  1. Slide 1: Transforming world class mineral resources into Gold

    Main Westheading Wits Mining Limited (ASX: WWI) For personal use only “Transforming world class mineral resources into Gold” Investor Presentation NOVEMBER 2018

  2. Slide 2: Disclaimer

    Disclaimer Main heading For personal use only This presentation may contain certain forward-looking statements that have been based on current expectations about future acts, events and circumstances. These forward-looking statements are, however, subject to risks, uncertainties and assumptions that

  3. Slide 3: WWI's Strategy to Create Value

    WWI’s Strategy to Create Value Main heading For personal use only 3 3

  4. Slide 4: Corporate: Capital Structure and Share Price Chart

    Corporate Main heading For personal use only Capital Structure 12-month Share Price Chart Shares on Issue 718m 0.04 Options (var ex prices & dates) 54m Market Cap (@ $0.012 @ 08/11/18) A$8.6m 0.03 Cash (@ Sept 2018) A$0.6m Enterprise Value (EV) A$8.0m 0.02 EV/oz A$2.25/oz 0.01 Major Shareholders % T

  5. Slide 5: Witwatersrand Basin and the Pilbara

    Witwatersrand Basin and the Pilbara Main heading For personal use only Witwatersrand Basin Pilbara conglomerate hosted gold • Worlds biggest gold deposits • The gold rush of the 21st century • Produced over 40% of all gold • An exciting new province 5 5

  6. Slide 6: Gold Deposits of the Central Rand

    Gold Deposits of the Central Rand Main heading For personal use only • Central Rand Goldfield has produced over 247 Moz historically and is still producing • WWI’s Witwatersrand Basin Project (WBP): o Produced 41 Moz at ~5g/t o Still significant areas of virgin ground untouched by previous mining o

  7. Slide 7: Significant Increase in WBP JORC Resource

    Significant Increase in WBP Main heading JORC Resource • Gold discovered in 1886 For personal use only • Over 41 Moz produced from six conglomerate reefs • Global Mineral Resource Estimate totals 3.66 Moz Au • Over 2.4 Moz of Au in Measured and Indicated • Historic resource was 12.8 Moz Au* • DRD ce

  8. Slide 8: Gold Production at Kimberley Central Open Pit

    Gold Production at Kimberley Central Main heading Open Pit For personal use only • Project recommenced under government directive (June 2017) • Mining Kimberley Reef • Contract mining • Toll treatment • 20 - 22 month project life Average Monthly Production for Sept’17 – Sept’18 Ore Produced (T) 14,0

  9. Slide 9: Kimberley Central Open Pit Production & Rehab

    Kimberley Central Open Pit Main heading Production & Rehab • For personal use only Pit 1 Rehab (left) was completed in October 2018 • Rehabilitated areas allow development of suburban centres Rescheduling of the mine plan has Pit 3 (right) operational until April 2019 9 9

  10. Slide 10: Next steps of development

    Next steps of development Main heading For personal use only Significant cost savings through the refurbishment of historical underground • Development of the infrastructure Kimberley East underground target o Commissioning of Scoping & Prefeasibility studies o Further work on the K9A Reef explorati

  11. Slide 11: Open Pit Targets – Mining Permits

    Open Pit Targets – Mining Permits Main heading For personal use only Main & South Reefs • Kimberley Central Open Pit was the Central – Open Pit first mining within the area since 2000 • Two additional Mining Permits are now sought • Next opportunities 1. Main & South Central Open Pit Kimberley West

  12. Slide 12: Mine Plan – Mining Right

    Mine Plan – Mining Right Main heading For personal use only Open-Pit 2.2km strike M&S • 7 Targets • 12km’s of strike Underground 6.0 km strike B&W • 1st Target Kimberley East • Robust resource on K9B Reef * 4.0 km strike Kimberley o 12.4MT @ 3.1g/t for 1.25Moz (2g/t cut-off) DRD Kimberley Undergroun

