BacTech Environmental Corp. · CSE:BAC

BacTech Environmental — Investor Presentation (January 2022)

20 slides from BacTech Environmental's investor presentation, January 2022

  1. Slide 1: Investor Presentation Q1 2022

    Slide 1: Investor Presentation Q1 2022

    CC INVESTOR PRESENTATION Q1 2022 CSE:BAC | OTCBB:BCCEF | FRA: 0BT1

  2. Slide 2: Legal Disclaimer

    Slide 2: Legal Disclaimer

    LEGAL DISCLAIMER This presentation contains certain forward-looking statements within the meaning of Canadian securities legislation (the “Forward-looking Statements”) and within the meaning of Section 21E of the United States Securities Exchange Act of 1934, as amended. Although the Company believe

  3. Slide 3: About BacTech

    Slide 3: About BacTech

    ABOUT BACTECH BacTech is a proven environmental technology company, delivering effective and eco-friendly biomining and remediation solutions to commercial operations to smartly process and recover preferred metals (gold, silver, cobalt, and copper) and safely remove and transform harmful contaminan

  4. Slide 4: Investment Highlights

    Slide 4: Investment Highlights

    INVESTMENT HIGHLIGHTS • Near term revenue producing potential from proposed owner operated 50 tpd Bio-Oxidation plant. Located in Ponce Enriquez, Ecuador. With the potential to expand modularly to meet the 250 tpd market size. Construction is expected to begin in Q3, 2022. • Capital Expenditure $15.

  5. Slide 5: The Technology: Our Bugs Eat Rocks!

    Slide 5: The Technology: Our Bugs Eat Rocks!

    THE TECHNOLOGY Our Bugs Eat Rocks! 1) Conventional gravity/flotation to remove sulphides from ore/tailings to make high-grade gold/arsenic concentrate • Sulphides are the source of acid release but also contain the valuable metal to be recovered. 2) Bioleaching of arsenopyrite (arsenic/sulphide ore)

  6. Slide 6: Sustainability at Our Core

    Slide 6: Sustainability at Our Core

    SUSTAINABILTY AT OUR CORE Bacteria Water The bacteria are naturally Efficient recycling of occurring and harmless to the water from the process. environment and human health. Heavy Metal Recovery Emissions Toxic heavy metals, like arsenic, are No toxic gaseous converted into stable, environmentally

  7. Slide 7: Economic Benefits

    Slide 7: Economic Benefits

    ECONOMIC BENEFITS • Remediation of tailings at no cost to government • Capture all the local small miner production due to Chinese reduction in payment terms • Revenues through the recovery of contained metals — Au, Ag, Cu, Ni, Zn, Co • Local opportunities for work, training, development and the sta

  8. Slide 8: Project Lifecycle

    Slide 8: Project Lifecycle

    PROJECT LIFECYCLE • Engagement: BacTech engages local parties to evaluate the potential for a project. • Feasibility: BacTech performs assay testing, bioleaching test work and feasibility study to confirm the project is economically viable. • Build & Operation: BacTech designs and builds the plant a

  9. Slide 9: Capitalization

    Slide 9: Capitalization

    Current Ownership CAPITALIZATION 13.6% Sol Ecosystems Basic Shares Outstanding 157M Reserved (Options and Warrants) 34M Management/Directors and 13% Consultants FD-Total Shares Outstanding 191M Market Capitalization* $24.33M Ross Orr, CEO and 4.2% President *As of December 30, 2021 @ 0.155/share 9.0

  10. Slide 10: Cleantech Industry

    Slide 10: Cleantech Industry

    CLEANTECH INDUSTRY Operational Sustainable sources of precious metals and Chemical leaching to recover precious metals Sustainable sources of precious metals and Design, development, manufacture and Focus bioremediation. from e-waste and gold bioremediation. commercialization of ores advanced plasma

  11. Slide 11: Board of Directors and Management Team

    Slide 11: Board of Directors and Management Team

    BOARD OF DIRECTORS Timothy Lewin Ross Orr Walter Cimowski Donald Whalen Jay Richardson Jay Naster Chairman Director, President Director, Audit Director Director, Audit Director, Audit and CEO Committee Committee Committee MANAGEMENT TEAM Ross Orr David Tingey Louis R. Nagy Dr. Paul C Miller Bernardo

