Colibri Resource Corporation · TSXV:CBI
Colibri Resource — Investor Presentation (March 2011)
43 slides from Colibri Resource's investor presentation, March 2011
Slide 1: Corporate structure
Corporate structure Sonora, Mexico March 2011 Colibri Current Shares 34,811,000 Options 1,840,000 3/11/2011 TSX.V:CBI 1
Slide 2: Colibri Management
Colibri Management • Lance Geselbracht, P.E. Director, President and CEO • Jon Nourse, PhD. Director, Vice President Exploration • Jim Irwin, PhD. Founder, Exploration Manager TSX.V:CBI
Slide 3: Projects
Projects 3/11/2011 TSX.V:CBI 3
Slide 4: RAMARD Project Location
RAMARD Project Location 3/11/2011 TSX.V:CBI 4
Slide 5: Colibri Project
Colibri Project 3/11/2011 TSX.V:CBI 5
Slide 6: COLIBRI Project
COLIBRI Project 3/11/2011 TSX.V:CBI 6
Slide 7: COLIBRI Agnico-Eagle Mines, Joint Venture
COLIBRI Agnico-Eagle Mines, Joint Venture • AEM can earn up to 75% of Colibri claim • Option payments totaling $1.5 million over 7 yrs. • $3 million exploration cost over 3 years • Positive feasibility report with in 5 years to maintain 75% ownership position • Equity participation by AEM: they will
Slide 8: Evelyn Project
Evelyn Project 3/11/2011 TSX.V:CBI 8
Slide 9: EVELYN Project Map
EVELYN Project Map 3/11/2011 TSX.V:CBI 9
Slide 10: EVELYN Rock-Chip Samples
EVELYN Rock-Chip Samples 3/11/2011 TSX.V:CBI 10
Slide 11: Leon Project
Leon Project 3/11/2011 TSX.V:CBI 11
Slide 12: LEON Drill Targets
LEON Drill Targets TSX.V:CBI
Slide 13: LEON Mo Soil Anomalies – Target Areas
LEON Mo Soil Anomalies – Target Areas 3/11/2011 TSX.V:CBI 13
Slide 14: LEON Drill Assays
LEON Drill Assays 3/11/2011 TSX.V:CBI 14
Slide 15: LEON Azul North Zone Drill Section
LEON Azul North Zone Drill Section 3/11/2011 TSX.V:CBI 15
Slide 16: Generalized Geologic Cross Section
Generalized Geologic Cross Section TSX.V:CBI
Slide 17: Middle-Tertiary Extension: Displacement of Porphyry Ore Bodies
Middle-Tertiary Extension: Displacement of Porphyry Ore Bodies along low-angle normal “Detachment” faults Lowell and Guilbert, 1970: The Classic San Manuel- Kalamazoo Connection Porphyry Molybdenum Ore Body El Creston Molybdenum Leon Molybdenum Deposit: Discovery: The Leon-Creston Connection TSX.V:C
Slide 18: LEON Projects
LEON Projects Drilling demonstrated higher grade mineralization than immediately adjacent project in process of bankeable feasibility At surface, zero strip. Potential for bulk tonnage, multiples of hundreds of million tonnes. 3/11/2011 TSX.V:CBI 18
Slide 19: Ramard Silver Project
Ramard Silver Project 3/11/2011 TSX.V:CBI 19
Slide 20: RAMARD Claim Map and Drill Targets
RAMARD Claim Map and Drill Targets 3/11/2011 TSX.V:CBI 20
Slide 21: RAMARD Rock-Chip Samples - Silver
RAMARD Rock-Chip Samples - Silver Ag ppm > 60 30 – 60 15 – 30 10 – 15 5 – 10 < 10 3/11/2011 TSX.V:CBI 21
Slide 22: RAMARD Rock-Chip Samples - Zinc
RAMARD Rock-Chip Samples - Zinc Zn ppm > 10000 5000 – 10000 3000 – 5000 1000 – 3000 500 – 1000 < 500 3/11/2011 TSX.V:CBI 22
