Konstelec Engineers Limited · NSE:KONSTELEC

Konstelec Engineers — Investor Presentation (November 2025)

30 slides from Konstelec Engineers's investor presentation, Nov 30, 2025

  1. Slide 1: Konstelec Engineers Limited

    Konstelec Engineers Limited Registered Office: Gr 001-007, A Wing, Skyline Epitome, Kirol Road, Near Jolly CONSULTING ENGINEERS & EPC SERVICES Gymkhana, Vidyavihar (West), Mumbai-400 086, Maharashtra Phone: (022) 26663827/43421500 Fax: (022) 66930903 Email:kepl@konstelec.com Website: www.konstelec.c

  2. Slide 2: Konstelec Engineers Limited

    KONSTELEC ENGINEERS LIMITED Engineering the future with integrity and excellence Electrical, Instrumentation & Automation Systems 30.11.2025 www.konstelec.com

  3. Slide 3: Our Vision and Mission

    Our Vision To become a global leader in the EPC industry pioneering comprehensive and quality solutions. Our Mission Ø To deliver safe, reliable, and innovative solutions in the EPC industry that exceed customer expectations. Ø To cultivate a safe and secure work environment for all our employees. Ø

  4. Slide 4: About Us

    About US • Commenced operations as a Design Engineering Firm in 1989 and evolved as integrated EPC company by 1995. • Promoted by a first-generation technopreneur with over five decades of experience and now ably being supported by the second-generation. • Around three decades of cross-industry proj

  5. Slide 5: Business Sectors

    Business Sectors POWER Hydrocarbon, Ports & (Therma, Hydro OIL & GAS Shipyards & Solar) Industries Chemical & International (Steel, Cement, Fertilizers Projects Pharma, Textile) Plants Konstelec Engineers Limited www.konstelec.com

  6. Slide 6: Business Sectors – Future Focus

    Business Sectors – Future Focus HV Buildings & Water & Transmission Urban Infra Irrigation Lines Konstelec Engineers Limited www.konstelec.com

  7. Slide 7: Business Segments

    Business Segments Transmission & Electrical & Civil & MEP Distribution Instrumentation • Substations • Installation • Equipment (GIS & AIS) • Testing and Foundations • Switch Yards Commissioning • RCC Framed • Transmission • Calibration Structures Lines • Loop Testing • Fire Fighting Systems • Plumb

  8. Slide 8: Last Five Years Revenue

    Last Five Years Revenue Revenue in Rs. Mil. 2153.2 1937.7 1520.3 1077.6 1020.1 2020-21 2021-22 2022-23 2023-24 2024-25 Konstelec Engineers Limited www.konstelec.com

  9. Slide 9: To Measure our Success

    To Measure our Success 30+ 900+ 1000+ Years Since Inception Manpower People on Contract 200+ Rs.650Cr 95% Projects Delivered Order Book Domestic Revenue 13.5% 9.5% 5.1 % CAGR Last 3 Years EBIDTA PAT Konstelec Engineers Limited www.konstelec.com

  10. Slide 10: Key Strength

    KEY STRENGTH • Preferred partner for leading groups like JSW, Reliance, Tata, Dangote, and IPI across Oil & Gas, Steel, and Cement sectors. • Financial strength: USD 14M credit line enabling execution of projects. • Proven track record: Repeated orders from public sector undertakings and global cong

  11. Slide 11: 360° EPC Capabilities

    360o EPC Capabilities We are India’s leading EPC company - specialized in delivering full-scale project management, procurement support, and detailed engineering services for various kinds projects across India and abroad. • Detailed • Vast Vendor Data •Project Planning •Upkeep of site and •Plant sc

  12. Slide 12: Resource Capabilities

    Resource Capabilities Manpower & Equipment Konstelec 25/11/25 Engineers Limited www.konstelec.com 12

  13. Slide 13: Key Personnel

    Biharilal R Shah Amish Shah Jigar Shah Hardik Sarvaiya Chairman Managing Director CEO & Director CFO Key Personnel Praveen Patel B Patro Narendra Sai Molly Antony Assoc. Director General Head Business HOD Accounts & Projects Manager Project Finance Development Konstelec Engineers Limited www.konstel

  14. Slide 14: Resource Capability

    RESOURCE CAPABILITY RESIDENT CONSTRUCTION PLANNING SITE ENGINEERS MANAGERS (With 10+ years of ENGINEERS (With 20+ years of experience) experience) (With 10-15 years of experience) 30 120 80 TECHNICIANS/STORE, HSE QA/QC HEAD OFFICE (With 10-15 Years of (With 5-15 years of Others experience) experienc

