  1. Slide 1: Update and Review

    Slide 1: Update and Review

    Update and Review Joe Ranford – General Manager 1

  2. Slide 2: Key points for Quarter 4

    Slide 2: Key points for Quarter 4

    Key points for Quarter 4  Management and monitoring continues at AZM  QER completed and circulated for the Quarter  TSF Seepage figures requested  Mine Closure Plan submitted  Environmental Management Plan for Closure/Rehabilitation Earthworks  All Phytocap testwork, modelling and risk assessm

  3. Slide 3: TSF Seepage Drain Graph

    Slide 3: TSF Seepage Drain Graph

    Flow rate (L/min) 5.00 0.00 10.00 15.00 20.00 25.00 9/5/2008 12/14/2008 3/24/2009 7/2/2009 10/10/2009 1/18/2010 4/28/2010 Drain 1 8/6/2010 11/14/2010 2/22/2011 Drain 2 6/2/2011 9/10/2011 Drain 3 12/19/2011 3/28/2012 TSF Seepage Drain Graph Drain 4 TSF Seepage Drain Flows 7/6/2012 10/14/2012 Drain 5

  4. Slide 4: Terramin update

    Slide 4: Terramin update

    Terramin update  Lime storage at AZM continues – dust is being monitored, no change from previous dust levels  PEPR approved for 6600m of exploration drilling at Bird in Hand  AZM Closure Plan taking priority  Plan remains to reopen Angas to treat gold ore and deposit a carbonate tail (neutralis

  5. Slide 5: Quarterly Environment Report

    Slide 5: Quarterly Environment Report

    Quarterly Environment Report Environment and Community: Matt Daniel 5

  6. Slide 6: Dust monitoring

    Slide 6: Dust monitoring

    Dust monitoring  New Hi-Volume Dust Sampler onsite  Terramin have commenced changing our own filters  Every three days, the head changes from PM10 to TSP  Pre-weighing of the filters was not as the Laboratory required – PM10 / TSP affected  Lead readings unaffected as analysis process different

  7. Slide 7: Mine void groundwater hydraulic gradient > recharge is as per model predictions

    Slide 7: Mine void groundwater hydraulic gradient > recharge is as per model predictions

    Mine void groundwater hydraulic gradient > recharge is as per groundwater model predictions 0 50 100 November 2014 – 400 days 150 200 250 DH2 Mine Void RL 7 After 400 days, AGT model predicted Mine Void RL at approx. 75 RL.

  8. Slide 8: Mine Void Groundwater modelling

    Slide 8: Mine Void Groundwater modelling

    Mine Void Groundwater modelling  AMD is a priority focus > URS modelled solute, AGT modelled groundwater movements  Cone of Depression is being maintained as per AGT’s recommendations  Greatest risk of AMD generation is in first 6 months after mining, important to get mine workings submerged, thi

  9. Slide 9: RG 7 CIB 1 + 2 RG 4

    Slide 9: RG 7 CIB 1 + 2 RG 4

    RG 7 CIB 1 + 2 RG 4 9 I V

  10. Slide 10: Early warning level exceedance: TSF D

    Slide 10: Early warning level exceedance: TSF D

    Early warning level exceedance: TSF D TSF D recorded higher measurements of Arsenic for Q4 – 0.029mg/L  TSF bores PEPR leading indicator – 0.0161mg/L  Regional bores PEPR criteria (Av+2SD / 2008 – 2010) – 0.038 mg/L  Regional historic maximum value – 0.09 (from 75 readings between 2008- 2010) Inv

  11. Slide 11: yuow/wu s s

    Slide 11: yuow/wu s s

    yuow/wu 2 2 2 2 5 s s 8 8 = 1 | Me June/July 2013 November 2012 June/July 2012 0.035 ° 4 2 n ° ra ° 3 4 g a E} 8 8 8 8 8 3 3 8 8 3 3 3 3 3 3 3 130 Rainfall (average per month) Leading Indicator —As-T

