  1. Slide 1: Building Namibia's next major gold mine

    Wia Gold Limited Kokoseb, Namibia rsonal use only Building Namibia's next major gold mine November 2026 ASX: WIA wiagold.com.au

  2. Slide 2: Disclaimer

    Disclaimer General Information and Disclaimer availability of future financing necessary to undertake estimates for discussion purposes only and should not be The Company confirms that it is not aware of any new This presentation has been prepared by Wia Gold Limited activities on Wia Gold’s propert

  3. Slide 3: Investment Highlights

    Investment Highlights rsonal use only ASX: WIA Fast Growing Resource Robust DFS2 Economics Project Funding 3.78 Moz Mineral Resource1 Post-tax NPV5% of US$1,214m, IRR A$229m3 (~US$160m) cash and including 1.95 Moz Ore Reserve² of 41% and ~1.8 year payback with US$360m Sprott senior debt with signifi

  4. Slide 4: Corporate Snapshot

    Corporate Snapshot Strong Institutional and Strategic Support rsonal use only Broker Analyst 1,996.7m A$758.7m Total Shares on Issue1 Market Cap (undiluted) Patrick Streater 43m A$229.2m Alexander Bedwany Options and Cash3 Performance Rights2 David Butler Gabriele Ejikeme A$0.38 Zero George Ross Sha

  5. Slide 5: Experienced Leadership

    Experienced Leadership Discovered, permitted, financed and built some of Africa’s largest gold mines rsonal use only Josef El-Raghy Henk Diederichs Mark Arnesen Adam Smits Jamie Day Non-Executive Chairman CEO/MD Non-Executive Director Non-Executive Director Non-Executive Director Adam has significan

  6. Slide 6: Namibia: A premier low-risk mining jurisdiction

    Namibia A premier low-risk mining jurisdiction rsonal use only Stable Regulatory Environment Namibia's Gold District Long-standing stable democracy with an independent Located within a proven and rapidly growing gold district. judiciary. Projects in proximity include QKR's Navachab, B2Gold's Consist

  7. Slide 7: Project Location

    Project Location Located in the Erongo Region, 320km from Windhoek rsonal use only Otjikoto Kokoseb Gold Project Navachab Twin Hills DRIVING DEVELOPMENT OF THE KOKOSEB GOLD DEPOSIT 7

  8. Slide 8: Exploration Potential

    Exploration Potential Growing landholding in proven gold jurisdiction rsonal use only Exploration licences and rights to explore covering c.3,490 km2 Located within the Pan-African Damara Orogenic Belt which is largely underexplored for gold mineralisation. Sediment-hosted structurally controlled go

  9. Slide 9: A Transformational Gold Discovery

    A Transformational Gold Discovery Discovered in 2021, rapid growth to 3.78 Moz, including a maiden underground resource¹ MINERAL RESOURCE ESTIMATE¹ rsonal use only 3.78 Moz @ 1.0 g/t Au 0.50 g/t Au (open pit) / 0.85 g/t Au (underground) cut-off Kokoseb August 2026 MRE1 vs previous MREs² 4 3.78 Maide

  10. Slide 10: Potential for Underground Mining

    Potential for Underground Mining Maiden underground Inferred MRE¹ adds higher-grade component and underpins long-term growth rsonal use only UNDERGROUND INFERRED MRE¹ 0.56 Moz @ 2.2 g/t Au 0.85 g/t Au (underground) cut-off Underground block model contains: 5.7 Mt at 2.7 g/t Au for 0.50 Moz Au, block

  11. Slide 11: Kokoseb DFS Highlights

    Kokoseb DFS Highlights1 US$1.2bn 41% 1.8 yrs US$1,696 Post-tax NPV5% rsonal use only Post-tax IRR Payback period LOM AISC (/oz) (A$1.7bn) Base case at US$3,600/oz – the median long-term consensus gold price 3.78 Moz ~150 koz US$1,519 Mineral Resources (~53% Indicated)² Avg annual production, first 1

  12. Slide 12: DFS Production Profile (5.25mtpa Open Pit only)

    DFS Production Profile (5.25mtpa Open Pit only)1 Competitive AISC of ~US$1,696/oz with strong free cash flow generation rsonal use only 200.0 2,500 US$1,519/oz LOM C1 Cash Costs 2,000 150.0 Gold produced (koz) AISC (US$/oz) 1,500 100.0 US$1,696/oz2 1,000 LOM All-in Sustaining Cost 50.0 500 0.0 0 US$

  13. Slide 13: Open Pit Mining

    Open Pit Mining Contract mining strategy Pit design split into 8 stages with focus on higher value rsonal use only zones early in the mine life. Schedule based on maximum mining rate of 54 Mtpa using 300t class excavators matched to 140t dump trucks. DFS Mining schedule generates sufficient ore to s

