Slide 1: Wia Gold Limited – Kokoseb, Namibia
Wia Gold Limited Kokoseb, Namibia For personal use only ASX: WIA April 2026
Slide 2: Disclaimer
Disclaimer General Information and Disclaimer Forward-looking statements are subject to a variety of This presentation has been prepared for the purposes known and unknown risks, uncertainties and other Wia Gold’s forward-looking statements are based on Mineral Resource Estimate of providing informa
Slide 3: Investment highlights
Investment highlights ASX: WIA For personal use only Fast growing Kokoseb Scoping study completed and Accelerated DD/RC drilling to gold project DFS in H2 2026 drive resource growth Mining Licence application and Strike of 5.4 km / open at depth - Indicated and Inferred MRE Environmental and Social
Slide 4: Corporate snapshot
Corporate snapshot Shareholder register composition For personal use only High Net Worth 30% Total shares on issue1 1,477.1 Broker Analyst Institutional 29% Options and performance rights (M)3 67.5 Patrick Streater Capital DI 16% Share price (A$/share)1 0.51 Retail 16% Market cap (A$M, undiluted)2 7
Slide 5: Experienced leadership
Experienced leadership A proven track record of discovery, financing, development and production For personal use only Josef El-Raghy Henk Diederichs Mark Arnesen Andrew Pardey Adam Smits Non-Executive Chairman CEO/MD Non-Executive Director Non-Executive Director Non-Executive Director Josef served
Slide 6: Experience in Africa
Experience in Africa Board & Management have extensive experience in African projects 9 For personal use only 1 Kokoseb, Namibia 2 Navachab (Regional), Namibia 3 Husab, Namibia 10 11 12 4 St Helena Gold, South Africa 13 5 Lumwana, Zambia 14 15 6 Zambia Kasempa area (Regional) 16 7 Geita, Tanzania 17
Slide 7: Namibia – Kokoseb Gold Project
Namibia Kokoseb Gold Project For personal use only DRIVING DEVELOPMENT OF THE KOKOSEB GOLD DEPOSIT 7
Slide 8: Namibia: A premier low-risk mining jurisdiction
Namibia A premier low-risk mining jurisdiction For personal use only Stable Regulatory Environment Namibia's Gold District Long-standing stable democracy with an independent judiciary. Located within a proven and rapidly growing gold district. Consistent political and community support for mine Proj
Slide 9: Project location
Project location Located in the Erongo Region, 320km from Windhoek For personal use only EPL4818 DRIVING DEVELOPMENT OF THE KOKOSEB GOLD DEPOSIT 9
Slide 10: Exploration licences
Exploration licences Growing licence holder in proven gold jurisdiction For personal use only Exploration licences covering c.3,000 km2 Located within the Pan-African Damara Orogenic Belt which is largely underexplored for gold mineralisation. Sediment-hosted style gold deposits, structurally contro
Slide 11: A transformational gold discovery
A transformational gold discovery Discovered in Q3 2021, fast growth to 2.93 Moz MRE as at July 20251 For personal use only Mineral Resource Estimate1 2.93 Moz @ 1.0 g/t Au (0.5 g/t cut-off )1 Kokoseb July 2025 MRE vs previous MREs2 Inferred category Indicated category 3.5 2.93 MINERAL RESOURCE (Moz
Slide 12: Kokoseb scoping study highlights
Kokoseb scoping study highlights1 11+ year life of mine, average ~177 koz per annum (first 5 years), post- tax NPV(5%) of US$1,269M @ US$3,450/oz gold price For personal use only Strong production Simple mining & Low-cost, Robust NPV(5%) Rapid payback Growth profile processing high margin & IRR (pos
Slide 13: Open pit mining
Open pit mining Conventional load and haul operation For personal use only Pit design split into 10 stages with immediate focus on higher value areas. Schedule based on maximum mining rate of 45 Mtpa using 200t class diggers matched to 90t dump trucks. Vertical advance rates generally less than 60m
Slide 14: Conventional CIL processing plant
Conventional CIL processing plant Simple metallurgy and processing achieving +90% recovery For personal use only 5.25 Mtpa CIL plant Primary crushing with a gyratory crusher; coarse ore stockpile SABC grinding circuit Gold recovery via gravity / intensive leach and CIL Process recovery 90%+ based on
