Colibri Resource Corporation · TSXV:CBI
Colibri Resource — Investor Presentation (March 2019)
30 slides from Colibri Resource's investor presentation, March 2019

Slide 1: Delivering Value Through Exploration
Delivering Value Through Exploration… T S X Ve n t u r e - C B I March 2019 Corporate Presentation

Slide 2: Forward Looking Statements
Forward Looking Statements This presentation is strictly confidential and must not be copied, distributed, circulated or disseminated without the express written consent of the Corporation. This presentation does not constitute an “offering memorandum” as such term is defined under Canadian securiti

Slide 3: Introduction
Introduction Sonora State, Mexico QUICK FACTS ➢ Trades: TSX.V: CBI | FSE: 2CO ➢ Property Portfolio Focused on Sonora, Mexico ➢ Led by an Experienced Management Team and Board who have Found, Developed, and Managed Producing Mines CORPORATE STRUCTURE ➢ 59.1 million shares outstanding ➢ 86.6 million s

Slide 4: Why Mexico? Why Sonora?
Why Mexico? Why Sonora? 1. Mexico - 8th largest producer of gold globally at 125 million metric tons – (1st in silver production) 2. Mexico - Politically stable country – Mining friendly (approximately 4% of GDP) 3. Well Endowed Geologically – Sonora State represents the largest share of annual gold

Slide 5: Pilar Gold Property
Pilar Gold Property Suaqui Grande Area, Sonora

Slide 6: Pilar Gold Property
Pilar Gold Property Moderate / Advanced Exploration • 12 km NE of Suaqui Grande, Sonora, Mexico • 100% owned (no royalties) • Near Surface Mineralization • Open Pit Potential, Oxidized, Heap Leach Potential, Low Sulfidation, Highly Fractured, Epithermal Mineralization Focus of Property Gold Explorat

Slide 7: Pilar: Exploration to Date
Pilar: Exploration to Date • Mineralized zone - 1,200m x 625m • 3 Mineralized Zones - drill tested and remain open on trend and at depth • Average metallurgical recovery: 92% (3 x 72 hour bottle roll tests) • 17,700m cumulative Drilling (Core & RC) • 2,650m of Channel/Trench Sampling • Trench sample

Slide 8: Pilar: Trenching and Soil Samples
Pilar: Trenching and Soil Samples Trench Sample Highlights Sample in Meters Grade Au (g/t) 4 Trench Zone 6 28 9 7.72 12 4.4 North Hill 3 55.4 Zone Main Zone Main Zone Trench work Trench work Guadaloupana Claim Metallurgical Recovery 3 Test Average : La Sonora Claim 92% Gold in Soil Survey – La Sonor

Slide 9: Pilar: Historic Drilling Highlights
Pilar: Historic Drilling Highlights 16.5m @53.4 g/t Au 40.5m @1.31 g/t Au 25.5m @1.07 g/t Au 66m @0.94 g/t Au 13.5m @ 8.92 g/t Au 9m @ 10.16 g/t Au 9m @ 8.14 g/t Au 61.5m @ 0.75 g/t Au 3m @ 5.4 g/t Au 40.5m @ 0.73 g/t Au Topographic View of TSX Venture: CBI North Hill and Main Zone 9

Slide 10: Pilar: Historic Drilling Highlights (continued)
Pilar: Historic Drilling Highlights (continued) Hole ID Intercept (m) Results (g/t) Operator Hole ID Intercept (m) Results (g/t) Operator S-10 16.5 53.47 SCM JES-18-03 13.5 5.64 CBI Q-8b 13.5 9.64 SCM incl. 9 8.16 CBI P-8 15 1.06 SCM incl. 1.5 33.4 CBI P-9b 9 10.16 SCM JES-18-04 28.5 0.57 CBI N-8c 4

Slide 11: Pilar: Going Forward
Pilar: Going Forward ➢ Advanced Modeling ➢ Resource Infill Drilling ➢ Exploration Drilling ➢ 43-101 Compliant Resource Calculation ➢ Preliminary Economic Assessment ➢ Potential Open Pit Heap Leach Operation TSX Venture: CBI 11

Slide 12: Evelyn Gold Property
Evelyn Gold Property Caborca Area, Sonora

Slide 13: Evelyn Gold Property
Evelyn Gold Property Early Stage Exploration High Potential Exploration Opportunity • Acquired in 2008 • 506 hectares - located in northwest Sonora, Mexico • Easy access: 150 kilometres northwest of the capital city, Hermosillo Evelyn Pitaya JV • “Great Address!” • 30km from La Herradura Gold Mine (

Slide 14: Evelyn: Structure & Mineralization
Evelyn: Structure & Mineralization • SSW to NNE trending Quartz Vein (exposed) at saddle measures over 130m at surface • 80m sampled over vein averages over 10 g/t Au – vein averages 1m to 3m wide TSX Venture: CBI NW trending Structure - (A typical orientation for gold deposits in NW Sonora) 14

