Colibri Resource Corporation · TSXV:CBI

Colibri Resource — Investor Presentation (July 2018)

24 slides from Colibri Resource's investor presentation, July 2018

  1. Slide 1: Developing Gold Projects in the Prolific Sonora Gold Belt, Mexico

    Slide 1: Developing Gold Projects in the Prolific Sonora Gold Belt, Mexico

    T S X Ve n t u r e - C B I July, 2 0 1 8 DEVELOPING GOLD PROJECTS I N T H E P R O L I F I C S O N O R A G O L D B E LT - M E X I C O

  2. Slide 2: Forward Looking Statements

    Slide 2: Forward Looking Statements

    Forward Looking Statements This presentation is strictly confidential and must not be copied, distributed, circulated or disseminated without the express written consent of the Corporation. This presentation does not constitute an “offering memorandum” as such term is defined under Canadian securiti

  3. Slide 3: Leadership Team

    Slide 3: Leadership Team

    T S X Ve n tu r e - C B I Leadership Team Management experienced in Sonora, epithermal gold deposits and putting mines into production. Chairman/CEO/ Founder and Former Chairman of both Major Drilling International (TSX: MDI) and the Beaver Brook Ronald Goguen, Sr. President Antimony Mine Brian Craw

  4. Slide 4: Colibri Resource Corporation at a Glance

    Slide 4: Colibri Resource Corporation at a Glance

    Colibri Resource Corporation at a Glance QUICK FACTS • Trades: TSX.V: CBI | FSE: 2CO • Property Portfolio Focused on Sonora, Mexico • Led by an experienced Management Team and Board who have Found, Developed, and Managed Producing Mines CORPORATE STRUCTURE • 52.9 million shares outstanding • 77.5 mi

  5. Slide 5: Flagship Property: The Pilar Gold Project

    Slide 5: Flagship Property: The Pilar Gold Project

    T S X Ve n tu r e - C B I Flagship Property: The Pilar Gold Project Acquisition Structure (TSX-V Approved on July 25, 2017) • Colibri issued 24,242,424 shares at $0.165 per share to purchase project ($4,000,000) • Asset held in wholly own Mexican subsidiary company • 12 km NE of Suaqui Grande, Sonor

  6. Slide 6: Highly Fractured Rock

    Slide 6: Highly Fractured Rock

    Pilar Gold Property • 105 hectares • 100% Ownership, No NSR • Mineralized zone 1,200m x 625m x 100m • 3 Mineralized Zones drill tested and remain open in several directions • Main Zone, North Hill, 4-Trench • Several untested targets • Main Zone: Grade 1.9 g/t Au - (Average recovery: 92%) • Previous

  7. Slide 7: Pilar Gold Property – Work Completed to Date

    Slide 7: Pilar Gold Property – Work Completed to Date

    Pilar Gold Property – Work Completed to Date Significant Amount of Data Collected on Pilar Property) N • 17,700m Drilling (Core & RC) • 2650m of Channel/Trench Sampling/Mapping North Hill • 739 Rock-chip Samples & 87 Soil Samples (mapped) • Standard Cyanide Bottle Roll Testing Completed • 3 tests –

  8. Slide 8: Sweet Spot – Western Side of the Main Zone

    Slide 8: Sweet Spot – Western Side of the Main Zone

    T S X Ve n tu r e - C B I Sweet Spot – Western Side of the Main Zone Hole P-9b: 9.0m @ 10.16 g/t Au Hole 13-15: 66.0m @ 0.94 g/t Au 4 Trench Zone North Hill Hole JES-12: 41.01m @ 1.31 g/t Au Hole J-7: 2.55m @ 7.91 g/t Au Hole Q-8b: 13.5m @ 9.64 g/t Au Main Zone Hole JESP-12-4: 21.30m @ 0.84 g/t Au;

  9. Slide 9: Channel & Chip Sampling

    Slide 9: Channel & Chip Sampling

    T S X Ve n tu r e - C B I Channel & Chip Sampling Channel Sampling Channel Date Sampling Channel Sampling Results (Meters) As high as: Santa Catalina: Channel 28.0 g/t over 6m Sampling Campaign #1 Late 1995-1996 1,980 7.72 g/t over 9m 4.4g/t over 12m Santa Catalina: Channel As high as: Sampling Camp

  10. Slide 10: Projected Mineralized Structure - Gold in Soils

    Slide 10: Projected Mineralized Structure - Gold in Soils

    Highlighted: Projected Mineralized Structure - Gold in Soils (g/t) 1,200m X 625m North Hill 4 Trench Zone 2.09 Main Zone 1.36 Historic shaft – surface sampled 2.48 g/t Au & 1.23 g/t Au 1.565 0.869 10

  11. Slide 11: Phase 1 - 2018 Drilling Campaign

    Slide 11: Phase 1 - 2018 Drilling Campaign

    Hole-ID From (m) To (m) Length (m) Au (gpt) Hole ID From To Length Au (gpt) Ag (gpt) Phase 1 - 2018 Drilling Campaign JES-18-1 JES-18-2 incl. 133.50 19.50 24.00 135.00 52.50 28.50 1.50 33.00 4.50 0.80 0.15 0.65 JES-18-5 incl JES-18-5 6.00 7.50 31.50 16.50 9.00 34.50 10.50 1.50 3.00 0.28 1.43 0.41 5.