  12. Slide 12: TSF D – at a glance

    Slide 12: TSF D – at a glance

    As (mg/L) Pb (mg/L) 0.01 0.02 0.03 0 0.005 0.015 0.025 0.035 Jan-14 0.1 0.2 0.3 0.05 0.15 0.25 0.35 0 Jan-14 Feb-14 TSFA Feb-14 Mar-14 TSFA Mar-14 Apr-14 Apr-14 TSFB TSFB May-14 May-14 Jun-14 Jun-14 TSFD Arsenic TSF D Jul-14 Jul-14 Lead Aug-14 Aug-14 Sep-14 Sep-14 Oct-14 Leading Indicator Oct-14 Nov

  13. Slide 13: Field Measurements of Tailings - pH

    Slide 13: Field Measurements of Tailings - pH

    Field Measurements of Tailings - pH 8 7 6 5 pH 4 3 2 1 0 2/20/2014 4/6/2014 10/31/2014 12/19/2014 dates samples collected 13 Average Linear (Average)

  14. Slide 14: SCCC and Regulation at AZM 2007 - 2014

    Slide 14: SCCC and Regulation at AZM 2007 - 2014

    SCCC and Regulation at AZM 2007 - 2014 14

  15. Slide 15: The beginning …

    Slide 15: The beginning …

    The beginning … 15

  16. Slide 16: Mining and Rehabilitation Plan 2007 “MARP”

    Slide 16: Mining and Rehabilitation Plan 2007 “MARP”

    Mining and Rehabilitation Plan 2007 “MARP”  The Mineral Lease (ML6229) was granted on 17 August 2006 with Lease Conditions  2007 MARP included SCCC consultation  Risk based  Outlined objectives of Closure  Divided into Domains  Included ongoing environmental management/monitoring once rehabili

  17. Slide 17: … To this

    Slide 17: … To this

    … To this 17

  18. Slide 18: Program for Environmental Protection and Rehabilitation 2012 “PEPR”

    Slide 18: Program for Environmental Protection and Rehabilitation 2012 “PEPR”

    Program for Environmental Protection and Rehabilitation 2012 “PEPR”  Changes to Mining Act in 2011 replaced MARP with PEPR (Part 10A)  SCCC sub-committee input for Outcome Criteria Tables for 2012 PEPR  Initial PEPR was submitted in 2012  Preliminary HDPE Mine Closure Plan - Appendix C > further

  19. Slide 19: Initial Care and Maintenance and revised Closure Plan: October 2013

    Slide 19: Initial Care and Maintenance and revised Closure Plan: October 2013

    Initial Care and Maintenance and revised Closure Plan: October 2013  Phytocap cover system principles explored in Closure Plan  Visit at SCCC from URS engineer Andrew Piggin  Phytocap concept presented to SCCC – May 2013 and May 2014  Closure Plan submitted to DMITRE in October 2013  Closure ob

  20. Slide 20: Closure Risk Assessments

    Slide 20: Closure Risk Assessments

    Closure Risk Assessments  ISO 31000:2009 Risk Management (Australian Standard)  Internal Terramin risk assessment  Failure Modes Effects Analysis (FMEA)  Workshop in June 2013 with Terramin, DSD, EPA, O’Kane, AGT and URS  The FMEA process is an additional risk assessment framework used to ident

  21. Slide 21: Revised PEPR with Closure Plan 2014 “PEPR Appendix C”

    Slide 21: Revised PEPR with Closure Plan 2014 “PEPR Appendix C”

    Revised PEPR with Closure Plan 2014 “PEPR Appendix C”  DSD request for Closure Plan to be incorporated with PEPR  Resubmitted February 2014 with commitment to Failure Mode Effects Analysis (FMEA) table and in line with feedback from Regulators  TSF Cover design, Boxcut Geotechnical Report and dra