  15. Slide 15: HSE Commitment

    HSE COMMITMENT Konstelec 25/11/25 Engineers Limited www.konstelec.com 15

  16. Slide 16: Our HSE Commitment

    OUR HSE COMMITMENT • At Konstelec, we prioritize the highest Health, Safety, and Environment (HSE) standards as integral to our success, guided by these principles • Adherence to all relevant laws and regulations, particularly in Health, Safety, and Environmental protection. • Systematic environment

  17. Slide 17: HSE Statistics of Last Five Years

    HSE STATISTICS OF LAST FIVE YEARS NO.OF NO OF LOST MAN LOST TIME FIRST AID NEAR SR NO YEAR FATALITY REPORTABLE TIME HOURS ACCIDENTS CASES MISS INJURIES DAYS SPENT 1 2021 2,48,500 0 0 0 0 0 0 2 2022 9,45,000 0 0 0 0 4 0 3 2023 10,80,000 0 0 0 0 3 0 4 2024 12,15,000 0 0 0 0 4 0 5 2025 1312200 0 0 0 0

  18. Slide 18: Emergency Mock Drill

    EMERGENCY MOCK DRILL Konstelec Engineers Limited www.konstelec.com

  19. Slide 19: Our Presence

    Our Presence Global • Nigeria • Kingdom of Saudi Arabia Konstelec Engineers Limited www.konstelec.com

  20. Slide 20: Key Projects

    KEY PROJECTS Ongoing and Completed Konstelec 25/11/25 Engineers Limited www.konstelec.com 20

  21. Slide 21: Key Projects – Completed in recent years

    Key Projects – Completed in recent years Client Project Details Location Value(in Cr.) MRPL Electrical Works for BS-VI Project Katipala, Mangalore 29.67 IOCL 33KV Substation Guntakal, AP 27.11 IOCL SITC of Electrical and allied works Manmad, Nashik 18.73 for petroleum storage Terminal HPCL Electrica

  22. Slide 22: Key Projects - Ongoing

    Key Projects - Ongoing Client Project Details Value(in Cr.) AVVNL, Rajasthan Distribution Works under RDSS at Pratapgarh Circle 46.50 Reliance Electrical & Instrumentation works of Wafer Main Plant 13.30 AVVNL, Rajasthan Distribution Works under RDSS at Rajsamand Circle 25.00 NRL, Assam Electrical W

  23. Slide 23: Key Projects - Ongoing

    Key Projects - Ongoing Client Project Details Value(in Cr.) Electrical works-I (Part-A) for Residual Utilities & Offsite (RU&O) HRRL, Rajasthan 34.55 Facilities for Rajasthan Refinery Project of M/s. HRRL AM/NS, Hazira Electrical & Instrumentation Work at BF#2 28.50 Carrying out Electrical Works exc

  24. Slide 24: Key Projects - Ongoing

    Key Projects - Ongoing Client Project Details Value(in Cr.) Supply, Installation, Testing & Commissioning of Transformers, DG Set, HV and MV Switch Gears, Cabling, Lighting, Earthing IOCL, Dindori 18.99 and allied Electrical, Civil Works for IOCL Cryogenics Business Group, Dindori, Nashik District.

  25. Slide 25: Award and Accolades

    AWARD AND ACCOLADES

  26. Slide 26: Awards

    AWARDS Konstelec Engineers Limited www.konstelec.com

  27. Slide 27: Clientele

    CLIENTELE Konstelec 25/11/25 Engineers Limited www.konstelec.com 27

  28. Slide 28: Clientele by sector

    OIL & GAS POWER PORT/PHARMA/TEXTILES/COMMERCIAL COMPLEX & GENERAL INFRASTRUCTURE STEEL /CEMENT/ METAL MINING Konstelec Engineers Limited www.konstelec.com

  29. Slide 29: Engineering Projects International

    ENGINEERING PROJECTS INTERNATIONAL Konstelec Engineers Limited www.konstelec.com

  30. Slide 30: Thank You

    www.konstelec.com THANK YOU Gr 001-007, A Wing, Skyline Epitome, Kirol Road, Near Jolly Gymkhana, Vidyavihar (West), Mumbai– 400 086, Maharashtra, India Konstelec Engineers Limited www.konstelec.com