Wia Gold Limited · ASX:WIA

Wia Gold — Technical Presentation (July 2025)

22 slides from Wia Gold's technical presentation, Jul 16, 2025

  1. Slide 1: Mineral Resource Estimate Upgrade

    Mineral Resource Estimate Upgrade August 2024 16 July 2025 ASX: WIA

  2. Slide 2: Disclaimer

    Disclaimer General Information and Disclaimer in the forward- looking statements, including, without costs and timing for Wia Gold’s activities and such other limitation: inherent uncertainties and risks associated with assumptions as set out herein. This presentation has been prepared for the purpo

  3. Slide 3: Investment Highlights

    INVESTMENT HIGHLIGHTS WIA: ASX Fast growth Established, well Kokoseb Scoping Accelerated DD/RC Straightforward Experienced Kokoseb gold recognised mining Study in Q3’25 and drilling to drive metallurgy and Management and project jurisdiction DFS in H2 ‘26 resource growth process route Board Stable j

  4. Slide 4: Corporate Snapshot

    Corporate Snapshot Total shares on issue – (M)2 1,365 Shareholder Register Split High Net Worth 30% Board & Management 9% Options and performance rights –(M)3 70 Share price (A$/share)1 0.265 Capital DI 18% Market cap (A$M, undiluted) 362 Cash – (A$M)4 33.8 Debt (A$M) Nil Retail 16% Institutional 27

  5. Slide 5: Namibia: A Premier Mining Destination

    Namibia A Premier Mining Destination POLITICALLY S T A B L E & MINER FRIENDLY LONG E S T A B L I S H E D MINING INDUSTRY • Major revenue earner and employer in Namibia (14% of GDP, 4 0 % of • Stable democracy, independent judiciary, diverse economy foreign earnings in 2024) • Political and social su

  6. Slide 6: Kokoseb Gold Project Updated MRE

    KOKOSEB GOLD PROJECT UPDATED MRE DRIVING DEVELOPMENT OF KOKOSEB GOLD DEPOSIT 6

  7. Slide 7: Wia Gold – Namibia licences

    W ia Gold – Namibia licences Fast growth licence holder in proven gold jurisdiction • Exploration licences covering c.3,000km² • Lies within the Pan- African Damara Orogenic Belt which i s largely underexplored for gold mineralisation • Sediment-hosted style gold deposits, structurally controlled •

  8. Slide 8: Kokoseb MRE – July 2025

    Kokoseb MRE – July 20251 Indicated Inferred TOTAL Cut-off Tonnes Au Au Tonnes Au Au Tonnes Au Au Au g/t (Mt) g/t Moz (Mt) g/t Moz (Mt) g/t Moz 0.18 110 0.67 2.37 78 0.62 1.6 188 0.65 3.92 0.30 82.6 0.82 2.18 58 0.75 1.4 141 0.79 3.58 0.50 54.2 1.04 1.81 35 0.99 1.1 89 1.0 2.93 0.80 29.1 1.39 1.30 17

  9. Slide 9: Kokoseb Deposit

    Kokoseb Deposit Current golden inventory MRE July 20251 MRE April 20241 MRE May 20231 2.93m oz Au: 2.12m oz Au 1.3m oz Au 1.81m oz Indicated (inferred) (inferred) 1.1m oz Inferred 89Mt @ 1.0g/t 66Mt @ 1.0g/t 41Mt @ 1.0g/t 2025 2024 2023 2022 30,900m drilled 49,500m 29,900m 10,700m to date drilled dr

  10. Slide 10: Kokoseb – Open pit with high grade zones

    Kokoseb – Open pit with high grade zones Rapidly proving extent of scale at Kokoseb – strong and continuous gold mineralisation • N W Zone returns thickness in a strongly mineralised plunging shoot • 45m at 1.13 g/t Au from 66m in KRC371 (12.6.25) • 42.7m at 1.67 g/t Au from 155.9m in KDD015 (13.12.

