    Terramin General Update Matt Daniel – Environment and Community Superintendent Angas Zinc Mine 1

  2. Slide 2: Angas Zinc Mine

    Slide 2: Angas Zinc Mine

    Angas Zinc Mine  Ongoing management of site – weed control and revegetation  During the quarter observed a family of White-browed Babblers, first seen on site in 7 years  Picture shows a Little Eagle, taken on AZM (M.Ankor)  Hydrostor - progress  Compressed Air Energy Storage  Presentation ton

  3. Slide 3: Terramin Update

    Slide 3: Terramin Update

    Terramin Update  Appointed new CEO – Richard Taylor  Bachelors of Economics and Law – University of Newcastle  Master of Laws – ANU  Master of Business Administration – Cambridge  Member of Australian Institute of Company Directors  Panaust Asia  Managing Director, copper gold mine, Laos  MM

  4. Slide 4: Terramin - Projects

    Slide 4: Terramin - Projects

    Terramin - Projects  Bird in Hand / Angas Processing Facility  Beginning to receive feedback from DEM on BIH ML Proposal  Draft AZM MPL being reviewed externally prior to the draft being lodged with DEM  Still waiting on DEM approval to begin Managed Aquifer Recharge drilling at BIH  Tala Hamza

  5. Slide 5: Quarterly Environment Report

    Slide 5: Quarterly Environment Report

    Quarterly Environment Report Matt Daniel – Environment and Community Superintendent 5

  6. Slide 6: Activities over Q1

    Slide 6: Activities over Q1

    Activities over Q1  Annual Compliance report submitted in March  Continued drafting of MPL for Angas Processing Facility  Updated stormwater design for MPL – AECOM  Slight catchment change

  7. Slide 7: Angas Zinc Mine – Quarterly Environment Report

    Slide 7: Angas Zinc Mine – Quarterly Environment Report

    Angas Zinc Mine – Quarterly Environment Report No non-compliances against lease Conditions for Quarter 1, 2018  Correction to QER  No non-compliance against PM10 Outcome Measurable Criteria  Review: “PM10 dust levels collected from the HiVol PM10 sampler located at the visitors viewing area (Figu

  8. Slide 8: Angas Zinc Mine – Quarterly Environment Report

    Slide 8: Angas Zinc Mine – Quarterly Environment Report

    Angas Zinc Mine – Quarterly Environment Report 17th March 2018 - Saturday  PM10 measured 55ug/m3 over 24 hours  Unusual - Investigation showed wind direction towards operational area all day, not away from operational area  No activities being undertaken at AZM  No southerlys, south-westerlys, o

  9. Slide 9: Tailings Storage Facility

    Slide 9: Tailings Storage Facility

    Tailings Storage Facility  Surface area remains at approximately <5000m2  Water level is approximately 67.68m RL (compliance is 74.2m RL)  Seepage drains remain lowest they’ve been in last 2 years – approx. ≈ 1L/min  Cadmium spike in TSF B and D reviewed by ATC Williams and unrelated to TSF TSF

  10. Slide 10: Closure Plan Fact Sheets

    Slide 10: Closure Plan Fact Sheets

    Closure Plan Fact Sheets  Up in Visitor’s Viewing Platform at AZM  Copies available for Community Access areas (actions outstanding from last meeting)  See Matt after meeting to obtain a set

  11. Slide 11: Questions?

    Slide 11: Questions?

    Questions?

  12. Slide 12: Hydrostor A-CAES System Basics

    Slide 12: Hydrostor A-CAES System Basics

    Hydrostor A-CAES System Basics

  13. Slide 13: Terramin Zinc Mine A-CAES System

    Slide 13: Terramin Zinc Mine A-CAES System

    Terramin Zinc Mine A-CAES System

  14. Slide 14: Benefits for Australia

    Slide 14: Benefits for Australia

    Benefits for Australia • Repurpose decommissioned thermal plants and defer Fossil Plant remediation costs Replacement • Re-use of existing interconnection and infrastructure • Synchronous generation for reliability, without emissions • Non-wires alternatives to defer grid network investment Transmis