  12. Slide 12: Historic Drilling Campaigns

    Slide 12: Historic Drilling Campaigns

    Historic Drilling Campaigns DRILL CAMPAIGN DATE RC DRILLING (METERS) BEST INTERCEPT RESULTS S-10: 16.5m of 53.47 g/t Au and 53.4 g/t Ag Santa Catalina: Drill Campaign #1 July 1996 2,900+ Q-8b: 13.5m of 9.64 g/t Au and 7.2 g/t Ag S-11: 1.5m of 6.70 g/t Au and 56.6 g/t Ag P-9b: 9.0m of 10.16 g/t Au an

  13. Slide 13: Metallurgical Testing

    Slide 13: Metallurgical Testing

    T S X Ve n tu r e - C B I Metallurgical Testing Excellent Gold Recoveries Hermosillo-based Laboratorio Technologico de Metalurgia LTM S.A. de C.V (LTM) Was Commissioned to Complete Three Preliminary Metallurgical Tests BOTTLE ROLL TEST 1 BOTTLE ROLL TESTS 2 AND 3 • 5 samples Taken From the Width of

  14. Slide 14: Pilar Gold – Path Forward

    Slide 14: Pilar Gold – Path Forward

    Pilar Gold – Path Forward Increased Scale & Fast Track to Production Initiatives Underway. Corporate Objectives • Raise Drilling Campaign Funds Via Private Placement for Phase 2 drilling campaign (up to 70 holes) Technical Objectives • Verify Lundin’s estimated Mineralized Structured Zone: 1,200m x

  15. Slide 15: Pitaya Property (JV Partnership with AEM)

    Slide 15: Pitaya Property (JV Partnership with AEM)

    Pitaya Property (JV Partnership with AEM) OVERVIEW Commodity: Gold (Au) Size: 6564 hectares (65.64 Km²) Stage: Advanced Exploration Ownership: 24.45% (JV Partner Agnico Eagle: 75.55%) Location: Sonora State, Mexico Reserves: No calculation PLIEGUE NORTH ZONE Nearby Exploration: Fresnillio - Tajitos

  16. Slide 16: Pitaya Property

    Slide 16: Pitaya Property

    T S X Ve n tu r e - C B I Pitaya Property Extensive work completed on Project: Drilling: 15,322 m Drilling 2017: 7,642 m (27 holes) Chip & Soil Samples: 2,708 + Ground Mag / SRK Mapping & Modelling Total Expenditures: $6.26 million USD Expended in 2017: $1.36 million USD Pliegue North Pliegue SE SFr

  17. Slide 17: 2017 Pitaya JV Drilling Results

    Slide 17: 2017 Pitaya JV Drilling Results

    36 36 36 36 36 36 Fresnillo PLC claims 2017 Pitaya 29 34 00 PTY-17-017 30 40 50 60 2.0 m @ 0.32 Au g/t, From 58 m 70 80 Riverside Resources claims 0 PTY-17-001 1.0 m @ 0.60 Au g/t, From 91 m 0.5 m @ 56.2 Ag g/t, 1.39 Cu % From 6.2 m JV Drilling 00 PTY-17-009 00 00 0.9 m @ 0.69 Au g/t,00 9.0 m @ 0.20

  18. Slide 18: Pitaya Property – Neighboring Exploration

    Slide 18: Pitaya Property – Neighboring Exploration

    Pitaya Property – Neighboring Exploration • Exploration by Fresnillo PLC – Eastern Border In Fresnillo’s 2017 Annual Report, a resource of 400,000 + oz Au was released with the mineralized zone open along strike. A cut-off grade 0.3 g/t Au was used in the calculation. Regional magnetics depicting th

  19. Slide 19: Evelyn Gold Property

    Slide 19: Evelyn Gold Property

    Evelyn Gold Property High Potential Exploration Opportunity o Acquired in 2008. o 506 hectares - located in northwest Sonora, Mexico o Easy access: 150 kilometres northwest of the capital city, Hermosillo o Heavy artisanal placer mining activity on property o 30km from La Herradura Gold Mine (Fresni

  20. Slide 20: Path Forward – 2018/2019

    Slide 20: Path Forward – 2018/2019

    T S X Ve n tu r e - C B I Path Forward – 2018/2019 Corporate Objectives • Raise capital to drill Phase 2 (7,000 m) at the Pilar Gold Project • Prepare resource estimate • Continue to drill and define resource at Pitaya • Begin systematic exploration of Evelyn Project Flagship Project: Joint Venture

  21. Slide 21: Pilar Drill Campaign Photos

    Slide 21: Pilar Drill Campaign Photos

    T S X Ve n tu r e - C B I Pilar Drill Campaign Photos From Surface 41m of 1.31 g/t Au Drilling Activity on Pilar Highly Altered Rock in 4-Trench Area CGR Team at Pilar Checking The Dip Ready at the Drill Pad 21

  22. Slide 22: Pilar Drill Campaign Photos

    Slide 22: Pilar Drill Campaign Photos

    Pilar Drill Campaign Photos Hole 13-5 Starting A New Drill Hole Rock Chips Laid Our For Viewing Crew At Work Bagged and Numbered Samples Bagging a Sample 22

  23. Slide 23: Share Structure

    Slide 23: Share Structure

    Share Structure A S a t : J u l y 1 st, 2 0 1 8 Ticker Symbol TSX-V: CBI Total Shares Outstanding 52,902,986 2,667,166 25c until Nov 3, 2018 205,373 25c until Nov 3, 2018 Warrants: 4,265,000 25c until Sept 6,2019 12,120,980 15c until March 15, 2023 252,400 10c until March 15, 2019 550,000 - 15c unti

  24. Slide 24: Thank You!

    Slide 24: Thank You!

    THANK YOU! Colibri Resource Corporation TSX Venture – CBI Suite 700-105 Englehart Street Phone: (506) 383-4274 Dieppe, New Brunswick E1A 8K2 Email: info@colibriresource.com 24

Source: Internet Archive copy of colibriresource.com

More decks from Colibri Resource Corporation

All 7 Colibri Resource decks