  22. Slide 22: December 2014 PEPR with Completed Closure Plan

    Slide 22: December 2014 PEPR with Completed Closure Plan

    December 2014 PEPR with Completed Closure Plan  More feedback received from Regulators  Resubmitted in December 2014 with updated Closure monitoring, draft LMA, TSF Conceptual Phytocap report & Boxcut Geotechnical Report Feb 2014: July 2014: 2007 2012 2013: Care & December Closure Plan Care & Main

  23. Slide 23: Outcome Criteria Tables

    Slide 23: Outcome Criteria Tables

    Outcome Criteria Tables What will be Outcome measured Outcome and form Control or Outcome Measurement (method) Location Achieve- Frequency Baseline Data Criteria of ment measurem ent Rehabilitation Earthworks Phase Rill and gully erosion will be Annually until monitored annually until EFA monitoring

  24. Slide 24: Ecosystem Function Analysis: Closure Outcome Criteria

    Slide 24: Ecosystem Function Analysis: Closure Outcome Criteria

    Ecosystem Function Analysis: Closure Outcome Criteria Main points EFA is used for  Revegetation  Weeds and Pests  Erosion / soil  Dust  EFAs are a WHOLISTIC approach to long term land management.  EFAs will drive any land management intervention 24

  25. Slide 25: Summary of Updates to Closure Outcome Criteria Tables

    Slide 25: Summary of Updates to Closure Outcome Criteria Tables

    Summary of Updates to Closure Outcome Criteria Tables Closure Criteria Monitoring Erosion EFA, photo monitoring Vegetation EFA, photo monitoring Dust Linked to EFA Groundwater Three mine void bores, five regional Surface water EPA - One upstream site, one downstream site AMD TSF and mine void specif

  26. Slide 26: Closure Plan - Ongoing

    Slide 26: Closure Plan - Ongoing

    Closure Plan - Ongoing  Mine void groundwater model calibration from field data  Final engineered design for TSF cover  Once the final TSF shape is finalised, an engineered design can be completed (Within one year of Closure announcement)  Environmental Monitoring Plan (derived when Closure Outc

  27. Slide 27: Timeline so far - Timeline for Closure

    Slide 27: Timeline so far - Timeline for Closure

    Timeline so far - Feb 2014: July 2014: 2013: Care & December Closure Plan Care & 2007 MARP 2012 PEPR Maintenance/Clo / C&M Maintenance 2014: sure Plan Closure Plan update update Timeline for Closure - 1 year 2 years 2 years Earthworks TZN Final TSF phase LMA finalised upon all announce cover Rehabil

  28. Slide 28: Activities/Reports between 2012 and 2014 for Mine Closure Plan

    Slide 28: Activities/Reports between 2012 and 2014 for Mine Closure Plan

    Activities/Reports between 2012 and 2014 for Mine Closure Plan  Summary of Closure issues raised  TSF during Stakeholder Consultations  TSF PAF tails monitoring (ongoing)  FMEA Workshop Outcome Table  TSF Capping Trials (2012-13) (including Action Plan)  TSF Cap Options – Preliminary  Mine Cl

  29. Slide 29: Permeability of Phytocap v HDPE Cap

    Slide 29: Permeability of Phytocap v HDPE Cap

    Permeability of Phytocap v HDPE Cap  FMEA Risk Assessment outlined need for best option over 1000 year timeframe  Phytocap technology superior in semi-arid climates  Lower risk rating of water infiltration for Phytocap compared to HDPE cover in FMEA Risk Assessment  Phytocap is designed using ‘n

  30. Slide 30: Next Steps

    Slide 30: Next Steps

    Next Steps  Extractive Mineral Lease PEPR resubmission 27th February 2015  Replacement of SCCC Chair  Once Closure Plan approved, commencement of Phytocap Cover Trial  Mineral Lease renewal – 2016  Community consultation on proposed operational changes at AZM  Update AZM PEPR and Closure Plan