Slide 23: TSX.V:CBI
Célibri RESOURCE CORPORATION 3/11/2011
Slide 24: TSX.V:CBI
3/11/2011 TSX.V:CBI 24
Slide 25: TSX.V:CBI
Célibri RESOURCE CORPORATION 3/11/2011 25
Slide 26: TSX.V:CBI
Célibri RESOURCE CORPORATION 1/2011
Slide 27: TSX.V:CBI
3/11/2011 TSX.V:CBI 27
Slide 28: TSX.V:CBI
Célibri RESOURCE CORPORATION 3/11/2011 28
Slide 29: TSX.V:CBI
Célibri RESOURCE CORPORATION 29 = jo) N = = — — ise)
Slide 30: TSX.V:CBI
RESOURCE CORPORATION Célior
Slide 31: Percussion Drill Results
Percussion Drill Results 3/11/2011 TSX.V:CBI 31
Slide 32: La Bronca Zone
libri La Bronca Zone RESOURCE CORPORATION 250 meters st}, Strike / Dip of bedding RPDS = ~Alr Trak™ Percussion Drill Hole
Slide 33: RAMARD Drill Collar Map
RAMARD Drill Collar Map 3/11/2011 TSX.V:CBI 33
Slide 34: RAMARD Drill Section I-I’
RAMARD Drill Section I-I’ 3/11/2011 TSX.V:CBI 34
Slide 35: RAMARD Drill Section F-F’
RAMARD Drill Section F-F’ 3/11/2011 TSX.V:CBI 35
Slide 36: RAMARD Drill Section E-E’
RAMARD Drill Section E-E’ 3/11/2011 TSX.V:CBI 36
Slide 37: RAMARD Drill Section C-C’
RAMARD Drill Section C-C’ 3/11/2011 TSX.V:CBI 37
Slide 38: Geologic Cross-Section La Bronca Target Zone
Geologic Cross-Section La Bronca Target Zone 3/11/2011 TSX.V:CBI 38
Slide 39: Silver Intercepts
Silver Intercepts Total Drill Interval Width Silver Copper Lead Zinc Drill Hole Depth Comments (meters) (meters) (gpt) (ppm) (percent) (percent) (meters) RPD1 22.5m 0 - 22.5m 22.5m 75 187 0.70 2.60 entire hole mineralized includes 1.5 - 7.5m 6m 254 435 2.27 8.50 6-7.5m 1.5m 497 100 4.30 6.30 7.5 - 2
Slide 40: Silver Intercepts
Silver Intercepts Total Drill Interval Width Silver Copper Lead Zinc Drill Hole Depth Comments (meters) (meters) (gpt) (ppm) (percent) (percent) (meters) RPD42 30m 21-27m 6m 77 1616 0.9 11 hole ends in 13.6gpt Ag, 2.3%Zn hole ends in 99 gpt Ag, 0.9%Pb, RPD44 24m 21-22.5m 1.5m 288 150 3.1 3.3 0.8%Zn
Slide 41: Zinc Intercepts
Zinc Intercepts Total Depth Silver Drill Hole Drill Interval (meters) Width (meters) Copper (ppm) Lead (percent) Zinc (percent) (meters) (gpt) RPD1 22.5m 0 - 22.5m 22.5m 75 187 0.70 2.60 includes 1.5 - 7.5m 6m 254 435 2.27 8.50 7.5 - 22.5m 15m 11 119 0.14 0.50 RPD2 25.5m 0 - 25.5m 25.5m 65 114 0.80
Slide 42: RAMARD Project Summary
RAMARD Project Summary • The Ramard claim package greater than 4,000 hectares encompassing numerous high grade silver- gold-lead-zinc mine workings within skarns underlain by a large porphyry system • Percussion drilling demonstrates high grade, near surface silver-lead-zinc mineralization in the Br
Slide 43: RAMARD Exploration Plan
RAMARD Exploration Plan • Exploration Program • Core drilling in the Bronca and Verde zones. • Twin prior percussion holes and extend to depth Outcrops of mineralization extend to greater than 50 meters depth, percussion holes only maximum of 40m. Underlying porphyry is exposed in canyons. Mineraliz
Colibri Resource — Investor Presentation (March 2011) on 6ix