  13. Slide 13: Community

    Community Main heading For personal use only • Rehabilitation & Infrastructure o Sol Plaatjie Soup Kitchen & Community Development Center • Building the infrastructure of a local community development center • Providing meals to the underprivileged and unemployed in the area, with a focus on the you

  14. Slide 14: WBP - Route to Increased Production

    WBP - Route to Increased Production Main heading For personal use only JUL 2018 NOV 2018 JAN 2018 JAN 2018 14 14

  15. Slide 15: Historic geology: Pilbara and Kapvaal

    Historic geology: Pilbara and Kapvaal Main heading For personal use only • Pilbara and Kapvaal Cratons were amalgamated as part of Archean Proto Continent • Similar geologic histories • Witwatersrand Gold deposits created in sedimentary basins • Potential in Pilbara to find similar undiscovered cong

  16. Slide 16: New Frontier: Pilbara Conglomerate Hosted Gold

    New Frontier: Pilbara Conglomerate Main heading Hosted Gold For personal use only • Australia has been experiencing a 21st century gold rush • Australian projects demonstrate similarity to the famous Witwatersrand gold deposits • WWI has secured two exploration opportunities: o Tambina Mining Licenc

  17. Slide 17: Tambina: Modern Mining Operation Potential

    Tambina: Modern Mining Main heading Operation Potential For personal use only Tambina has three GRANTED mining licenses: • 73 selective rock chip samples assayed, all returned gold anomalies with 50 samples >0.5g/t and 12 samples >6g/t with highest being 185g/t • Substantial exploration database acq

  18. Slide 18: Mt Cecelia: Prospective Address

    Mt Cecelia: Prospective Address Main heading For personal use only • Mt Cecelia project area pending granting • The Paterson Province has seen significant activity by Rio Tinto and Fortescue Metals Group who have expanded their holdings in the past 12 months • Rio Tinto’s recent license applications

  19. Slide 19: WWI vs Select ASX peers

    WWI vs Select ASX peers Main heading WWI undervalued relative to peers For personal use only ASX Market Cap @ Gold Resource Mkt Cap / OZ Corporate Code 08/11/18 (A$m) (Moz) (A$/oz) Artemis Resources ARV 98.4 0.2 565.5 De Grey Mining DEG 49.3 1.4 35.5 DGO Gold DGO 15.5 0.2 89.1 Kairos Minierals KAI 2

  20. Slide 20: Key Takeaways

    Key Takeaways Main heading For personal use only • Strategic transformation to become a mid-tier gold producer with operations in the Witwatersrand Basin and Pilbara • Self-sustaining Witwatersrand Basin Project: • Ongoing production • Grow resource • Securing mining rights • Leveraging the geology

  21. Slide 21: Board and Management

    Board and Management Main heading For personal use only Michael Quinert Hulme Scholes Niel Pretorius Vincent Savage Dr. Andrew Tunks Executive Chairman Non-Executive Director Non-Executive Director Non-Executive Director Exploration Director Board Since: April 2007 Board Since: March 2011 Board Sinc

  22. Slide 22: BEE Structure

    BEE Structure Main heading For personal use only West Wits Mining Ltd (ASX: WWI) Lilitha (BEE Group) 10% 90% West Wits Mining SA (Pty) Ltd 26% 74% West Wits MLI (Pty) Ltd • West Wits’ South African projects are 33.4% owned by the Black Equity Empowerment partner, Lilitha • The ownership structure pr

  23. Slide 23: Corporate Contacts

    Corporate Contacts Main heading Andrew Tunks For personal use only Exploration Director Ph: +61 400 205 555 E: ajtunks@westwitsmining.com Simon Whyte Corporate Development & Investor Relations Ph: +61 459 797 101 E: swhyte@westwitsmining.com West Wits Mining Suite 1, Level 6, 50 Queen St Melbourne,