Slide 1: Project Update
Project Update Some feedback received on draft Mining Lease Proposal today Feedback from Geological Survey of South Australia (GSSA) and Exploration regulation Resubmitted EPEPR in line with the feedback received prior to last WCCC No additional feedback received on stage 1 No feedback on
Slide 2: Proposed Front Entrance Viewpoint 2006
Proposed Front Entrance Viewpoint 2006 TERRAMIN AUSTRALIA LIMITED SLIDE No. 2
Slide 3: Proposed Front Entrance Viewpoint 2017
Proposed Front Entrance Viewpoint 2017 TERRAMIN AUSTRALIA LIMITED SLIDE No. 3
Slide 4: Angas Zinc Mine - Revegetation
Angas Zinc Mine - Revegetation TERRAMIN AUSTRALIA LIMITED SLIDE No. 4
Slide 5: TERRAMIN AUSTRALIA LIMITED SLIDE No. 5
TERRAMIN AUSTRALIA LIMITED SLIDE No. 5
Slide 6: What is a Community Engagement Plan?
What is a Community Engagement Plan? 1. Clearly identifies key stakeholders within the community; and 2. Outlines the framework for how Terramin Australia Ltd (Terramin) and its subsidiary will engage with the stakeholders during all stages of the development, operation and ultimate closure of the P
Slide 7: What are it's aims?
What are it’s aims? Enhance and encourage positive relations between all parties Clearly disseminate information about the company’s plans, the project, its associated activities and the potential impacts, both adverse and positive, which may accrue Details about how this information flow will
Slide 8: Objectives of the CEP
Objectives of the CEP To inform about the Project; To promote community confidence Being open and transparent; To develop effective relationships To ensure local community knowledge, views and concerns Are identified and addressed; To ensure regulatory requirements and expectations are
Slide 9: Stakeholders – How are they grouped?
Stakeholders – How are they grouped? Immediate Landowners Local Agencies – e.g. CFS, RDA Regional Landowners Elected Members Local Communities Interest Groups – e.g. Landcare Catchment groundwater users Small business Visitors to the Region - e.g. tourists Media Local government Industry ; Lobby Gro
Slide 10: How does a Community Engagement Plan help?
How does a Community Engagement Plan help? Operate as Helps Terramin prioritise per CEP issues Tracks issues trends Review and Engage with Allows identification of the update CEP community new trends E.g. data gaps in community information Report on Informs Terramin’s Review new informatio
Slide 11: How does a CEP influence the Mining Lease Proposal?
How does a CEP influence the Mining Lease Proposal? Report on Review new Engagement and information experiences Review draft Mining Lease Application Review new information against Mining in light of new questions & concerns Lease Determination Update Mining Lease Commence new Application/Impact Ass
Slide 12: Engagement Tools
Engagement Tools Advertising Newsletters; Community Updates Articles One on one meetings Brochures: discussion papers Public Submissions Community information sessions Questionnaires/surveys (incl. Open Days) (Woodside) Community Consultative Site tours Committee Correspondence Speaking Engagements
Slide 13: Snapshot – March 2015 to August 2017
Snapshot – March 2015 to August 2017 Immediate Landowners Terramin has received and Regional Landowners responded to 463 unique Local Communities enquiries*, since the project Catchment groundwater users inception Visitor to the Region Local government 60% from the local community, Regulators re
Slide 14: Snapshot – March 2015 to August 2017
Snapshot – March 2015 to August 2017 Economic Impact & Opportunity 33% - employment, Community Engagement procurement and Environment opportunities Health & Safety Heritage 19% - water management Land Access and water quality Amenity 14% mine design & Mine Design & Operation operation Roads &
Slide 15: TERRAMIN AUSTRALIA LIMITED SLIDE No. 15
TERRAMIN AUSTRALIA LIMITED SLIDE No. 15
Slide 16: Bird in Hand Gold Project
Bird in Hand Gold Project TERRAMIN AUSTRALIA LIMITED SLIDE No. 16
Slide 17: Legislative Requirement
Legislative Requirement Mining Act 1971 (SA) Includes Bond provisions – s. 62 Mining Regulations 2011 (SA) Ministerial Determination for the Bird in Hand Gold Project Ministerial Guidelines for preparing Mining Proposals and PEPRs Numerous Guidelines and Best Practice guides Australian G
Slide 18: Closure is inevitable – minerals are finite
Closure is inevitable – minerals are finite Closure forms a core aspect of mining projects Modern projects – Closure is integrated into design process Recognition that mine closure has increased community expectations Legislative and regulatory response Conceptual Closure Plan required a
Slide 19: What is a Mine Closure Plan?
What is a Mine Closure Plan? A plan which must be developed and approved before mining commences which outlines the activities to be undertaken to Ensure the site is left as chemically, geomorphically, ecologically and structurally stable as the surrounding areas after mine completion. TERRAMIN AUST
Slide 20: What does a Mine Closure Plan include?