  14. Slide 14: DFS Processing Plant (5.25mtpa)

    DFS Processing Plant (5.25mtpa) Simple metallurgy and processing achieving +90% recovery rsonal use only 5.25 Mtpa CIP plant, with optionality to expand to 7mtpa.¹ Primary crushing with a gyratory crusher; coarse ore stockpile. SABC grinding circuit. Gold recovery via gravity / intensive leach and l

  15. Slide 15: Sprott Project Financing

    Sprott Project Financing Indicative project financing terms agreed providing a clear pathway to production The Financing Facility Structure & Pathway rsonal use only Following completion of a competitive financing process. US$360m Senior secured debt facility – indicative, non- binding project finan

  16. Slide 16: Implementation and Execution

    Implementation and Execution Pathway to Kokoseb production¹ H2 2026 H1 2027 H2 2027 H1 2028 H2 2028 H1 2029 DFS rsonal use only Project Funding Environmental & Mining Licence Approval RAP Implementation Execution Readiness ENGINEERING & PROCUREMENT Bulk Earthworks Engineering Process Plant EPCM Wate

  17. Slide 17: Opportunities for Growth

    Opportunities for Growth DFS sets a robust base case – with upside across the plant, underground and tenure rsonal use only 7.0 Mtpa mill expansion plans¹ Underground Potential ~US$9.3m strategic investment gives optionality to expand from 5.25Mtpa to Maiden underground Mineral Resource adds a highe

  18. Slide 18: Catalysts

    Catalysts Key upcoming catalysts on the path to production rsonal use only Permitting & Regulatory Approvals Project Development Grant of the Mining Licence and Environmental Clearance Advancing detailed engineering and design. Certificate (ECC) anticipated in Q4 2026. Procurement of critical path i

  19. Slide 19: Contact details

    rsonal use only Contact details 130 Hay Street, Subiaco WA 6008 Australia Tel: +61 8 6288 4252 E: info@wiagold.com.au Investor Relations/Media enquiries E: smacpherson@vectoradvisors.au DRIVING DEVELOPMENT OF KOKOSEB GOLD DEPOSIT 19

  20. Slide 20: Appendices

    Appendices rsonal use only DRIVING DEVELOPMENT OF THE KOKOSEB GOLD DEPOSIT 20

  21. Slide 21: Kokoseb Mineral Resource & Ore Reserve

    Kokoseb Mineral Resource & Ore Reserve November 2026 JORC Ore Reserve1 rsonal use only Cut-off Tonnes Grade Contained Class. 3.78 Moz (g/t) (Mt) (g/t Au) (koz Au) Open Pit Proved - - - - Total MRE · +29% Open Pit Probable 0.40 69.8 0.87 1,950 Total Ore Reserve 69.8 0.87 1,950 JORC Mineral Resource2

  22. Slide 22: DFS Capital Cost

    DFS Capital Cost1 US$475m pre-production capital Pre-Production Capital Costs Closure and Sustaining Costs rsonal use only US$m US$m Pre-Production Mining 27 Sustaining costs 48 Plant and Infrastructure 281 Closure costs (net of US$26m salvage) 12 Water Supply 44 Total 60 Power Supply 37 Owners Cost

  23. Slide 23: DFS Operating Costs

    DFS Operating Costs1 A competitive, well-defined cost base across the mine life DFS Operating Cost Breakdown rsonal use only Area LOM (US$m) Unit Cost (US$) US$/oz US$3.10/t total Mining 1,438 783 mined Processing 1,126 US$15.44/t ore 614 General & Administrative 216 US$15.5m pa 118 Transport, Insur

  24. Slide 24: DFS Production & Financial Metrics (5.25 mtpa)

    DFS Production & Financial Metrics (5.25 mtpa)1 Post-tax NPV of US$1.2bn and 41% IRR, with strong leverage to the gold price Production Metrics Financial Metrics rsonal use only Units Value Units Base Case Spot Case2 Life of Mine years 14 Gold Price US$/oz 3,600 4,075 Mining Inventory/ Processed Mt

  25. Slide 25: Sensitivity Analysis

    Sensitivity Analysis Project economics strongly leveraged to prevailing gold price rsonal use only Base Case1 Spot Case2 Gold Price (US$/oz) Unit 3,600 4,075 4,500 5,500 NPV5% (pre-tax) US$m 1,923 2,493 3,004 4,204 IRR (pre-tax) % 51% 61% 69% 87% LOM Free Cash Flow (pre-tax) US$m 3,020 3,856 4,605 6

  26. Slide 26: Power, Water And Roads

    Power, Water And Roads Strong foundational strength Power rsonal use only NamPower application for 31 MW submitted in September 2025. NamPower study determined that a dedicated 132 kV supply from the Omburu Substation (proximal to Omaruru) provides the optimal solution for the Project. Water Okombah

  27. Slide 27: Contributors to the Kokoseb DFS

    Contributors to the Kokoseb DFS AREA CONTRIBUTOR Geology & Mineral Resource Estimation rsonal use only Mining Inventory, Mine Planning & Design Mine Geotechnical Metallurgical Testwork Process Plant & Infrastructure Design Tailings Management & Surface Water Management Power Supply & Distribution Ca