROJECT 1. Rapid exploration – Drilling commenced in February 2024, and the Company has estimated an Oxide BIF Exploration Target of approximately 281-716Mt at a grade of 33 to 46% Fe. Supporting metallurgical test work indicates the suitability of a simple wet gravity ci

  6. Slide 6: Niagara Bauxite – Targets Identified & Drilling Commenced

    Slide 6: Niagara Bauxite – Targets Identified & Drilling Commenced

    NIAGARA BAUXITE – TARGETS IDENTIFIED & DRILLING COMMENCED 1. Building on mineralisation defined by Vale in 2007, target areas have been identified, and drilling prioritised based on resource potential, distance to rail (the TGR), ease of access for mining, and favourable mining geometry. 2. Drilling

  7. Slide 7: Corporate Overview

    Slide 7: Corporate Overview

    CORPORATE OVERVIEW CAPITAL STRUCTURE1 Share Price $0.002 52 Week Range $0.001-$0.009 Market Capitalisation $26m Total number of shares on issue 13.0bn Performance Rights 21.0m Unlisted Options 4.1bn MAJOR SHAREHOLDERS2 AMD Board and Management 4.8% Top 20 Shareholders 35.9% CASH BALANCE as at 30 Sep

  8. Slide 8: Board & Management – Proven Mining People

    Slide 8: Board & Management – Proven Mining People

    BOARD & MANAGEMENT – PROVEN MINING PEOPLE Jeff Dowling David Flanagan Tommy McKeith Chris Tuckwell BSc (Mining and Mineral NON-EXECUTIVE CHAIR BSc (Hons), GDE (Mining), NON-EXECUTIVE DIRECTOR Exploration WASM), FAICD More than 45 years experience across MBA, FAusIMM Engineer with over 40 years’ expe

  9. Slide 9: The Time Is Now

    Slide 9: The Time Is Now

    THE TIME IS NOW “The timing is perfect, infrastructure is nearly built, we are progressing the assets and the demand for our commodities is looking great” Arrow’s Simandou North Iron Project and Niagara Bauxite Project1 are both advanced projects located in trucking distance to the multi-user Simand

  10. Slide 10: Niagara Bauxite Project

    Slide 10: Niagara Bauxite Project

    NIAGARA BAUXITE PROJECT “A transformational project, close to the Trans-Guinean Railway in the world’s most important bauxite province” There are records of 448 drill holes completed on the project. Last drilled by Vale in 2007. Since 2007 the bauxite price has tripled from global bauxite consumptio

  11. Slide 11: Niagara Bauxite Project

    Slide 11: Niagara Bauxite Project

    NIAGARA BAUXITE PROJECT “Resource Drilling has commenced – Mineralisation is typically at surface to depths up to 14 metres” Using 180 holes drilled by Vale in 2007 from a combined 448 historical holes as a guide: Drill approx. 150-180 holes for ~2,000 metres with the aim of confirming mineralizatio

  12. Slide 12: Simandou North Iron Project

    Slide 12: Simandou North Iron Project

    SIMANDOU NORTH IRON PROJECT “Potential for a large scale, high quality, long life project. Focused on a stage 1 ‘start up’ mine” 16 drill holes and 825 metres completed in 2023, 505 drill holes for 9,484 metres completed in 2024. Drilling at Simandou North Iron Project has delivered a significant Ex

  13. Slide 13: Simandou North and Niagara - Next Steps

    Slide 13: Simandou North and Niagara - Next Steps

    SIMANDOU NORTH AND NIAGARA - NEXT STEPS “We are very focused on executing the most efficient path to production and cashflow to create growth and returns for shareholders.” 1. Niagara Bauxite Project1: Our aim is to complete drilling, resource estimation, and a scoping study by mid-2025. This study

  14. Slide 14: Building a Better Future for Our Communities

    Slide 14: Building a Better Future for Our Communities

    BUILDING A BETTER FUTURE FOR OUR COMMUNITIES DEEPLY COMMITTED TO SUPPORTING THE LOCAL COMMUNITY AND RESPECTING THE ENVIORNMENT Environment Respect our environment and maintain high standards On-going rehabilitation throughout life of project Social Create long term jobs, maximizing sourcing from loc

  15. Slide 15: Arrow Minerals Limited

    Slide 15: Arrow Minerals Limited

    ARROW MINERALS LIMITED ASX : AMD Contact Address E: Unit 4, 38 Colin Street info@arrowminerals.com.au West Perth WA 6005 W: arrowminerals.com.au Media Enquiries Follow Us paul@readcorporate.com.au linkedin.com/company/arrow-minerals- limited twitter.com/arrowminerals Arrow Minerals Ltd (ASX: AMD) 15