Terramin Australia Limited · ASX:TZN

Terramin Australia — Technical Presentation (November 2017)

21 slides from Terramin Australia's technical presentation, Nov 8, 2017

  1. Slide 1: Mining Lease Proposal – timing update

    Slide 1: Mining Lease Proposal – timing update

    Mining Lease Proposal – timing update  Currently – drafting Mining Lease Proposal  Mid-December – draft MLA provided to Government  April 2018 – Proposed lodgement of MLA  Now to Lodgement – ongoing consultation with WCCC TERRAMIN AUSTRALIA LIMITED SLIDE No. 1

  2. Slide 2: Questions and Answers – Set B

    Slide 2: Questions and Answers – Set B

    Questions and Answers – Set B  Questions posed to Terramin from:  Neighbours  Community Drop In Days  Focus Groups  Technical Workshops  Emails  Letters  This is now the full set (A+B). New questions posed will be in an addendum next meeting. TERRAMIN AUSTRALIA LIMITED SLIDE No. 2

  3. Slide 3: Noise – WCCC Presentation, Bird in Hand Gold Project

    Slide 3: Noise – WCCC Presentation, Bird in Hand Gold Project

    TERRAMIN AUSTRALIA LIMITED Noise WCCC Presentation Bird in Hand Gold Project Terramin Australia 8th November 2017

  4. Slide 4: Noise – Existing Environment

    Slide 4: Noise – Existing Environment

    Noise – Existing Environment  Baseline monitoring undertaken during 2014, 2015 and 2016 (both in and out of vintage)  Allows for characterisation and quantification of existing environment Noise logger TERRAMIN AUSTRALIA LIMITED SLIDE No. 4

  5. Slide 5: Characterisation - Background noise environment

    Slide 5: Characterisation - Background noise environment

    Characterisation - Background noise environment  During the day - approximately 45 dB(A) (15 minute average) and 30 dB(A) during quiet periods.  The highest 15 minute average noise level during the day is approximately 55-60 dB(A).  During the night - approximately 35 dB(A) (15 minute average) an

  6. Slide 6: BIH Gold Project Noise – Predictive modelling

    Slide 6: BIH Gold Project Noise – Predictive modelling

    BIH Gold Project Noise – Predictive modelling  Independent noise modelling (AECOM) to predict impact on identified sensitive receptors considered:  Latest topography surfaces  Conservative estimates for equipment, buildings  Features everything occurring at once  Meteorological data  Ground ab

  7. Slide 7: Zoning – Rural Industry

    Slide 7: Zoning – Rural Industry

    Zoning – Rural Industry  The proposed ML and nearest noise-sensitive receptors are located within the Watershed (Primary Production) Zone with Onkaparinga Valley Policy Area  Defined under the Adelaide Hills Council Development Plan  “Rural Industry”  Noise EPP – Noise Environment Protection Pol

  8. Slide 8: Law - Proposed Outcome Criteria

    Slide 8: Law - Proposed Outcome Criteria

    Law - Proposed Outcome Criteria What we are proposing to be monitored against Outcome: Ensure there are no public nuisance impacts from noise emanating from the operating site.  Legally enforceable criteria under the Mining Act 1971 (SA)  Provides the basis for all design and monitoring  Outcome

  9. Slide 9: Construction Measurable Criteria

    Slide 9: Construction Measurable Criteria

    Construction Measurable Criteria  Building all surface & underground infrastructure – sheds, water treatment plant and dams, landscape bunding, constructing ore system and silo  Under Development Act 1993 - No day time limits apply during construction  DPC advised Noise EP Policy limits will appl

  10. Slide 10: Ore Production Compliance Criteria

    Slide 10: Ore Production Compliance Criteria

    Ore Production Compliance Criteria  Operating ventilation fans, dump truck movements between underground and IML, ore conveyor into silo, haul truck loading to Strathalbyn  EPA Noise policy states 57 dB(A) day / 50 dB(A) night  Terramin commit to 52 dB(A) day / 45 dB(A) night TERRAMIN AUSTRALIA L

  11. Slide 11: Process

    Slide 11: Process

    Process ~ 12-15 months ~ 5 years ~ 12 months TERRAMIN AUSTRALIA LIMITED SLIDE No. 11

  12. Slide 12: Construction, Underground Development and Ore production

    Slide 12: Construction, Underground Development and Ore production

    Construction, Underground Development and Ore production  Construction  Building all surface infrastructure – sheds, water treatment plant and dams, landscape bunding, constructing ore system and silo  Underground development  Ventilation shafts (raise bore), decline (tunnel), drilling into unde

  13. Slide 13: Mitigation and Management

    Slide 13: Mitigation and Management

    Mitigation and Management  Landscape bunding can provide shielding of noise emissions from the operational area Soundwaves Landscape bunding TERRAMIN AUSTRALIA LIMITED SLIDE No. 13

  14. Slide 14: Mitigation and Management

    Slide 14: Mitigation and Management

    Mitigation and Management  Primary design features  Landform  Equipment selection  Shielding – insulated shedding, noise curtains  Rubber lining on Ore Silo system  Example:  Insulated shedding around pumps TERRAMIN AUSTRALIA LIMITED SLIDE No. 14

  15. Slide 15: Construction includes – all operating at once time – conservative approach

    Slide 15: Construction includes – all operating at once time – conservative approach

    Construction includes – all operating at once time – conservative approach TERRAMIN AUSTRALIA LIMITED SLIDE No. 15

  16. Slide 16: Expected Impacts – Construction DAY TIME

    Slide 16: Expected Impacts – Construction DAY TIME

    Expected Impacts – Construction DAY TIME TERRAMIN AUSTRALIA LIMITED SLIDE No. 16

  17. Slide 17: Expected Impacts – UG development DAY TIME

    Slide 17: Expected Impacts – UG development DAY TIME

    Expected Impacts – UG development DAY TIME TERRAMIN AUSTRALIA LIMITED SLIDE No. 17

  18. Slide 18: Expected Impacts – UG development NIGHT TIME

    Slide 18: Expected Impacts – UG development NIGHT TIME

    Expected Impacts – UG development NIGHT TIME TERRAMIN AUSTRALIA LIMITED SLIDE No. 18

  19. Slide 19: Expected Impacts – Ore Production DAY TIME

    Slide 19: Expected Impacts – Ore Production DAY TIME

    Expected Impacts – Ore Production DAY TIME TERRAMIN AUSTRALIA LIMITED SLIDE No. 19

  20. Slide 20: Expected Impacts – Ore Production NIGHT TIME

    Slide 20: Expected Impacts – Ore Production NIGHT TIME

    Expected Impacts – Ore Production NIGHT TIME TERRAMIN AUSTRALIA LIMITED SLIDE No. 20

  21. Slide 21: Proposal

    Slide 21: Proposal

    Proposal -  With mitigation,  Construction and underground development meet the Rural Industry Zoning criteria;  Ore production at the mine site, predicted to meet the proposed Measurement Criteria of 5dB(A) less than Rural Industry legislated limits; (52 5dB(A) day / 47 5dB(A) night)  Leading i