Global Lithium Resources Ltd. · ASX:GL1
Global Lithium Resources — RIU Sydney Resources Round-Up (May 2024)
18 slides from Global Lithium Resources's conference presentation, May 6, 2024
Slide 1: Global Lithium Resources
For personal use only GLOBAL LITHIUM RESOURCES May 2024 ASX:GL1 1
Slide 2: Important Notice and Disclaimer
Important Notice and Disclaimer These presentation materials and the accompanying verbal presentation (together, the Presentation Materials) have been • involve known and unknown risks and uncertainties that could cause actual events or results to differ materially from estimated prepared by Global
Slide 3: Strategic Highlights
Strategic Highlights Multi-asset development JORC compliant Tier 1 For personal use only optionality resources Jurisdiction • Combined Mineral Resource of • Wholly owned 2 JORC compliant • Located in world’s best mining 54Mt @ 1.09% Li2O 1 lithium resources in Australia jurisdiction of Western Austr
Slide 4: GL1 Corporate Snapshot (3 May 2024)
GL1 Corporate Snapshot (3 May 2024) ASX share price performance Millions 14 $3.5 Market Cap Share Price Shares on issue 12 $3.0 For personal use only Share Price (A$) A$98.8m A$0.38 260m 10 $2.5 Volume (m) 8 $2.0 6 $1.5 Options1 Cash2 Equity in ASX:KAI3&4 4 $1.0 2 12.7m A$30m A$3.1m (10%) $0.5 0 $0.
Slide 5: Manna Lithium Project
For personal use only MANNA MANNALITHIUM LITHIUM PROJECT PROJECT • 100% owned project • 100% owned project • Tier 1 mining jurisdiction • Tier 1 mining jurisdiction • Outcropping spodumene bearing pegmatite • Spodumene dominant hard rock lithium pegmatite • Current Indicated & Inferred Mineral Resou
Slide 6: Kalgoorlie Lithium Province – Manna is the 2nd Largest Resource
Kalgoorlie Lithium Province – Manna is the 2nd Largest Resource For personal use only Major Mines & City of Kalgoorlie- Access to Railway Projects Boulder Access Road High-speed Data Utilities 1 Company public information 6
Slide 7: Exploration Summary
Exploration Summary Exploration For personal use only • Two years of intensive exploration: o CY22 – 46,000m1 o CY23 – 60,000m2 o Current MRE (36.0Mt @ 1.13%) based on historical and CY2022 drilling3 • CY23 infill drilling to increase confidence in resource classification • CY24 extensional drilling
Slide 8: Exploration - Upside Ahead
Exploration - Upside Ahead Results received from over 100,000m of RC and Diamond Drilling completed in For personal use only CY22 & 231 • Best2drill intercept to date of 26m @ 1.53% Li2O • Manna Central resource area continues to demonstrate continuity and high-grades • Manna pegmatites have returne
Slide 9: Geological Model & Planned Infrastructure
Geological Model & Planned Infrastructure For personal use only 9
Slide 10: Definitive Feasibility Study - Advancing
Definitive Feasibility Study - Advancing • DFS and related metallurgical studies well advanced For personal use only • Completion of DFS expected CY24 and to incorporate: • Updated MRE including all CY23 drilling program results • Detailed open pit and underground mine schedules • Optimised metallur
Slide 11: Metallurgy – Excellent Li2O Recoveries and Proven Flowsheet
Metallurgy – Excellent Li2O Recoveries and Proven Flowsheet • Manna process flowsheet well defined For personal use only • Whole-of-ore (WOO) flotation flowsheet achieving 75% lithia recovery • This increase in lithia recovery will have a positive impact on project economics at Manna • 66 flotation
Slide 12: Approvals and Permitting - Well Advanced
Approvals and Permitting - Well Advanced Environmental • All flora and fauna surveys completed with no For personal use only significant impacts identified Native Title and Heritage • All heritage surveys completed with no culturally significant sites impacted • Native Title Mining Agreement (NTMA)
Slide 13: Manna Project
For personal use only Manna Project 13
Slide 14: 2024 Key Milestones - De-risked and Disciplined
2024 Key Milestones - De-risked and Disciplined Well positioned to capture significant upside with anticipated lithium market recovery For personal use only Global Lithium Resources CY24 Metallurgical Test Results / Ore Sorting Trials Mineral Resource Estimate (MRE) Update Environmental / Native Tit
Slide 15: Marble Bar Lithium Project
MARBLE BAR For personal use only LITHIUM PROJECT • 100% owned • Tier 1 mining jurisdiction • Inferred Mineral Resource of 18.0Mt @ 1% Li2O 15
Slide 16: Highly Prospective Geological Setting
Highly Prospective Geological Setting For personal use only Geology Resource • Spodumene bearing pegmatite • Inferred Mineral Resource of hosted in greenstone and 18.0Mt @ 1.0% Li2O3 granite contact • Lithium mineralisation in drilling • Similar geological settings to identified over 15km nearby Pil
Slide 17: Community
For personal use only Community 17
Slide 18: Contact Us
Contact Us For personal use only RON MITCHELL au.linkedin.com/company/ Managing Director global-lithium-resources +61 8 6103 7488 info@globallithium.com.au @Global_Lithium BEN CREAGH Subscribe to our mailing list at: Media and Investor Relations globallithium.com.au +61 (0) 417 464 233 benc@nwrcommu
Global Lithium Resources — RIU Sydney Resources Round-Up (May 2024) on 6ix