Slide 15: Production Target
Production Target1 Average ~177 koz per annum (first 5 years), with ~146koz per annum over 11.4 years life of mine (open pit only). For personal use only 250 2.00 1.80 200 1.60 1.40 Gold grade (g/t Au) Gold produced (koz) 150 1.20 1.00 100 0.80 0.60 50 0.40 0.20 - - 1 2 3 4 5 6 7 8 9 10 11 12 Year 1
Slide 16: Power, water and roads
Power, water and roads Strong foundational strength For personal use only Power NamPower application for 31 MW submitted in September 2025. NamPower study determined that a dedicated 132 kV supply from the Omburu Substation (proximal to Omaruru) provides the optimal solution for the Project. Water N
Slide 17: Permitting
Permitting Key permit applications submitted For personal use only Mining Licence application submitted to the Ministry of Industries, Mines and Energy (MIME) on 10 October 2025. Environmental and Social Impact Assessment (ESIA) and Environmental and Social Management Plan (ESMP) formally submitted
Slide 18: RC infill drilling
RC infill drilling Positive results to be included in future resource update to grow Mineral Resource Indicated Category For personal use only Infill RC drilling Shallow RC infill drilling for resource category conversion completed at the Northern and Gap Zones. 1 Most significant results returned i
Slide 19: Significant upside potential for underground mining
Significant upside potential for underground mining 6 DD rigs currently targeting high-grade Deeper higher-grade resources targeted with plunging shoots below the scoping study pit shell current in-fill drilling campaign (underground resource MRE due in H2 2026). For personal use only The Central Zo
Slide 20: H2 2026 Catalysts
H2 2026 Catalysts For personal use only 01 02 03 04 Ongoing drilling Release of MRE update incl. Grant of Mining results: 6 DD and 1 RC Definitive maiden underground Licence and rigs currently drilling Feasibility Study MRE ECC DRIVING DEVELOPMENT OF THE KOKOSEB GOLD DEPOSIT 20
Slide 21: Appendices
Appendices For personal use only DRIVING DEVELOPMENT OF THE KOKOSEB GOLD DEPOSIT 21
Slide 22: Namibia in detail
Namibia in detail Mining Code, Royalties & Tax Regime Economic Context Corporate tax: Gold taxed under non-diamond mining rate at GDP per capita: ~US$4.8k (2025) → ~US$5.2k (2026) = ~8% growth ~37.5% (higher than non-mining corporates, lower than For personal use only Exchange Rate Stability: NAD =
Slide 23: Kokoseb MRE July 2025
Kokoseb MRE July 20251 For personal use only INDICATED INFERRED TOTAL CUT-OFF Tonnes Au Au Tonnes Au Au Tonnes Au Au Au g/t (Mt) g/t Moz (Mt) g/t Moz (Mt) g/t Moz 0.18 110 0.67 2.37 78 0.62 1.6 188 0.65 3.92 0.30 82.6 0.82 2.18 58 0.75 1.4 141 0.79 3.58 0.50 54.2 1.04 1.81 35 0.99 1.1 89 1.0 2.93 0.
Slide 24: Scoping study financial metrics
Scoping study financial metrics1 Simple, long-life gold development project, with rapid payback, compelling economics and strong leverage to the current gold price For personal use only Scoping study summary metrics Post-tax NPV(5%) sensitivities (US$M) at Au @ US$2,600/oz Mine Life years 11.4 Produ
Slide 25: Implementation and execution
Implementation and execution Pathway to Kokoseb production For personal use only DRIVING DEVELOPMENT OF THE KOKOSEB GOLD DEPOSIT 25
Slide 26: Contributors to the Kokoseb scoping study
Contributors to the Kokoseb scoping study AREA CONTRIBUTOR Geology & Mineral Resource Estimation For personal use only Mining Inventory, Mine Planning & Design Mine Geotechnical Metallurgical Testwork Process Plant & Infrastructure Design Tailings Management & Surface Water Management Power Supply &
Slide 27: Contact details
For personal use only Contact details 130 Hay Street, Subiaco WA 6008 Australia Tel: +61 8 6288 4252 E: info@wiagold.com.au Investor Relations/Media enquiries E: Wia@bursonbuchanan.com DRIVING DEVELOPMENT OF KOKOSEB GOLD DEPOSIT 27