Bactech Environmental Corp. · CSE:BAC
Bactech Environmental — Investor Presentation (September 2026)
19 slides from Bactech Environmental's investor presentation, September 2026
Slide 1: BacTech Environmental
BacTech Environmental Our bugs eat rocks...seriously!
Slide 2: Disclaimer
DISCLAIMER IMPORTANT – YOU MUST READ THE FOLLOWING BEFORE CONTINUING: The information contained in this report has been prepared by BacTech Environmental Corporation (“BacTech” or the “Company”) with the assistance of Ascenta Finance Corp.* (“Ascenta”) and contains confidential information pertainin
Slide 3: Executive Summary
3 plants built under license agreements: 2 in Australia and 1 in China. We chase Arsenic while everyone EXECUTIVE else runs away. SUMMARY Over 35 years of bioleaching Fully permitted, project shovel ready in research and development. Ecuador for processing high As/Au concentrates produced in Ponce E
Slide 4: Bioleaching Plant China
BacTech Environmental BIOLEACHING PLANT China
Slide 5: Tenguel, Ecuador Concentrates
TENGUEL, ECUADOR Concentrates
Slide 6: Why Tenguel?
1. Mining Activity 2. Ore Characteristics • Over 100 underground • High grade gold but mines producing from also very high arsenic. 10-400 tpd of ore daily. WHY TENGUEL? 3. Market Challenge 4. Market Control • Severely reduces options • Chinese dominate the for miners to sell their market and offer
Slide 7: Phase 1: 50 TPD Bioleach Plant
PHASE 1: 50 TPD $3800 gold = $29M profit +42% calculated as follows: BIOLEACH PLANT Bankable Feasibility Study BFS (“BFS”) completed @ $1600 gold. Artificial Intelligence +50 Cut-off grade of 50 gpt Au. gpt AU. Internet of Things • Capex $22M. +11M BFS showed $11M profit on $17M • 35,000 ounces per
Slide 8: Phase 2: Adding 200 TPD of Capacity
PHASE 2: ADDING 200 TPD OF CAPACITY Business Modular set up allows for model ($3,800 Au) uninterrupted expansion. Gold Total Gold Production Production ~125,000 opt. Capex Capex $80M. Gold grade in Conc. Gold grade ~45 gpt. *Millions
Slide 9: Tenguel Gold Price Sensitivity Analysis
TENGUEL GOLD PRICE SENSITIVITY ANALYSIS Phase 1 Phase 1 Phase 2 Phase 2 Phase 1+2 Phase 1+2 Price Revenue Profit Revenue Profit Revenue Profit $2,750 124.8 19.5 234.7 56.1 359.5 75.6 $3,000 143.1 21.9 267.5 62.2 410.6 84.1 $3,250 161.5 24.4 300.3 68.4 461.8 92.8 $3,500 179.8 26.8 333.2 74.6 513 101.
Slide 10: Reframing Mine Waste: From Perpetual Liability to Revenue Creation
Reframing Mine Waste: From Perpetual Liability to Revenue Creation Zero Tailings. – A Unified Model for AMD, Legacy and Operating Tailings Paul Miller Ph.D. Chem.Eng. VP Technology & Engineering BacTech Environmental Corporation. Toronto. Canada.
Slide 11: Structural Inefficiency in Current Waste Management
STRUCTURAL INEFFICIENCY IN CURRENT WASTE MANAGEMENT Capital pressure is rising AMD treated as perpetual cost TSF construction, bonding costs, permitting delays Legacy tails capped and monitored Risk is being repriced Operational concerns now = corporate risk Current operations "Add to the Pile" Decl
Slide 12: The Innovative Zero Tailings Treatment Platform
THE INNOVATIVE ZERO TAILINGS TREATMENT PLATFORM Transforming Waste into Revenue Single or Multiple Feed Inputs •AMD •Legacy tails •Operating tails A Single Process •Controlled rapid bio-leach treatment •Ammonia-based conversion chemistry •Integrated metal recovery •Iron & sulfur co-product generatio
Slide 13: Concentrator Tails: Parallel Revenue from Zero Tailings Processing
CONCENTRATOR TAILS: PARALLEL REVENUE FROM ZERO TAILINGS PROCESSING Key Findings: Metric Value • A "safety net" capturing 5%-10% of metal values lost Prototype Unit Throughput 0.35Mtpa in concentrator tails • Adds flexibility to concentrator operation without Capital 45(US$M) impacting primary recove
Slide 14: Zero Tailings: Solving the Industry's Definitive Challenges
ZERO TAILINGS : Solving the Industry’s Definitive Challenges SOLUTION Status Quo: Zero Tailings Outcome: 1. The Stranded Asset Revoked Contract, Restored Social License Self- (e.g. Cobre Panama) Imminent Risk Financed Closure Status Quo: Zero Tailings Outcome: 2. The Legacy Liability Perpetual AMD,
Slide 15: The Kazakhstan Agreement
THE KAZAKHSTAN AGREEMENT BacTech signs a technical agreement to evaluate historic tailings in East Kazakhstan. 36.6Mt What was signed A Technical Consulting and Testing Agreement with Di-As Company Ltd. (1 Sept 2026), covering BACOX® bioleach evaluation of historic sulphide tailings in the Zyryanovs
Slide 16: Status and What Comes Next
STATUS AND WHAT COMES NEXT Early-stage and fully funded by the counterparty WHAT' S CONF IR MED WHAT' S NOT YET CONF IRME D • Agreement signed and announced 1 Sept 2026 • The QP has not visited the Staroe facility and has not independently verified the historical estimate • BacTech granted a 5% NSR
Slide 17: Peru
PERU • N ew s ubsi di ar y c rea te d -B acTe ch Ve rd e Pe ru SA C. • E narg it e i s t he sul phi de m i ner al of choi c e i n nor the rn Pe ru. • Go l d+s i l ver +co pper +ar se ni c. • M i ned ore is tr uc ke d t o proc es sor s i n T ruji l l o (por t ci ty ). • The re are 28 known pro ces so
Slide 18: Corporate Capitalization Structure
CORPORATE CAPITALIZATION STRUCTURE STRUCTURE BacTech utilizes a relatively straight forward BacTech’s capitalization structure as of corporate structure: September 16, 2026 is as follows: BacTech Environmental Corporation Basic Shares Outstanding 238M Public Parent Co. Reserved for Issuance (Options
Slide 19: For More Information, Please Contact: Ross Orr, CEO
FOR MORE INFORMATION, PLEASE CONTACT: Ross Orr, CEO borr@bactechgreen.com 416-346-5529