Terramin Australia Limited · ASX:TZN
Terramin Australia — Corporate Update (August 2017)
24 slides from Terramin Australia's corporate update, Aug 16, 2017

Slide 1: Bird in Hand Gold Mine Transport Task Focus Group
Bird in Hand Gold Mine Transport Task Focus Group 16th August 2017

Slide 2: What's moving?
What’s moving? • Haulage of ore • Other trucks (supplies) • Company vehicles • Employee vehicles • Visitor vehicles

Slide 3: How much is moving?
How much is moving? Average ore yield = 100 000t/annum Peak ore yield = 140 000t/annum

Slide 4: What type & how many vehicles?
What type & how many vehicles? • Ore haulage vehicles – 19m Rigid Truck and Dog; 12 loads = 24 movements per day • Other supply trucks – Rigid Trucks thru’ to Semi-Trailers 2 loads = 4 movements per day • Company vehicles - Utes/SUV’s 5 vehicles = 10 movements per day • Employee vehicles – Cars 15 c

Slide 5: How many vehicles?
How many vehicles? Overall, the mine site is expected to generate approximately 104 movements per day on Pfeiffer Road and the surrounding road network

Slide 6: Where will vehicles travel?
Where will vehicles travel? • Ore haulage – Woodside to Strathalbyn • Other supply trucks – depends on type of delivery • Company vehicles – depends on activity/user • Employee vehicles – as per company vehicles • Visitors – depends on who/where

Slide 7: What's happening on Pfeiffer Road now?
What’s happening on Pfeiffer Road now? Currently, assuming that daily traffic volumes occur over a 10 hour period each day, on average there is… 1 vehicle every 37 seconds 1 heavy vehicle every 3.9 (say 4) minutes

Slide 8: Pfeiffer Road with the mine in operation…
Pfeiffer Road with the mine in operation… Pfeiffer Road will likely experience a total of 1085 vehicles per day = 1 vehicle every 33 seconds Of this, 181 will be Heavy Vehicles = 1 Heavy Vehicle every 3.3 minutes

Slide 9: What's happening on Nairne Road now?
What’s happening on Nairne Road now? Road Segment AADT (2015) No of Heavy Vehicles %age of Heavy Vehicles Pfeiffer Rd to 3 400 200 6% Military Rd Military Rd to 5 000 230 4.5% Nairne entrance Nairne entrance to 6 300 250 5% Old Princes Highway

Slide 10: Nairne Road with the mine in operation…
Nairne Road with the mine in operation… Road Segment No of Vehicles Approx No of Heavy Heavy Vehicles per Day frequency of Vehicles per Day vehicles Pfeiffer Rd to 3 504 1 vehicle every 228 1 every 2.6 mins Military Rd 10 secs Military Rd to 5 104 1 vehicle every 7 258 1 every 2.3 mins Pfeiffer Road

Slide 11: Keeping away from peak school and commuter traffic
Keeping away from peak school and commuter traffic It is proposed that ore haulage truck movements do NOT occur between 6am - 9am and 3pm - 4pm

Slide 12: Ore Haulage
Ore Haulage Why a 19m Truck and Dog Trailer? • Number of trips needed vs • Ability of roads to cater for proposed vehicle type vs • Operating costs of vehicles

Slide 13: 19m Truck and Dog
19m Truck and Dog Source: Google, accessed 2017

Slide 14: 19m Semi-Trailer
19m Semi-Trailer Source: Google, accessed 2017

Slide 15: 26m B-Double
26m B-Double Source: Google, accessed 2017

Slide 16: 19m Truck and Dog
19m Truck and Dog • Carries more than a semi-trailer • Although it is more efficient however to use a B-Double • 19m Truck and Dog is considered a General Access Vehicle; ie can travel on any component of the road network • Vehicle operating costs of the 19m Truck and Dog very efficient compared to

Slide 17: Where will the ore travel?
Where will the ore travel? Woodside to Strathalbyn - 3 possible routes (refer maps): Route 1 – via Nairne Road, Old Princes Hwy, Bald Hills Rd, Hartman Rd, Paech Rd, Wellington Rd & Callington Rd Route 2 – via Nairne Rd, South Eastern Freeway and Callington Rd Route 3 – via Nairne Rd, Nairne Townshi

Slide 18: Selecting a Preferred Route
Selecting a Preferred Route Key considerations: • Physical assessment • Road geometry • Surrounding environment • Safety • Analytical assessment • Impact of additional traffic on the road network • Social/operational assessment • Surrounding land uses • Other road users • Operational needs of the ro

Slide 19: Physical Assessment
Physical Assessment Route 1 Travel time = 35 minutes • Roadside vegetation requires trimming • Hartman Rd/Sims Rd/Paech Rd junction does not meet requirements for a General Access Vehicle and needs upgrade • Sight distance issues • Unsealed shoulders • Needs some guard railing

Slide 20: Physical Assessment
Physical Assessment Route 2 Travel time = 40 minutes • Roadside vegetation requires trimming • Sight distance issues • Unsealed shoulders • Some warning signage required

Slide 21: Physical Assessment
Physical Assessment Route 3 Travel time = 45 minutes • Roadside vegetation requires trimming • Nairne Rd/Old Princes Hwy junction does not cater for General Access Vehicles and needs upgrade • Sight distance issues • Some warning signage required

Slide 22: Analytical Assessment
Analytical Assessment • Additional traffic as discussed previously

Slide 23: Social/ Operational Assessment
Social/ Operational Assessment • Proximity of residential development • Proximity of school traffic • Safety of existing junctions • Consideration of other nearby land uses • Others??

Slide 24: Feedback to date
Feedback to date • DPTI • Adelaide Hills Council • District Council of Mount Barker • Alexandrina Council
Source: Internet Archive copy of terramin.com.au
More decks from Terramin Australia Limited
Shareholder Meeting (May 2026)15 slides · May 2026
Shareholder Meeting (May 2025)12 slides · May 2025
Shareholder Meeting (May 2022)12 slides · May 26, 2022
Investor Presentation (October 2019)23 slides · Oct 31, 2019
Investor Presentation (October 2019)22 slides · Oct 30, 2019
Technical Presentation (June 2019)20 slides · June 2019