Aeris Resources Limited · ASX:AIS

Aeris Resources — Bell Potter Unearthed Conference 2023

33 slides from Aeris Resources's conference presentation, Feb 8, 2023

  1. Slide 1: Bell Potter Unearthed Conference

    Bell Potter Unearthed Conference 8 February 2023 Presented by: Andre Labuschagne Aeris Resources Limited

  2. Slide 2: Disclaimer

    Disclaimer This investor presentation has been prepared by Aeris Resources Limited (“Aeris” or the “Company”). By attending an investor presentation or briefing, or accepting, accessing or reviewing this presentation, you acknowledge and agree to the terms set out below. Summary information This pre

  3. Slide 3: Disclaimer

    Disclaimer Production Targets Cautionary Statement The Ore Reserve and Mineral Resource estimates underpinning the Stockman Production Targets (refer to slide 25) were prepared by a Competent Person in accordance with the JORC Code 2012. The material assumptions on which the Production Targets are b

  4. Slide 4: Aeris Resources

    Aeris Resources Australian mid-tier base and precious metals producer 4 producing operations 1 long life development project Resources of 780kt Cu, 993kt Zn, 1.4Moz Au1 FY23 production of 57 – 71kt Cu equivalent2 Strong long-term exposure to copper Excellent platform for growth 1. As at 30 June 2022

  5. Slide 5: Corporate overview

    Corporate overview Robust balance sheet and supportive shareholder base Capitalisation Shareholders3 A$ Market capitalisation1 $480 million Cash2 $67 million Debt2 - 30% Enterprise value $413 million 45% Broker coverage 22% 3% WHSP Australian Institutions Foreign Institutions Retail & Other 1. As at

  6. Slide 6: Sustainability

    Sustainability Commitment to transparency, integrity and sustainability Water and Carbon and Diversity and Biodiversity and Containment Climate Change Inclusion Land Using resources Reducing carbon Building more equal, Planning and delivering efficiently in water, footprint and diverse, fair and pos

  7. Slide 7: Tritton Operations

    Tritton Operations 7

  8. Slide 8: Tritton

    Tritton Improving ore grades and extending mine life Displacing 1.1% Cu from Tritton deeps with: Tritton and Budgerygar ✓ 1.8% Cu ore from Budgerygar (in production)1 ✓ 2.5% Cu and 0.8g/t Au ore from Avoca Tank (in production Q4 FY23)1 ✓ Extending Tritton to high grade ore only ✓ Extensions at Murra

  9. Slide 9: Avoca Tank development

    Avoca Tank development New high-grade intersections • Resource definition drilling1 within initial production block returned high grade intersections: ‒ 10.7m at 5.48% Cu, 0.3g/t Au (10.72) ‒ 6.0m at 0.36% Cu, 2.78g/t Au (6.02) • Massive sulphides also intersected 180m below mineral resource in hole

  10. Slide 10: Constellation deposit

    Constellation deposit New potential mine • Located 45km northeast of the Tritton plant • Mineral Resource1 of 6.7Mt at 1.85% Cu and 0.58g/t Au ‒ Containing 123kt copper and 125koz gold ‒ Approximately 3.1Mt of oxide, supergene and primary mineralisation is open pittable • Resource extended from near

  11. Slide 11: Tritton exploration pipeline

    Tritton exploration pipeline • Highly endowed region and 2,330km2 tenement package • 750kt copper already discovered and produced from deposits south of the Mitchell Highway • EM survey completed on northern tenements – 14 priority targets identified • Drill testing 5M7 prospect • Resource update at

  12. Slide 12: Cracow Operations

    Cracow Operations 12

  13. Slide 13: Cracow

    Cracow High-grade gold mine with long history of reserve replacement ✓ Mature operation with high quality infrastructure ✓ Declining grades in the Western Vein Field ✓ Reinvesting cash flows in exploration ✓ Golden Plateau is the focus area ✓ Southern Vein Field underexplored due to thick cover and

  14. Slide 14: Golden Plateau exploration

    Golden Plateau exploration • Maiden Mineral Resource estimate released in January 20231 of 620kt at 3.1g/t Au and 15g/t Ag • Contained metal of 62koz Au and 300koz Ag • Significant potential to increase the resource with additional drilling • Conceptual mining studies have commenced on open pit and

  15. Slide 15: Jaguar Operations

    Jaguar Operations % We are ore oe 15

  16. Slide 16: Jaguar Operations

    Jaguar Operations Consistent, polymetallic underground mine ✓ Investing capital to extend Bentley operations at depth ✓ New Turbo lens discovered in 2021 to extend Bentley mine life ✓ Other high grade exploration targets at Bentley and regionally including the fully permitted Triumph project ✓ Inves

  17. Slide 17: Bentley exploration potential

    Bentley exploration potential Significant resource growth potential at depth • Bentley deposit open along strike and down plunge • Turbo lens resource increased to 1.26Mt with drilling outside the resource envelop demonstrating potential for further extensions • Java Deeps target has also returned h

