Aeris Resources Limited · ASX:AIS

Aeris Resources — Investor Presentation (February 2025)

25 slides from Aeris Resources's investor presentation, Feb 28, 2025

  1. Slide 1: Red Cloud Pre-PDAC

    Red Cloud Pre-PDAC February 2025 Presented by: Andre Labuschagne

  2. Slide 2: Disclaimer

    Disclaimer This investor presentation has been prepared by Aeris Resources Limited FUTURE PERFORMANCE AND FORWARD-LOOKING STATEMENTS Aeris confirms that the form and context in which the Competent Person’s (“Aeris” or the “Company”). By attending an investor presentation or This presentation contain

  3. Slide 3: Aeris Resources

    Aeris Resources Weighted to copper Australian mid-tier, base and precious metals FY25 production guidance producer 29 79 47 Cu Au Ag Copper Gold Silver 27-32 kt 50-62koz 200-240koz 2 producing operations (40-48kt copper eq.)1 3 development projects All sites prospective for further discoveries Subst

  4. Slide 4: Aeris Snapshot: Dec 2024

    Aeris Snapshot: Dec 2024 $145m $58m 40-48kt Market cap YTD cash from operations FY25 Cu eq guidance2 $40m $26m $43m Drawn debt Closing cash Liquidity1 1. Includes cash, receivables and undrawn liquidity on the WHSP facility 2. CuEq t = ((Cu Produced x Cu $/t) + (Au Produced x Au $/oz) + (Ag Produced

  5. Slide 5: A simplified, stronger portfolio

    A simplified, stronger portfolio High-grade copper equivalent Resources across 3 projects + 0.5Moz gold in Resource¹ supporting strategic copper growth Assets aligned with strategic copper focus Gold supporting copper growth Tritton Cracow 1.7% Cu eq 0.5Moz Au1 Jaguar 1.3Mt Cu eq1 3.6% Stockman Dive

  6. Slide 6: Cash flow

    Cash flow Strong operating cash flows funding investment into assets Dec YTD Group Cash Flow ($M) 120 9 100 42 80 60 (42) 25 (5) 40 (13) 25 26 (15) 20 - Tritton OCF Mt Colin OCF Jaguar C&M Finance and Other Jun-24 Cracow OCF Capital and Exploration Corporate Dec-24 6 1. OFC = Operating cash flow

  7. Slide 7: Tritton

    Tritton New South Wales

  8. Slide 8: Tritton

    Tritton Strategic, cornerstone asset Strategic location in the Cobar Basin of NSW 430kt copper produced since operations began in 2005 and over 340kt still in Resource1 2,330km prospective tenement package FY25 guidance of 21 – 25kt copper Improving production with addition of open pit ore from Murr

  9. Slide 9: Murrawombie Pit

    Murrawombie Pit Cut back on old pit also provides major rehab saving Stripping commenced in Feb 2025 with contract miner (MacKellar) First ore to mill Q3 FY25 to enable mill to be run at capacity in Q4 FY25 Ore Reserve of 1.3Mt @ 1.3% Cu, 0.2g/t Au1 Waste from cut back used to cap old heap leach pad

  10. Slide 10: Potential production growth

    Potential production growth Tritton is mine-constrained; increased tonnes from new, higher-grade deposits could enable Cu output > 30ktpa 3.0% 2.5% 2.0% Copper grade 1.5% 1.0% 0.5% 0.0% Current ore sources Unmined deposits Reserve Grade1 Resource Grade1 10 1. Refer to Appendix for categories of the

  11. Slide 11: Exploration potential

    Exploration potential Multiple targets provide potential to extend mine life Constellation: high priority, large scale target, resource upgrade and mining studies underway Extensions: Tritton, Murrawombie, Avoca Tank and Budgerygar all still open at depth Kurrajong: high grade deposit, open at depth

  12. Slide 12: Constellation deposit

    Constellation deposit Potential future baseload feed for Tritton mill Located 45km northeast of the Tritton plant Mineral Resource1 of 6.7Mt at 1.9% Cu and 0.6g/t Au Drill program completed in January targeting conversion of inferred resource to indicated in the upper portion of deposit as well as u

