Colibri Resource Corporation · TSXV:CBI
Colibri Resource — Investor Presentation (July 2018)
24 slides from Colibri Resource's investor presentation, July 2018

Slide 1: Developing Gold Projects in the Prolific Sonora Gold Belt, Mexico
T S X Ve n t u r e - C B I July, 2 0 1 8 DEVELOPING GOLD PROJECTS I N T H E P R O L I F I C S O N O R A G O L D B E LT - M E X I C O

Slide 2: Forward Looking Statements
Forward Looking Statements This presentation is strictly confidential and must not be copied, distributed, circulated or disseminated without the express written consent of the Corporation. This presentation does not constitute an “offering memorandum” as such term is defined under Canadian securiti

Slide 3: Leadership Team
T S X Ve n tu r e - C B I Leadership Team Management experienced in Sonora, epithermal gold deposits and putting mines into production. Chairman/CEO/ Founder and Former Chairman of both Major Drilling International (TSX: MDI) and the Beaver Brook Ronald Goguen, Sr. President Antimony Mine Brian Craw

Slide 4: Colibri Resource Corporation at a Glance
Colibri Resource Corporation at a Glance QUICK FACTS • Trades: TSX.V: CBI | FSE: 2CO • Property Portfolio Focused on Sonora, Mexico • Led by an experienced Management Team and Board who have Found, Developed, and Managed Producing Mines CORPORATE STRUCTURE • 52.9 million shares outstanding • 77.5 mi

Slide 5: Flagship Property: The Pilar Gold Project
T S X Ve n tu r e - C B I Flagship Property: The Pilar Gold Project Acquisition Structure (TSX-V Approved on July 25, 2017) • Colibri issued 24,242,424 shares at $0.165 per share to purchase project ($4,000,000) • Asset held in wholly own Mexican subsidiary company • 12 km NE of Suaqui Grande, Sonor

Slide 6: Highly Fractured Rock
Pilar Gold Property • 105 hectares • 100% Ownership, No NSR • Mineralized zone 1,200m x 625m x 100m • 3 Mineralized Zones drill tested and remain open in several directions • Main Zone, North Hill, 4-Trench • Several untested targets • Main Zone: Grade 1.9 g/t Au - (Average recovery: 92%) • Previous

Slide 7: Pilar Gold Property – Work Completed to Date
Pilar Gold Property – Work Completed to Date Significant Amount of Data Collected on Pilar Property) N • 17,700m Drilling (Core & RC) • 2650m of Channel/Trench Sampling/Mapping North Hill • 739 Rock-chip Samples & 87 Soil Samples (mapped) • Standard Cyanide Bottle Roll Testing Completed • 3 tests –

Slide 8: Sweet Spot – Western Side of the Main Zone
T S X Ve n tu r e - C B I Sweet Spot – Western Side of the Main Zone Hole P-9b: 9.0m @ 10.16 g/t Au Hole 13-15: 66.0m @ 0.94 g/t Au 4 Trench Zone North Hill Hole JES-12: 41.01m @ 1.31 g/t Au Hole J-7: 2.55m @ 7.91 g/t Au Hole Q-8b: 13.5m @ 9.64 g/t Au Main Zone Hole JESP-12-4: 21.30m @ 0.84 g/t Au;

Slide 9: Channel & Chip Sampling
T S X Ve n tu r e - C B I Channel & Chip Sampling Channel Sampling Channel Date Sampling Channel Sampling Results (Meters) As high as: Santa Catalina: Channel 28.0 g/t over 6m Sampling Campaign #1 Late 1995-1996 1,980 7.72 g/t over 9m 4.4g/t over 12m Santa Catalina: Channel As high as: Sampling Camp

Slide 10: Projected Mineralized Structure - Gold in Soils
Highlighted: Projected Mineralized Structure - Gold in Soils (g/t) 1,200m X 625m North Hill 4 Trench Zone 2.09 Main Zone 1.36 Historic shaft – surface sampled 2.48 g/t Au & 1.23 g/t Au 1.565 0.869 10

Slide 11: Phase 1 - 2018 Drilling Campaign
Hole-ID From (m) To (m) Length (m) Au (gpt) Hole ID From To Length Au (gpt) Ag (gpt) Phase 1 - 2018 Drilling Campaign JES-18-1 JES-18-2 incl. 133.50 19.50 24.00 135.00 52.50 28.50 1.50 33.00 4.50 0.80 0.15 0.65 JES-18-5 incl JES-18-5 6.00 7.50 31.50 16.50 9.00 34.50 10.50 1.50 3.00 0.28 1.43 0.41 5.

