Slide 1: Mining Lease Proposal – timing update
Mining Lease Proposal – timing update Currently – drafting Mining Lease Proposal Mid-December – draft MLA provided to Government April 2018 – Proposed lodgement of MLA Now to Lodgement – ongoing consultation with WCCC TERRAMIN AUSTRALIA LIMITED SLIDE No. 1

Slide 2: Questions and Answers – Set B
Questions and Answers – Set B Questions posed to Terramin from: Neighbours Community Drop In Days Focus Groups Technical Workshops Emails Letters This is now the full set (A+B). New questions posed will be in an addendum next meeting. TERRAMIN AUSTRALIA LIMITED SLIDE No. 2

Slide 3: Noise – WCCC Presentation, Bird in Hand Gold Project
TERRAMIN AUSTRALIA LIMITED Noise WCCC Presentation Bird in Hand Gold Project Terramin Australia 8th November 2017

Slide 4: Noise – Existing Environment
Noise – Existing Environment Baseline monitoring undertaken during 2014, 2015 and 2016 (both in and out of vintage) Allows for characterisation and quantification of existing environment Noise logger TERRAMIN AUSTRALIA LIMITED SLIDE No. 4

Slide 5: Characterisation - Background noise environment
Characterisation - Background noise environment During the day - approximately 45 dB(A) (15 minute average) and 30 dB(A) during quiet periods. The highest 15 minute average noise level during the day is approximately 55-60 dB(A). During the night - approximately 35 dB(A) (15 minute average) an

Slide 6: BIH Gold Project Noise – Predictive modelling
BIH Gold Project Noise – Predictive modelling Independent noise modelling (AECOM) to predict impact on identified sensitive receptors considered: Latest topography surfaces Conservative estimates for equipment, buildings Features everything occurring at once Meteorological data Ground ab

Slide 7: Zoning – Rural Industry
Zoning – Rural Industry The proposed ML and nearest noise-sensitive receptors are located within the Watershed (Primary Production) Zone with Onkaparinga Valley Policy Area Defined under the Adelaide Hills Council Development Plan “Rural Industry” Noise EPP – Noise Environment Protection Pol

Slide 8: Law - Proposed Outcome Criteria
Law - Proposed Outcome Criteria What we are proposing to be monitored against Outcome: Ensure there are no public nuisance impacts from noise emanating from the operating site. Legally enforceable criteria under the Mining Act 1971 (SA) Provides the basis for all design and monitoring Outcome

Slide 9: Construction Measurable Criteria
Construction Measurable Criteria Building all surface & underground infrastructure – sheds, water treatment plant and dams, landscape bunding, constructing ore system and silo Under Development Act 1993 - No day time limits apply during construction DPC advised Noise EP Policy limits will appl

Slide 10: Ore Production Compliance Criteria
Ore Production Compliance Criteria Operating ventilation fans, dump truck movements between underground and IML, ore conveyor into silo, haul truck loading to Strathalbyn EPA Noise policy states 57 dB(A) day / 50 dB(A) night Terramin commit to 52 dB(A) day / 45 dB(A) night TERRAMIN AUSTRALIA L

Slide 11: Process
Process ~ 12-15 months ~ 5 years ~ 12 months TERRAMIN AUSTRALIA LIMITED SLIDE No. 11

Slide 12: Construction, Underground Development and Ore production
Construction, Underground Development and Ore production Construction Building all surface infrastructure – sheds, water treatment plant and dams, landscape bunding, constructing ore system and silo Underground development Ventilation shafts (raise bore), decline (tunnel), drilling into unde

Slide 13: Mitigation and Management
Mitigation and Management Landscape bunding can provide shielding of noise emissions from the operational area Soundwaves Landscape bunding TERRAMIN AUSTRALIA LIMITED SLIDE No. 13

Slide 14: Mitigation and Management
Mitigation and Management Primary design features Landform Equipment selection Shielding – insulated shedding, noise curtains Rubber lining on Ore Silo system Example: Insulated shedding around pumps TERRAMIN AUSTRALIA LIMITED SLIDE No. 14

Slide 15: Construction includes – all operating at once time – conservative approach
Construction includes – all operating at once time – conservative approach TERRAMIN AUSTRALIA LIMITED SLIDE No. 15

Slide 16: Expected Impacts – Construction DAY TIME
Expected Impacts – Construction DAY TIME TERRAMIN AUSTRALIA LIMITED SLIDE No. 16

Slide 17: Expected Impacts – UG development DAY TIME
Expected Impacts – UG development DAY TIME TERRAMIN AUSTRALIA LIMITED SLIDE No. 17

Slide 18: Expected Impacts – UG development NIGHT TIME
Expected Impacts – UG development NIGHT TIME TERRAMIN AUSTRALIA LIMITED SLIDE No. 18

Slide 19: Expected Impacts – Ore Production DAY TIME
Expected Impacts – Ore Production DAY TIME TERRAMIN AUSTRALIA LIMITED SLIDE No. 19

Slide 20: Expected Impacts – Ore Production NIGHT TIME
Expected Impacts – Ore Production NIGHT TIME TERRAMIN AUSTRALIA LIMITED SLIDE No. 20

Slide 21: Proposal
Proposal - With mitigation, Construction and underground development meet the Rural Industry Zoning criteria; Ore production at the mine site, predicted to meet the proposed Measurement Criteria of 5dB(A) less than Rural Industry legislated limits; (52 5dB(A) day / 47 5dB(A) night) Leading i
Source: Internet Archive copy of terramin.com.au
More decks from Terramin Australia Limited
Shareholder Meeting (May 2026)15 slides · May 2026
Shareholder Meeting (May 2025)12 slides · May 2025
Shareholder Meeting (May 2022)12 slides · May 26, 2022
Investor Presentation (October 2019)23 slides · Oct 31, 2019
Investor Presentation (October 2019)22 slides · Oct 30, 2019
Technical Presentation (June 2019)20 slides · June 2019