  13. Slide 13: Cracow

    Cracow Queensland

  14. Slide 14: Cracow

    Cracow Mature, high-grade gold mine Low-sulphidation epithermal underground gold mine located 500km northwest of Brisbane Conventional crush and grind CIP processing plant Produced +1.5Moz gold since first production in 2004 FY25 guidance 40 – 49koz Au Track record of meeting or exceeding budget Str

  15. Slide 15: Exploration

    Exploration Highly prospective greenfield targets Continuing to drill near mine targets in the Western Vein Field (WVF) for incremental additional ounces Priority conceptual greenfield targets with the potential to host new mineralised structures Western Frontier represents a potential new structura

  16. Slide 16: North Queensland

    North Queensland Queensland

  17. Slide 17: North Queensland

    North Queensland Mining completed; non-core tenement package Mining and processing now completed at Mt Colin Rehabilitation activities underway Part of an attractive 952km2 tenement package including the feasibility-stage Barbara project Divestment process underway 17

  18. Slide 18: Development projects

    Development projects

  19. Slide 19: Jaguar

    Jaguar Brownfield copper/zinc restart opportunity Mineral Resource1 8Mt @ 1.3% Cu, 5.6% Zn, 0.5g/t Au and 65g/t Ag across 4 deposits Transitioned to care and maintenance in Q1 FY24 Potential restart on resources at Bentley with development out to high-grade Turbo lens Restart to include mill and inf

  20. Slide 20: Stockman

    Stockman Concentrator flowsheet for Albion Process Long life, Cu-Zn-Au-Ag project with all primary permits Feasibility study well advanced 12 year mine plan producing at up to 850ktpa1 from a single deposit Potential to extend mine life with other known deposits Currawong mine plan Albion leaching t

  21. Slide 21: Investment highlights

    Investment highlights Company set for growth 40 – 48kt Cu eq1,3 FY25 production guidance of 3 growth projects targeting copper 1.3Mt Cu eq Resource2,3 across 3 projects +500koz Au4 to support the copper strategy Strong operating cash flow funding growth 1. CuEq t = ((Cu Produced x Cu $/t) + (Au Prod

  22. Slide 22: Appendix

    We are /\ciis Appendix

  23. Slide 23: Group Ore Reserves

    Group Ore Reserves PROJECT CATEGORY TONNES (‘000) GRADE CONTAINED METAL Base Metals % Cu % Zn g/t Au g/t Ag kt Cu kt Zn koz Au koz Ag Tritton Proved 5 1.8 - - - 0.1 - - - Probable 2,790 1.5 - 0.3 5 41 - 23 451 Total 2,790 1.5 - 0.3 5 41 - 23 451 Jaguar Proved 90 1.4 8.7 0.8 74 1 8 2 225 Probable 1,0

  24. Slide 24: Group Mineral Resources

    Group Mineral Resources PROJECT CATEGORY TONNES (‘000) GRADE CONTAINED METAL Base Metals % Cu % Zn g/t Au g/t Ag kt Cu kt Zn koz Au koz Ag Tritton Measured 1,300 1.0 - 0.1 3 13 - 4 120 Indicated 11,200 1.4 - 0.3 4 145 - 91 1,280 Inferred 10,000 1.7 - 0.3 4 183 - 137 1,440 Total 22,500 1.5 - 0.3 4 34

  25. Slide 25: Tritton Mineral Resources

    Tritton Mineral Resources PROJECT CATEGORY TONNES (‘000) GRADE CONTAINED METAL Base Metals % Cu g/t Au g/t Ag kt Cu koz Au koz Ag Tritton Measured 1,300 1.0 0.1 3 13 4 120 Indicated 1,500 1.1 0.0 2 16 2 90 Inferred 1,200 1.3 0.2 7 16 10 290 Total 4,000 1.1 0.1 4 46 16 500 Murrawombie Measured - - -