Slide 1: Terramin General Update
Terramin General Update Matt Daniel – Environment and Community Superintendent Angas Zinc Mine 1
Slide 2: Angas Zinc Mine
Angas Zinc Mine Ongoing management of site – weed control and revegetation During the quarter observed a family of White-browed Babblers, first seen on site in 7 years Picture shows a Little Eagle, taken on AZM (M.Ankor) Hydrostor - progress Compressed Air Energy Storage Presentation ton
Slide 3: Terramin Update
Terramin Update Appointed new CEO – Richard Taylor Bachelors of Economics and Law – University of Newcastle Master of Laws – ANU Master of Business Administration – Cambridge Member of Australian Institute of Company Directors Panaust Asia Managing Director, copper gold mine, Laos MM
Slide 4: Terramin - Projects
Terramin - Projects Bird in Hand / Angas Processing Facility Beginning to receive feedback from DEM on BIH ML Proposal Draft AZM MPL being reviewed externally prior to the draft being lodged with DEM Still waiting on DEM approval to begin Managed Aquifer Recharge drilling at BIH Tala Hamza
Slide 5: Quarterly Environment Report
Quarterly Environment Report Matt Daniel – Environment and Community Superintendent 5
Slide 6: Activities over Q1
Activities over Q1 Annual Compliance report submitted in March Continued drafting of MPL for Angas Processing Facility Updated stormwater design for MPL – AECOM Slight catchment change
Angas Zinc Mine – Quarterly Environment Report No non-compliances against lease Conditions for Quarter 1, 2018 Correction to QER No non-compliance against PM10 Outcome Measurable Criteria Review: “PM10 dust levels collected from the HiVol PM10 sampler located at the visitors viewing area (Figu
Angas Zinc Mine – Quarterly Environment Report 17th March 2018 - Saturday PM10 measured 55ug/m3 over 24 hours Unusual - Investigation showed wind direction towards operational area all day, not away from operational area No activities being undertaken at AZM No southerlys, south-westerlys, o
Slide 9: Tailings Storage Facility
Tailings Storage Facility Surface area remains at approximately <5000m2 Water level is approximately 67.68m RL (compliance is 74.2m RL) Seepage drains remain lowest they’ve been in last 2 years – approx. ≈ 1L/min Cadmium spike in TSF B and D reviewed by ATC Williams and unrelated to TSF TSF
Slide 10: Closure Plan Fact Sheets
Closure Plan Fact Sheets Up in Visitor’s Viewing Platform at AZM Copies available for Community Access areas (actions outstanding from last meeting) See Matt after meeting to obtain a set
Slide 11: Questions?
Questions?
Slide 12: Hydrostor A-CAES System Basics
Hydrostor A-CAES System Basics
Slide 13: Terramin Zinc Mine A-CAES System
Terramin Zinc Mine A-CAES System
Slide 14: Benefits for Australia
Benefits for Australia • Repurpose decommissioned thermal plants and defer Fossil Plant remediation costs Replacement • Re-use of existing interconnection and infrastructure • Synchronous generation for reliability, without emissions • Non-wires alternatives to defer grid network investment Transmis