  1. Slide 1: Brisbane Mining Club Presentation

    Brisbane Mining Club Presentation 27 October 2022 Presented by: Andre Labuschagne Aeris Resources Limited

  2. Slide 2: Disclaimer

    Disclaimer This investor presentation is dated 16 September 2022 and has been prepared by Aeris Resources Limited (“Aeris” or the “Company”). By attending an investor presentation or briefing, or accepting, accessing or reviewing this presentation, you acknowledge and agree to the terms set out belo

  3. Slide 3: Disclaimer

    Disclaimer Production Targets Cautionary Statement The Ore Reserve and Mineral Resource estimates underpinning the Stockman and Tritton Production Targets (refer to slides 13 and 28) were prepared by a Competent Person in accordance with the JORC Code 2012. The material assumptions on which the Prod

  4. Slide 4: Aeris 10 year journey

    Aeris 10 year journey From US$134M debt and 1 mine to zero debt and 4 mines 278 Figures taken end of Financial Year

  5. Slide 5: Aeris Resources

    Aeris Resources Australian mid-tier base and precious metals producer 4 producing operations 1 long life development project Resources of 780kt Cu, 993kt Zn, 1.4Moz Au1 FY23 production of 57 – 71kt Cu equivalent2 Strong long-term exposure to copper Excellent platform for growth 1. Refer to ASX relea

  6. Slide 6: Corporate overview

    Corporate overview Robust balance sheet and supportive shareholder base Capitalisation Shareholders3 Market capitalisation1 $276 million Cash2 $92 million Debt2 - 30% Enterprise value $184 million 44% Broker coverage 22% 4% WHSP Australian Institutions Foreign Institutions Retail & Other 1. As at 26

  7. Slide 7: Sustainability

    Sustainability Commitment to transparency, integrity and sustainability Water and Carbon and Diversity and Biodiversity and Containment Climate Change Inclusion Land Using resources Reducing carbon Building more equal, Planning and delivering efficiently in water, footprint and diverse, fair and pos

  8. Slide 8: Sustainability: Tritton water experience

    Sustainability Tritton water experience 2019-2020 8

  9. Slide 9: Sustainability: Carbon

    Sustainability Carbon - Converted loader to electric loader 9

  10. Slide 10: Sustainability: Diversity and Inclusion

    Sustainability Diversity and Inclusion Tritton new local apprentices intake 10

  11. Slide 11: Sustainability: Biodiversity and Land

    Sustainability Biodiversity and Land - Tailings management 11

  12. Slide 12: Track record of growing reserve base and mine lives

    Track record of growing reserve base and mine lives FY 23 FY 24 FY 25 FY 26 FY 27 FY 28 FY 29 FY 30 FY 31 FY 32 FY 33 FY 34 • Multiple assets with proven track record of mine life extensions including two long life assets 1 Tritton 8 year mine life 2 Cracow 4 year mine life 3 Jaguar 4 year mine life

  13. Slide 13: Tritton

    Tritton Cornerstone copper production and 8+ year mine life ✓ Consistently extending mine life through exploration Tritton production profile (kt, Cu)1 1 ✓ Moving to hub and spoke model 30-33 ✓ Bringing high grade ore sources into production, lifting copper 25 23 22-24 production 19-23 18.6 ✓ Curren

  14. Slide 14: Tritton growth projects

    Tritton growth projects Improving ore grades and extending mine life Avoca Tank Displacing 1.1% Cu from Tritton deeps with: Tritton and Budgerygar • 1.8% Cu ore from Budgerygar (in production)1 • 2.5% Cu and 0.8g/t Au ore from Avoca Tank (in production Q4 FY23)1 • Extending Tritton deeps to high gra

  15. Slide 15: Constellation deposit

    Constellation deposit New potential mine • Located 45km northeast of the Tritton plant • Mineral Resource1 of 6.7Mt at 1.85% Cu and 0.58g/t Au ‒ Containing 123kt copper and 125koz gold ‒ Approximately 3.1Mt of oxide, supergene and primary mineralisation is open pittable • Resource extended from near

  16. Slide 16: Tritton exploration pipeline

    Tritton exploration pipeline Focus to the north • Highly endowed region and 2,330km2 tenement package • 750kt copper already discovered and produced from deposits south of the Mitchell Highway • Constellation discovered in 2019 – looking for repeats • EM survey completed on northern tenements – awai

  17. Slide 17: Cracow

    Cracow High-grade gold mine with long history of reserve replacement ✓ Mature operation with high quality infrastructure ✓ Declining grades in the Western Vein Field ✓ Reinvesting cash flows in exploration ✓ Golden Plateau is high priority target ✓ Southern Vein Field underexplored due to thick cove

  18. Slide 18: Aeris

    (— = > Z@) Aeris 18

  19. Slide 19: Cracow growth projects

    Cracow growth projects Golden Plateau – potential new ore source • Located only 1km from the Cracow mill • Crosscutting structures host high-grade mineralisation away from the historic mining footprint • Current drilling is targeting 5 priority lodes • Recent drill intersections1 include: • 8.9m at

  20. Slide 20: Jaguar

    Jaguar Consistent, polymetallic underground mine ✓ Investing to extend Bentley operations at depth ✓ New Turbo lens discovered in 2021 to extend Bentley mine life ✓ Other high grade exploration targets at depth at Bentley ✓ Investigating potential at the closed Jaguar copper mine 20

