16 slides from Colibri Resource's technical presentation, September 2008
Slide 1: The Leon Project
The Leon Project Sonora, Mexico 2007/2008 Drilling Highlights September 2008
Slide 2: Leon Project Location
Leon Project Location PHOENIX s Mesquite 3 Picacho $Q) & Arkerican Giri * + ‘@MEXICALI Quivac Sierra Pinta $Q\La Choya \ Ajucinacion Ventana Canna SR" 52 54 San Javier LaHerrahus 4S a Las Norias ° . 2 i ° cae ap Colibri Project 7 sh SrSea cy “on EtoAS! Tajitos $Q El Chanate ° =) a 4 feo ¢f Santa Ger
Slide 3: Leon Project - Claim Map and 2007-2008 Drill Targets
Leon Project - Claim Map and 2007-2008 Drill Targets
Amarillas Zone - Drill Section AM1-AM1’ - LEDH-01/02 Zn Assays
Slide 7: Amarillas Zone - Drill Section AM2-AM2' - LEDH-01/02 Ag
Amarillas Zone - Drill Section AM2-AM2’ - LEDH-01/02 Ag Assays
Slide 8: Fortuna Zone – Drill Section FO1-FO1' with Mo and Cu
Fortuna Zone – Drill Section FO1-FO1’ - LEDH 19 with Mo and Cu Assays
Slide 9: Azul North Zone – Drill Section AZ1-AZ1' - LEDH 15-18 With Mo
Azul North Zone – Drill Section AZ1-AZ1’ - LEDH 15-18 With Mo Assays
Slide 10: Azul North Zone – Drill Section AZ1–AZ1' - LEDH 15-18 With Cu
Azul North Zone – Drill Section AZ1–AZ1’ - LEDH 15-18 With Cu Assays
Slide 11: Azul Zone – Drill Section AZ2-AZ2' - LEDH 17/18 With Mo and Re
Azul Zone – Drill Section AZ2-AZ2’ - LEDH 17/18 With Mo and Re Assays
Slide 12: Azul East Zone – Percussion Drill Section AZ3-AZ3' with Mo
Azul East Zone – Percussion Drill Section AZ3-AZ3’ with Mo Assays
Slide 13: Azul Zone – Outline Of Molybdenum Mineralization
Azul Zone – Outline Of Molybdenum Mineralization Projected To Surface From 2008 Core and Percussion Drilling
Slide 14: Leon Project – Molybdenum Mineralization From 2008 Drilling and Mo In Soil Anomaly
Leon Project – Molybdenum Mineralization From 2008 Drilling and Mo In Soil Anomaly
Slide 15: Geologic Cross-Section Through Leon Molybdenum Mineralization to El Creston
Geologic Cross-Section Through Leon Molybdenum Mineralization and Soil Anomaly(> 40 ppm Mo) To El Creston Molybdenum Deposit
Slide 16: SUMMARY – 2008 LEON Project
SUMMARY – 2008 LEON Project • Near surface molybdenum mineralization in Azul Zone that includes 72 meters of 0.195% Mo within a 211 meter interval of 0.082% Mo defined by 2008 core drilling (LEDH-18) • Drilled footprint of Azul molybdenum mineralization currently extends a minimum of 140 meters widt
Source: Internet Archive copy of colibriresource.com