What does a Mine Closure Plan include? Potential land use options. Final landform. Proposed vegetation covers (including native vegetation that will not be disturbed due to proposed mining operations). Any infrastructure that will remain on site and will become the responsibility of the futu
Slide 21: Bond Calculation
Bond Calculation A bond is requested after a PEPR has been approved Covers the full cost of the rehabilitation of the Project, along with contingencies, and must be lodged prior to commencement of mining This is to ensure the community is not left with the financial liability for rehabilitatio
Slide 22: What do Terramin propose for Mine Closure
What do Terramin propose for Mine Closure “All land on the mining lease affected by mining and associated activities is rehabilitated to achieve the agreed post mining land use”. Intended to be offered for sale following mine closure. A range of site infrastructure elements are proposed to be re
Slide 23: Proposed Outcomes
Proposed Outcomes Topics covered – see Handout for details Landform Water Biodiversity Contamination Plant and Equipment TERRAMIN AUSTRALIA LIMITED SLIDE No. 23
Slide 24: Key Closure Outcomes
Key Closure Outcomes Ensure all underground voids are filled to the extent that subsidence cannot occur at any time after mine closure Ensure that the decline under Bird in Hand Road is backfilled to ensure in perpetuity integrity of the road. The Lessee must ensure that upon mine closure, all
Slide 25: Builds and Structures to remain
Builds and Structures to remain Administration offices, staff amenities and workshop is beneficial for potential viticultural land or similar complying land use 1. Site entrance 2. Sealed carpark 3. Office admin and workshop 4. Vehicle washbay 5. + 6. Existing farmhouse, sheds and dairy building 8
Slide 26: Infrastructure and Hardstand to remain
Infrastructure and Hardstand to remain Stabilised hardstand areas provide opportunity for future build form, storage and vehicle movement 1. Site access stormwater drains 2. Sealed access road 3. Creek crossing 4. Hardstand for future built form - IML consumed as backfill in mine voids 5. Water st
Slide 27: Site Services to remain
Site Services to remain Services terminated for decommissioned infrastructure (underground, cement batching, etc.) 1. Upgraded electrical supply 2. Internal electrical supply 3. Potable mains water supply 4. Non-potable water supply 5. Sewer 6. Communications TERRAMIN AUSTRALIA LIMITED SLIDE No. 2
Slide 28: Revegetation to remain
Revegetation to remain Improved biodiversity for long term benefit 1. Eucalypt woodland preserved with Heritage agreement 2. Perimeter canopy trees 3. Riparian corridor 4. Existing trees 5. Entry road verges 6. Farmhouse and carpark plantings 7. Maze 8. Water storage dams vegetation TERRAMIN AUSTR
Slide 29: Proposed Native Vegetation Heritage Agreement extension
Proposed Native Vegetation Heritage Agreement extension Native Vegetation Heritage Agreement area 1. Existing Heritage listed Chimney 2. Existing Native Vegetation Heritage Agreement area 3. Proposed extension to Native Vegetation Heritage Agreement area 4. Potential former horse drawn “Puddler” r
Slide 30: Before and After
Before and After TERRAMIN AUSTRALIA LIMITED SLIDE No. 30
Slide 31: Before and After
Before and After TERRAMIN AUSTRALIA LIMITED SLIDE No. 31
Slide 32: Riparian Revegetation
Riparian Revegetation TERRAMIN AUSTRALIA LIMITED SLIDE No. 32
Slide 33: Groundwater
Groundwater No drawdown expected if Terramin continue to reinject water into the mine workings during the closure phase This prevents a significant “cone of depression” Can happen if not managed – but not significant Very limited drawdown post-closure associated with the Project ceasing – 0.
Slide 34: Closure Checklist – Practical steps for BIHGP
Closure Checklist – Practical steps for BIHGP 1. Closure design work finalised – in Mining Lease Proposal and Program for Environmental Protection and Rehabilitation 2. Project completion and Closure announced. 3. Underground workings and vent raises/shafts backfilled to ensure site is geotechnicall
Slide 35: Proposed Entrance – to remain
Proposed Entrance – to remain Post-Closure TERRAMIN AUSTRALIA LIMITED SLIDE No. 35
Slide 36: Closure View - Cellardoors
Closure View - Cellardoors Operations Post-Closure TERRAMIN AUSTRALIA LIMITED SLIDE No. 36
Slide 37: Closure View - Cellardoors
Closure View - Cellardoors Operations VIEW ARTWINE CELLARDOOR Post-Closure TERRAMIN AUSTRALIA LIMITED SLIDE No. 37
Slide 38: TERRAMIN AUSTRALIA LIMITED SLIDE No. 38
TERRAMIN AUSTRALIA LIMITED SLIDE No. 38