  21. Slide 21: Ze Nets

    Ze Nets

  22. Slide 22: Jaguar growth projects

    Jaguar growth projects Significant resource growth potential at depth • Bentley deposit open along strike and down plunge • The high grade Turbo lens is a priority target – resource update planned for later in the year • New target Java Deeps also returned high-grade intersections1: ‒ 7.1m at 2.15%

  23. Slide 23: North Queensland

    North Queensland Cash generative copper-gold mine and large exploration portfolio ✓ Harvesting cash from Mt Colin mine to fund other group capital developments ✓ Potential underground operation at Barbara ✓ Large tenement package in highly prospective region to be explored ✓ Strategy to build a pipe

  24. Slide 24: Aeris Resources

    A Aeris RESOURCES 24

  25. Slide 25: North Queensland growth projects

    North Queensland growth projects Near-term potential at Barbara and large regional portfolio Barbara • Open pit mining finished in Dec 2020 • Mineralisation extends below current pit and is open at depth • Mining study on a potential underground operation of similar scale to Mt Colin • Drill program

  26. Slide 26: Stockman

    Stockman High-grade, long life, polymetallic development project ✓ Mining Lease – approved ✓ Infrastructure Lease for tailings dam – approved ✓ Project work plan – approved ✓ High-grade, +10 year Ore Reserve of 9.6Mt at 2.9% CuEq (recovered)1 ✓ Significant onsite road infrastructure already in place

  27. Slide 27: Stockman

    Stockman Wilga mine targeting ~200ktpa Advanced technical studies • Underground mining operations at the Wilga and Currawong deposits targeting 1Mtpa • Conventional flotation plant to produce copper and zinc concentrates with significant precious metals by-products Currawong mine targeting ~800ktpa

  28. Slide 28: Stockman

    Stockman Indicative Production (kt, CuEq) 1,2 Clear path to development 40 • Definitive feasibility study underway and due 35 for completion FY23 30 • Opportunities to extend mine life with Bigfoot and Eureka resources 25 • Highly prospective tenements with over 50 20 drill targets identified 15 10

  29. Slide 29: The Market

    Aeris Resources The Market 29

  30. Slide 30: Global mining sector themes

    Global mining sector themes Decarbonisation will drive demand over the next 10 years Source: Capital IQ, Jefferies research. (1) International Energy Agency. (2) Benchmark Minerals Intelligence. 30

  31. Slide 31: Global mining sector themes

    Global mining sector themes Grades declining incentive price remains constructive (4) (3) Gavin Mudd, Monash University. Jefferies Australia (4) Capital IQ. 31

  32. Slide 32: Global mining sector themes

    Global mining sector themes Industry slow to respond, technology the future (5) (5) Jefferies research 32

  33. Slide 33: Thank you

    Thank you Are there any questions? Aeris Resources Limited Level 2, HQ South Tower 520 Wickham Street Fortitude Valley Brisbane QLD, 4006 +61 7 3034 6200 Facebook | facebook.com/aeristritton/ Linkedin | linkedin.com/company/aeris-resources-limited/ info@aerisresources.com.au Public Relations Madelei

  34. Slide 34: Appendix

    wes a xy r, | 3 ! “= ‘prea q We are Aeris

  35. Slide 35: Group guidance

    Group guidance FY23 Guidance FY22A Production Copper kt 32 - 40 18.6 Zinc kt 24 - 29 0.0 Gold koz 60 - 78 58.2 Silver Moz 1.1 - 1.3 0.1 Operating Costs Mining $M 229 - 277 147 Processing $M 98 - 120 53 Site G&A $M 69 - 83 30 TC/RCs $M 37 - 45 11 Product handling $M 41 - 49 18 Capital Costs Sustainin

  36. Slide 36: Group Mineral Resources

    Group Mineral Resources Grade Contained Metal Project Category Tonnes ('000) % Cu % Zn g/t Au g/t Ag kt Cu kt Zn koz Au koz Ag Tritton Measured 2,311 1.2 - 0.1 2.7 27 - 6 201 Indicated 11,252 1.4 - 0.3 4.3 158 - 111 1,564 Inferred 9,334 1.7 - 0.4 4.0 159 - 119 1,188 Total 22,896 1.5 - 0.3 4.0 344 -

  37. Slide 37: Group Ore Reserves

    Group Ore Reserves Grade Contained Metal Project Category Tonnes ('000) % Cu % Zn g/t Au g/t Ag kt Cu kt Zn koz Au koz Ag Tritton Proved 1,085 1.2 - 0.1 2.4 13 - 2 84 Probable 3,717 1.4 - 0.3 3.5 53 - 41 420 Total 4,802 1.4 - 0.3 3.3 67 - 43 504 Cracow Proved 199 - - 4.0 - - - 26 - Probable 622 - -

  38. Slide 38: Highly experienced board and management

    Highly experienced board and management Board of Directors Andre Labuschagne – Executive Chairman Sylvia Wiggins – Non-Executive Director Robert Millner – Non-Executive Director Experienced mining executive with a career A senior executive and investment banker with a Chairman of WHSP. Extensive exp

  39. Slide 39: Copper equivalent calculation

    Copper equivalent calculation Copper Equivalent Calculation In this presentation, production is presented on a recovered CuEq metal produced basis and AISC costs are presented on a payable CuEq metal Recovery Factors by Operation FY21 FY22 FY23 LOMP sold basis. Recovery Factor Zinc Tritton % Recover