West Wits Mining Limited · ASX:WWI

West Wits Mining — Investor Presentation (July 2025)

23 slides from West Wits Mining's investor presentation, July 2025

  1. Slide 1: West Wits Mining – Hong Kong Investor Presentation July 2025

    WEST WITS MINING SOUTH AFRICA | NEAR-TERM GOLD PRODUCER | ASX:WWI HONG KONG INVESTOR PRESENTATION – JULY 2025 Qala Shallows, Witwatersrand Basin Project, Gauteng ASX:WWI COPYRIGHT ©2025 ALL RIGHTS RESERVED Mining District, Johannesburg, South Africa

  2. Slide 2: Disclaimer

    DISCLAIMER FORWARD-LOOKING STATEMENTS The production target and financial forecasting reported under the Qala Shallows Definitive Feasibility Study (DFS) contain inferred mineral resources. The directors confirm that it is reasonable to include these inferred This presentation includes “forward-look

  3. Slide 3: Why invest in West Wits

    Why invest in West Wits Significant gold resource in the WBP – Mineral Resource Estimate WBP - Project 200 - significant growth Witwatersrand Basin Project (WBP) 5Moz Gold opportunity aimed to produce South Africa (65% measured & indicated categories)1 200 000oz Gold per annum Qala Shallows (Stage 1

  4. Slide 4: Corporate Snapshot

    CORPORATE SNAPSHOT Transforming into mid-tier gold producer CAPITAL STRUCTURE (ASX:WWI) Shares on issue 3.3B Unlisted Options (exercise price range 2.2c – 25c) 124M New options exercise price 3.85c (pending shareholder approval) 326M Performance Rights 7.5M Convertible Notes 11 Market Capitalisation

  5. Slide 5: Board & Executive Team

    BOARD & EXECUTIVE TEAM ASX-experienced Mining Eng. with Chartered Accountant commercial lawyer Geophysics and MBA. and Associate Member of with extensive Production experience in the Governance Institute involvement in assisting conventional narrow of Australia with and advising publicly tabular und

  6. Slide 6: Qala Shallows Gold Project

    QALA SHALLOWS GOLD PROJECT The Qala Shallows Gold Project (South Africa) comprises a low-risk, shallow underground mine utilising contract mining with ore treated at an existing operational plant HIGH TECHNICAL STANDARD ▪ Historic mine works with existing shafts & well-understood rock engineering ▪

  7. Slide 7: Senior Debt Facility Overview

    SENIOR DEBT FACILITY OVERVIEW ~USD 50M DEBT SECURED WITH TIER-1 SOUTH AFRICAN FINANCIAL INSTITUTIONS ▪ Senior debt syndicated loan facility of up to ZAR 902.5 million (~USD 50M @ ZAR18.0/USD) (Facility). ▪ Final Credit Approval received from Industrial Development Corporation (IDC) & Absa Bank (Absa

  8. Slide 8: Qala Shallows - DFS Financial Model & Funding

    QALA SHALLOWS - DFS FINANCIAL MODEL & FUNDING2 KEY FINANCIAL METRICS – DFS Base Case US$2,850/oz GOLD PRICE GOLD PRICE DFS - Financial Evaluation DEFINITIVE FEASIBILITY STUDY US$2,850/oz US$3,850/oz ▪ Post-Tax Free Cashflow of US$983m over Life-of-Mine Peak Funding US$44m US$31m ▪ AISC cost in lowes

  9. Slide 9: WWI – Gold Resources

    WWI – GOLD RESOURCES GLOBAL MINERAL RESOURCE ESTIMATE (JORC 2012)1 Category Tonnage (Mt) Grade (g/t) Content (oz) Measured 10.07 4.60 1 595 000 Indicated 12.29 4.19 1 700 000 Measured & 23.00 4.45 3 295 000 Indicated Inferred 10.49 5.10 1 730 000 Total 33.49 4.66 5 025 000 ▪ Significant global Miner

  10. Slide 10: WBP – Location & Growth Potential

    WBP – LOCATION & GROWTH POTENTIAL SANDTON CBD 5. BIRD REEF CENTRAL (BRC) Gold & Uranium JOHANNESBURG CBD ▪ 2022 Scoping Study identified Five (5) distinct development stages for the Witwatersrand Basin Project with Stages 1 – 4 Gold Projects for a 27yr Life of Mine.6 ▪ Qala Shallows is Stage 1 of th

  11. Slide 11: WBP - MRE & Ore Reserve Growth

    WBP - MRE & ORE RESERVE GROWTH 6 5 0.35 GOLD OUNCES (MILLION) 0.38 WBP tenement area previously held by DRD Gold 4 0.29 which had a Historical MRE 1.51 1.49 - declared (2000 ASX Report) of - 0.28 1.37 12.8Moz at 4.6g/t Gold under 3 1.42 0.60 the previous JORC Code3. 1.21 1.44 1.42 2 1.38 1.31 WWI ha