Slide 15: Evelyn: Going Forward
Soil Sample Map *Soil Samples >100 ppb are significant in NW Sonora where cut off grades View from top of Saddle looking NE along quartz vein. avg. 0.25 Strong soil anomalies are to the NE. to 0.3 ppm Noche Buena (Fresnillo) Qtz vein at View from top of Saddle looking toward Noche Buena Mine 9km to

Slide 16: El Mezquite Gold Property
El Mezquite Gold Property Yecora Area, Sonora

Slide 17: El Mezquite Gold Property
El Mezquite Gold Property Early Stage Exploration High Potential Exploration Opportunity • 180 Hectares • Sierra Madre Occidental – Sonora Gold Belt, Mexico • Potential to host low grade / large tonnage deposits El Mezquite • 10 km NW of Tepoca, Sonora Mexico (175 km ESE of Hermosillo) • Between: La

Slide 18: El Mezquite: Exploration to Date
El Mezquite: Exploration to Date • 321 Rock Chip Samples • 42 showing high values (>0.10 g/t Au) (up to 3.41 g/t Au & 198 g/t Ag) • 3DIP & Mag survey completed over Eastern side of property – drill targets identified • Historical artisanal mines and workings – several yet to be mapped • Never been d

Slide 19: El Mezquite: Going Forward
Grab Samples (g/t Au) + El Mezquite: Going Forward ➢ Additional geochemical exploration focussed on surface anomalies – mapping and sampling ➢ Additional geophysical survey work on other targets ➢ Drilling TSX Venture: CBI 19

Slide 20: Management & Board
Management & Board Experience & Leadership

Slide 21: Leadership Team
Leadership Team Management is experienced in mineral exploration, mine development, business development, and corporate finance. Chairman/CEO/ Founder, Former President, CEO & Chairman of both Major Drilling International (TSX: MDI) and the Ronald Goguen, Sr. President Beaver Brook Antimony Mine Bri

Slide 22: Share Structure
Share Structure As of: March 15, 2019

Slide 23: Share Structure
Share Structure Ticker Symbol TSX Venture: CBI Total Shares Outstanding 59,082,986 4,462,500 - 25c until Sept, 2019 11,042,980 -15c until February, 2023 Warrants: 23,239,480 1,350,000 - 15c until March, 2023 6,384,000 – 10c until March, 2022 550,000 - 15c until June, 2021 Options: 4,325,000 1,975,00

Slide 24: Summary: Go Forward Plan
Summary 12 month Go Forward Plan – (Creating Value & News Flow) 1) Sell Pitaya interest 2) Complete proposed work on current projects Priority Work: i. Trenching, Mapping and Drilling at El Mezquite ii. Geophysics, Mapping and Drilling at Evelyn iii. Structure Study and Trenching at Pilar iv. Prospe

Slide 25: THANK YOU!
THANK YOU! Colibri Resource Corporation TSX Venture – CBI Suite 700-105 Englehart Street Phone: (506) 383-4274 Dieppe, New Brunswick E1A 8K2 TSX Venture: CBI Email: info@colibriresource.com Canada 25

Slide 26: Pitaya Property
Appendix 1 Pitaya Property Caborca Area, Sonora Mexico

Slide 27: Pitaya Property (JV Partnership with Agnico)
Pitaya Property (JV Partnership with Agnico) Advanced Exploration Commodity: Gold (Au) Size: 6564 hectares (65.64 Km²) Stage: Advanced Exploration Ownership: 24.45% (JV Partner Agnico Eagle: 75.55%) Location: Sonora State, Mexico Reserves: Not determined Nearby Exploration: Fresnillo - Tajitos Proje

Slide 28: Pitaya Property
Pitaya Property Extensive work completed on Project: >5 Moz • Drilling: 15,322 m >10 Moz Au • Drilling 2017: 7,642 m (27 holes) • Chip & Soil Samples: 2,700 + (>0.4 MozAu) • Ground Mag / SRK Extensive • Mapping & Modelling Extensive • Total Expenditures: $6.26 million USD • Expended in 2017: $1.36 m

Slide 29: Jackie Property
Appendix 2 Jackie Property High Sierra, Sonora Mexico

Slide 30: Jackie Property
Jackie Property Grass Roots Exploration • Property acquisition announced in October 2018 REGIONAL EXPLORATION • 1130 Hectares (2km SSW of El Mezquite) • High Sierra Madre – Sonora, Mexico Minera Alamos’ – Santana Project • No historic exploration or drilling Recent Drilling Results: (Nicho Deposit)
Source: Internet Archive copy of colibriresource.com
More decks from Colibri Resource Corporation
Investor Presentation (February 2026)16 slides · February 2026
Investor Presentation (December 2019)36 slides · Dec 1, 2019
Investor Presentation (July 2018)24 slides · July 2018
Investor Presentation (March 2011)43 slides · March 2011
Investor Presentation (July 2010)23 slides · July 2010
Technical Presentation (September 2008)16 slides · September 2008