  12. Slide 12: Ponce Enriquez Project Local Benefits

    Slide 12: Ponce Enriquez Project Local Benefits

    PONCE ENRIQUEZ PROJECT Local Benefits ü Providing local processing and better prices to miners. ü Support from the Ministry of Artisanal and Small Miners. • Market uncertainty for existing concentrate buyers/sellers with Low Prices and Delayed Payments for existing arsenic heavy concentrates. • Pote

  13. Slide 13: Ponce Enriquez Project Economic Highlights

    Slide 13: Ponce Enriquez Project Economic Highlights

    PONCE ENRIQUEZ PROJECT Economic Highlights • Pre-tax NPV (Net Present Value with 5% discount rate) of US $46.9M • Pre-tax IRR (Internal Rate of Return) of 48% • Annual Gold Production of 25,900 ounces • Capital Cost of US $15.5M • Bioleach Operating Cost of US $212 per tonne • Assumed Purchase Price

  14. Slide 14: Ponce Enriquez Project Economics

    Slide 14: Ponce Enriquez Project Economics

    PONCE ENRIQUEZ PROJECT ECONOMICS Au Price NPV (5%) IRR EBITA $1,500 USD $41M 43% $8.1M $1,600 USD $47M 47% $8.8M $1,700 USD $53M 53% $9.7M $1,800 USD $59M 57% $10.6M $1,900 USD $65M 62% $11.4M CSE:BAC | OTCBB:BCCEF

  15. Slide 15: Ponce Enriquez Project Timeline

    Slide 15: Ponce Enriquez Project Timeline

    PONCE ENRIQUEZ PROJECT TIMELINE Ecuador Project Q1 2022 Q2 2022 Q3 2022 Q4 2022 Bioleach Test Work Completed Feasibility Study Completed Detailed Engineering In Progress Project Financing In Progress Permitting In Progress Construction In Progress CSE:BAC | OTCBB:BCCEF

  16. Slide 16: Ponce Enriquez Bioleach Test Work Results

    Slide 16: Ponce Enriquez Bioleach Test Work Results

    PONCE ENRIQUEZ BIOLEACH TEST WORK RESULTS Feedstock Bio-oxidized Gold Tail Gold Grade Feedstock Gold Feedstock Arsenic Supplied to the Grade for CIL After CIL Gold Gold Recovery (%) Head Grade (g/t) Content (%) Test processing (g/t) Extraction (g/t) Conc. 1 + Conc.3 54.6 16 55.0 2.15 96.1 Conc. 5 21

  17. Slide 17: Ponce Enriquez Project Schematic

    Slide 17: Ponce Enriquez Project Schematic

    PONCE ENRIQUEZ PROJECT SCHEMATIC CSE:BAC | OTCBB:BCCEF

  18. Slide 18: Colombia Gold/Platinum Tailings

    Slide 18: Colombia Gold/Platinum Tailings

    COLUMBIA GOLD/PLATINUM TAILINGS • Approached by private, US-based miner working in Colombia. • Actlabs (Canada) assayed material provided by the miner from the tailings. • 17 gpt Gold and 34 gpt Platinum in 100,000 tons (~$200M total metal) • Next step is 3rd party verification as samples not arm’s

  19. Slide 19: Long Term Project Potential

    Slide 19: Long Term Project Potential

    LONG TERM PROJECT POTENTIAL • Peru • Colombia • Central America • Chile • Anywhere arsenic is associated with gold/silver/copper CSE:BAC | OTCBB:BCCEF

  20. Slide 20: Thank You!

    Slide 20: Thank You!

    BacTech Environmental Corporation Suite 409, 37 King St. East Toronto, Ontario M5C1E9 www.bactechgreen.com Ross Orr, President & CEO THANK YOU! borr@bactechgreen.com Office: 416-813-0303 ext. 222 CSE:BAC | OTCBB: BCCEF CSE:BAC | OTCBB:BCCEF

Source: Internet Archive copy of bactechgreen.com

More decks from BacTech Environmental Corp.

All 10 BacTech Environmental decks