  12. Slide 12: Qala Shallows - Mining Inventory & Ore Reserve

    QALA SHALLOWS - MINING INVENTORY & ORE RESERVE2 RUN OF MINE INVENTORY (INCLUSIVE OF ORE RESERVES) 2 RUN OF MINE INVENTORY Mineral Resource Tonnage Grade Content Content Estimate Category (Mt) (g/t) (kg) (oz) ▪ 1.03Moz Gold at 3.0g/t, inclusive of Ore Reserves ▪ Ore Reserves – 4.6Mt at 2.60g/t for 38

  13. Slide 13: Qala Shallows - Mining Plan

    QALA SHALLOWS - MINING PLAN Trackless development with conventional stoping – tried and tested ▪ Ore body is accessed from surface via a decline system developed from the existing Qala adit box cut ▪ The decline is located centrally in the mining area and the K9B footwall ▪ Stopes will be accessed v

  14. Slide 14: Qala Shallows - Permanent Surface Layout

    QALA SHALLOWS - PERMANENT SURFACE LAYOUT2 ▪ Critical infrastructure complete ▪ Contracts finalised and being executed ▪ All permits and power/water in place ▪ Mobilisation commenced MINE EXTENSION June 2025 Scoping Study Stage 2 – Main Reef ▪ Pre-production works Stage 3 – Bird Reef East Stage 4 – Q

  15. Slide 15: Qala Shallows - Production Schedule

    QALA SHALLOWS - PRODUCTION SCHEDULE GOLD PRODUCTION Updated DFS completed in July 2025 by Bara Consulting2 • DFS completed on first stage of development to deliver 944,000oz gold at AISC of US$1,289/oz • Initial production will provide a robust 30,000 tonne ore stockpile to facilitate delivery of 15

  16. Slide 16: Targeting First Gold Pour Q4 2025

    TARGETING FIRST GOLD POUR Q4 2025 2024 2025E 2026E 2027E 2028E H1 H2 H1 H2 H1 H2 H1 H2 Progress completion of Project Finance package Mobilise mining contractors Commission underground mine development Build 30,000t stockpile & start deliveries to Sibanye First gold pour EPCM contract works – major

  17. Slide 17: Key Milestones Driving Value

    KEY MILESTONES DRIVING VALUE Milestones Catalysts 2021✓ Mining Right granted with 3.5Moz gold MRE8 ❖ Progress completion of Project Finance package ✓ Stage 1 DFS confirms 278koz Reserves & AISC US$1,144/oz1 (Aug-25) ✓ MRE increased to 4.3Moz Gold7 ❖ Increase project ownership to 74% via BEE Buy-Back

  18. Slide 18: Mobilisation at Qala Shallows is Underway

    MOBILISATION AT QALA SHALLOWS IS UNDERWAY ASX:WWI PAGE | 18

  19. Slide 19: WBP Environmental, Social & Governance (ESG)

    WBP ENVIRONMENTAL, SOCIAL & GOVERNANCE (ESG) ENVIRONMENTAL STEWARDSHIP & BIODIVERSITY CONSERVATION ▪ Complete underground operation: Low noise and dust levels ▪ Small footprint & surface infrastructure: Low rehabilitation liability & minimal impact on surrounding environment ▪ Efficient water use mo

  20. Slide 20: westwitsmining.com | info@westwitsmining.com

    Qala Shallows Box Cut CHIEF EXECUTIVE OFFICER INVESTOR RELATIONS SOUTH AFRICA AUSTRALIA Rudi Deysel Keith Middleton Unit 8A, Sifon Industrial Park Level 6, 400 Collins Street 279 Sifon Street, Robertville Melbourne, Victoria rdeysel@westwitsmining.com keith@middletoncorporate.com.au Roodepoort Austr

  21. Slide 21: Experienced Management Team

    EXPERIENCED MANAGEMENT TEAM Mining Engineer with BSc Chemical experience managing Engineering, PGDip large, diverse teams in Industrial Engineering, mining operations, from and MBA. Experience shallow underground spans multiple business mining to deep level gold functions, including mining, operatio

  22. Slide 22: Appendix 1: Ore Reserve & Mineral Resource Estimate Statements

    APPENDIX 1: ORE RESERVE & MINERAL RESOURCE ESTIMATE STATEMENTS Table 1: WBP (JORC) Ore Reserve2 Declared Ore Reserve of 4.6MT at 2.6g/t for 383,934oz Gold2 Ore Reserve Notes: 1. No Inferred Mineral Resources are included in the Ore Reserves. ORE RESERVE STATEMENT FOR QALA SHALLOWS (JORC 2012) 2. The

  23. Slide 23: Appendix 2 - References

    APPENDIX 2 - REFERENCES 1. The original report was “WBP Global MRE Increases with New Prospecting Right” which was issued with consent of the Competent Person, Mr Hermanus Berhardus Swart. The report was released to the ASX on 16 December 2024 and can be found on the Company’s website (https://westw

West Wits Mining — Investor Presentation (July 2025) on 6ix