  11. Slide 11: Kokoseb – high grade depth potential to add UG resource

    K o k o s e b – high grade d e p t h p o t e n t i a l t o a d d U G r e s o u r c e Refer ASX announcements dated 15 May 2023, 11 April 2024, 27 February 2025, 15 April 2025, 12 June 2025 and 3 July 2025 DRIVING DEVELOPMENT OF KOKOSEB GOLD DEPOSIT 11

  12. Slide 12: The Investment Opportunity

    The Investment Opportunity DRIVING DEVELOPMENT OFNAMIBIA’S DEVELOPING KOKOSEB GOLD GOLD DEPOSIT INDUSTRY 12 12

  13. Slide 13: Key Value Catalysts

    Key Value Catalysts 2025-2026 Our strategic Kokoseb development roadmap combines aggressive exploration, resource definition, and methodical advancement through technical studies and permitting milestones: Drilling Results • . Open at depth (surface to 350m) and along 4.8km strike. Recent discoverie

  14. Slide 14: Timeline for Kokoseb Development

    Timeline for Kokoseb Development Progress to date 2021 2022 2023 2024 2025 2026 Activity H1 H2 H1 H2 H1 H2 H1 H2 H1 H2 H1 H2 Discovery of Kokoseb MRE 1 (1.3m oz) MRE 2 (2.12m oz) RC/DD Drilling MRE 3 Scoping Study and ESIA Exploitation Permit process and award DFS Financing Today DRIVING DEVELOPMENT

  15. Slide 15: Value Accretion

    Value Accretion We are only just getting started Management Team: Strong track record of value creation in African gold Local team: Accelerated growth: Rapidly expanding 4-5 rigs in 2025, up from 2 technical team in Namibia in 2024 Kokoseb: 2.93Moz and expanding Fully financed to: Namibia: DFS due H

  16. Slide 16: Appendices

    Appendices DRIVING DEVELOPMENT OF KOKOSEB GOLD DEPOSIT 16 16

  17. Slide 17: Board and key management

    Board and key management Experienced leadership team with a proven track record of discovery & development Josef El-Raghy Andrew Pardey Mark Arnesen Executive Chairman Non-Executive Director Non-Executive Director Previously Chairman and CEO of Centamin Plc, a gold Currently Managing Director at Pre

  18. Slide 18: Experience in Africa

    Exploration Financing Experience in Africa Resource Development Construction Tasiast, Studies/Permitting Board & Management has Operations Mauritania extensive experience in African projects Sukari, Egypt Lefa (Gold), Guinea Siguiri, Guinea Doropo, Côte d'Ivoire Bankan, Guinea Kokoseb (Gold), Zambia

  19. Slide 19: Significant high-grade results at Central Zone

    S i g n i f i c a n t h i g h - g r a d e r e su l t s a t C e n t r a l Z o n e Continuous high-grade mineralisation – current focus of drilling • High-grade area around KRC086 proving continuity with results pending from KDD046 to KDD053 and further drilling underway to strengthen interpretations

  20. Slide 20: Drilling results from July and June 2025

    Drilling results from 3 July and 12 June 2025 ASX announcement 3 July 2025 ASX announcement 3 July 2025 ASX announcement 12 June 2025 DRIVING DEVELOPMENT OF KOKOSEB GOLD DEPOSIT 20

  21. Slide 21: Kokoseb vs other Namibian gold mines

    Kokoseb vs other Namibian gold mines Kokoseb footprint comparable to major Namibian operating gold mines and projects 1 2 1 Kokoseb/Wia Gold: 2.93Moz at 1.0 g/t Au (at 0.5 g/t cut-off)1 2 Otjikoto/B2Gold: 1.4 Moz at 1.5 g/t Au (at 0.4 g/t cut-off, within a US$1,350/oz Au pit shell) 2 3 3 Navachab/QK

  22. Slide 22: Contact details

    C o n t a c t d eta ils Level One 130 Hay Street, Subiaco WA 6008 Australia Tel: +61 8 6288 4252 E: info@wiagold.com.au Investor Relations/Media enquiries E: WIA@buchanancomms.co.uk