  18. Slide 18: Extension of Turbo lens

    Extension of Turbo lens • Turbo resource updated to 1.26Mt at 1.82% Cu, 8.5% Zn, 0.72g/t Au and 47g/t Ag1 • Majority of resource in Indicated status • Increased tonnage by 23% and contained zinc metal by 37% • Strike length doubled to 400m • Deposit is open along strike and down plunge • Drilling ha

  19. Slide 19: North Queensland Operations

    North Queensland Operations 19

  20. Slide 20: North Queensland

    North Queensland Cash generative copper-gold mine and large exploration portfolio ✓ Harvesting cash from Mt Colin mine to fund other group capital developments ✓ Low cost toll treatment options with regional mills ✓ Potential underground operation at Barbara ✓ Large tenement package in highly prospe

  21. Slide 21: North Queensland growth projects

    North Queensland growth projects Near-term potential at Barbara and large regional portfolio Barbara • Open pit mining finished in Dec 2020 • Mineralisation extends below current pit and is open at depth • Mining study on a potential underground operation of similar scale to Mt Colin • Drill program

  22. Slide 22: Stockman Project

    : Stockman Project Wi" Nenic \ We are (Aeris

  23. Slide 23: Stockman

    Stockman High-grade, long life, polymetallic development project ✓ Mining Lease – approved ✓ Infrastructure Lease for tailings dam – approved ✓ Project work plan – approved ✓ High-grade, +10 year Ore Reserve of 9.6Mt at 2.9% CuEq (recovered)1 ✓ Significant onsite road infrastructure already in place

  24. Slide 24: Stockman

    Stockman Wilga mine targeting ~200ktpa Advanced technical studies • Underground mining operations at the Wilga and Currawong deposits targeting 1Mtpa • Conventional flotation plant to produce copper and zinc concentrates with significant precious metals by-products Currawong mine targeting ~800ktpa

  25. Slide 25: Stockman

    Stockman Clear path to development Production (kt, CuEq) 1,2 40 • Feasibility study underway and due for completion FY23 35 • Opportunities to extend mine life with Bigfoot 30 and Eureka resources 25 • Highly prospective tenements with over 50 20 drill targets identified 15 10 5 0 1 2 3 4 5 6 7 8 9

  26. Slide 26: The future

    L We are Aeris 26

  27. Slide 27: FY23 plans – an exciting year ahead!

    FY23 plans – an exciting year ahead! Tritton Jaguar Stockman • 19- 23 kt Cu • 3 – 5 kt Cu • Complete feasibility study • 5 – 7koz Au • 24 – 29kt Zn • Focus on community engagement and • Emphasis on cost control • 5 – 7koz Au securing outstanding secondary permits • Bring Avoca Tank mine into product

  28. Slide 28: Thank you

    Thank you Are there any questions? Aeris Resources Limited Level 2, HQ South Tower 520 Wickham Street Fortitude Valley Brisbane QLD, 4006 +61 7 3034 6200 Facebook | facebook.com/aeristritton/ Linkedin | linkedin.com/company/aeris-resources-limited/ info@aerisresources.com.au Public Relations Madelei

  29. Slide 29: Appendix

    Aeris Resources Appendix

  30. Slide 30: Highly experienced board and management

    Highly experienced board and management Board of Directors Andre Labuschagne – Executive Chairman Sylvia Wiggins – Non-Executive Director Robert Millner – Non-Executive Director Experienced mining executive with a career A senior executive and investment banker with a Chairman of WHSP. Extensive exp

  31. Slide 31: Group Mineral Resources (30 June 2022)

    Group Mineral Resources (30 June 2022) Grade Contained Metal Project Category Tonnes ('000) % Cu % Zn g/t Au g/t Ag kt Cu kt Zn koz Au koz Ag Tritton Measured 2,311 1.2 - 0.1 2.7 27 - 6 201 Indicated 11,252 1.4 - 0.3 4.3 158 - 111 1,564 Inferred 9,334 1.7 - 0.4 4.0 159 - 119 1,188 Total 22,896 1.5 -

  32. Slide 32: Group Ore Reserves (30 June 2022)

    Group Ore Reserves (30 June 2022) Grade Contained Metal Project Category Tonnes ('000) % Cu % Zn g/t Au g/t Ag kt Cu kt Zn koz Au koz Ag Tritton Proved 1,085 1.2 - 0.1 2.4 13 - 2 84 Probable 3,717 1.4 - 0.3 3.5 53 - 41 420 Total 4,802 1.4 - 0.3 3.3 67 - 43 504 Cracow Proved 199 - - 4.0 - - - 26 - Pr

  33. Slide 33: Copper equivalent calculation

    Copper equivalent calculation Copper Equivalent Calculation In this presentation, production is presented on a recovered CuEq metal produced basis and AISC costs are presented on a payable CuEq metal Recovery Factors by Operation FY21 FY22 FY23 LOMP sold basis. Recovery Factor Zinc Tritton % Recover

Aeris Resources — Bell Potter Unearthed Conference 2023 on 6ix