Slide 12: Historic Drilling Campaigns
Historic Drilling Campaigns DRILL CAMPAIGN DATE RC DRILLING (METERS) BEST INTERCEPT RESULTS S-10: 16.5m of 53.47 g/t Au and 53.4 g/t Ag Santa Catalina: Drill Campaign #1 July 1996 2,900+ Q-8b: 13.5m of 9.64 g/t Au and 7.2 g/t Ag S-11: 1.5m of 6.70 g/t Au and 56.6 g/t Ag P-9b: 9.0m of 10.16 g/t Au an

Slide 13: Metallurgical Testing
T S X Ve n tu r e - C B I Metallurgical Testing Excellent Gold Recoveries Hermosillo-based Laboratorio Technologico de Metalurgia LTM S.A. de C.V (LTM) Was Commissioned to Complete Three Preliminary Metallurgical Tests BOTTLE ROLL TEST 1 BOTTLE ROLL TESTS 2 AND 3 • 5 samples Taken From the Width of

Slide 14: Pilar Gold – Path Forward
Pilar Gold – Path Forward Increased Scale & Fast Track to Production Initiatives Underway. Corporate Objectives • Raise Drilling Campaign Funds Via Private Placement for Phase 2 drilling campaign (up to 70 holes) Technical Objectives • Verify Lundin’s estimated Mineralized Structured Zone: 1,200m x

Slide 15: Pitaya Property (JV Partnership with AEM)
Pitaya Property (JV Partnership with AEM) OVERVIEW Commodity: Gold (Au) Size: 6564 hectares (65.64 Km²) Stage: Advanced Exploration Ownership: 24.45% (JV Partner Agnico Eagle: 75.55%) Location: Sonora State, Mexico Reserves: No calculation PLIEGUE NORTH ZONE Nearby Exploration: Fresnillio - Tajitos

Slide 16: Pitaya Property
T S X Ve n tu r e - C B I Pitaya Property Extensive work completed on Project: Drilling: 15,322 m Drilling 2017: 7,642 m (27 holes) Chip & Soil Samples: 2,708 + Ground Mag / SRK Mapping & Modelling Total Expenditures: $6.26 million USD Expended in 2017: $1.36 million USD Pliegue North Pliegue SE SFr

Slide 17: 2017 Pitaya JV Drilling Results
36 36 36 36 36 36 Fresnillo PLC claims 2017 Pitaya 29 34 00 PTY-17-017 30 40 50 60 2.0 m @ 0.32 Au g/t, From 58 m 70 80 Riverside Resources claims 0 PTY-17-001 1.0 m @ 0.60 Au g/t, From 91 m 0.5 m @ 56.2 Ag g/t, 1.39 Cu % From 6.2 m JV Drilling 00 PTY-17-009 00 00 0.9 m @ 0.69 Au g/t,00 9.0 m @ 0.20

Slide 18: Pitaya Property – Neighboring Exploration
Pitaya Property – Neighboring Exploration • Exploration by Fresnillo PLC – Eastern Border In Fresnillo’s 2017 Annual Report, a resource of 400,000 + oz Au was released with the mineralized zone open along strike. A cut-off grade 0.3 g/t Au was used in the calculation. Regional magnetics depicting th

Slide 19: Evelyn Gold Property
Evelyn Gold Property High Potential Exploration Opportunity o Acquired in 2008. o 506 hectares - located in northwest Sonora, Mexico o Easy access: 150 kilometres northwest of the capital city, Hermosillo o Heavy artisanal placer mining activity on property o 30km from La Herradura Gold Mine (Fresni

Slide 20: Path Forward – 2018/2019
T S X Ve n tu r e - C B I Path Forward – 2018/2019 Corporate Objectives • Raise capital to drill Phase 2 (7,000 m) at the Pilar Gold Project • Prepare resource estimate • Continue to drill and define resource at Pitaya • Begin systematic exploration of Evelyn Project Flagship Project: Joint Venture

Slide 21: Pilar Drill Campaign Photos
T S X Ve n tu r e - C B I Pilar Drill Campaign Photos From Surface 41m of 1.31 g/t Au Drilling Activity on Pilar Highly Altered Rock in 4-Trench Area CGR Team at Pilar Checking The Dip Ready at the Drill Pad 21

Slide 22: Pilar Drill Campaign Photos
Pilar Drill Campaign Photos Hole 13-5 Starting A New Drill Hole Rock Chips Laid Our For Viewing Crew At Work Bagged and Numbered Samples Bagging a Sample 22

Slide 23: Share Structure
Share Structure A S a t : J u l y 1 st, 2 0 1 8 Ticker Symbol TSX-V: CBI Total Shares Outstanding 52,902,986 2,667,166 25c until Nov 3, 2018 205,373 25c until Nov 3, 2018 Warrants: 4,265,000 25c until Sept 6,2019 12,120,980 15c until March 15, 2023 252,400 10c until March 15, 2019 550,000 - 15c unti

Slide 24: Thank You!
THANK YOU! Colibri Resource Corporation TSX Venture – CBI Suite 700-105 Englehart Street Phone: (506) 383-4274 Dieppe, New Brunswick E1A 8K2 Email: info@colibriresource.com 24
Source: Internet Archive copy of colibriresource.com
More decks from Colibri Resource Corporation
Investor Presentation (February 2026)16 slides · February 2026
Investor Presentation (December 2019)36 slides · Dec 1, 2019
Investor Presentation (March 2019)30 slides · March 2019
Investor Presentation (March 2011)43 slides · March 2011
Investor Presentation (July 2010)23 slides · July 2010
Technical Presentation (September 2008)16 slides · September 2008