Slide 3: Investment Highlights
INVESTMENT HIGHLIGHTS • Proposed Owner Operated 50 tpd Bio-Oxidation plant. Located in Ponce Enriquez, Ecuador. Can expand modularly. Construction is expected to begin in Q1 2022. • High-grade concentrate feed stock of around 45 grams per ton. PE Project • Bioleach test results showed Gold recovery
Slide 4: The Technology: Our Bugs Eat Rocks!
THE TECHNOLOGY Our Bugs Eat Rocks! 1) Conventional gravity/flotation to remove sulphides from ore/tailings to make high-grade gold/arsenic concentrate • Sulphides are the source of acid release but also contain the valuable metal to be recovered. 2) Bioleaching of arsenopyrite (arsenic/sulphide ore)
Slide 5: Sustainability at Our Core
SUSTAINABILTY AT OUR CORE Bacteria Water The bacteria are naturally Efficient recycling of occurring and harmless to the water from the process. environment and human health. Heavy Metal Recovery Emissions Toxic heavy metals, like arsenic, are No toxic gaseous converted into stable, environmentally
Slide 6: Economic Benefits (Tailings)
ECONOMIC BENEFITS (TAILINGS) • Remediation of tailings at no cost to government • Revenues through the recovery of contained metals — Au, Ag, Cu, Ni, Zn, Co • Local opportunities for work, training, development and the start of a new ‘green metal’ industry. • Lower cost than the alternatives (e.g. p
Slide 7: Capitalization
Current Ownership CAPITALIZATION 13.6% Option 3 Basic Shares Outstanding 141,342,204 Reserved (Options and Warrants) 18,067,260 Management/Directors and 13% Consultants FD-Total Shares Outstanding 159,409,464 Market Capitalization* $14M Ross Orr, CEO and 4.6% President *As of September 22, 2021 @ 0.
Slide 8: Cleantech Industry
CLEANTECH INDUSTRY Operational Sustainable sources of precious metals and Chemical leaching to recover precious metals Sustainable sources of precious metals and Design, development, manufacture and Focus bioremediation. from e-waste and gold bioremediation. commercialization of ores advanced plasma
Slide 9: Board of Directors and Management Team
BOARD OF DIRECTORS Timothy Lewin Ross Orr Walter Cimowski Donald Whalen Jay Richardson Jay Naster Chairman Director, President Director, Audit Director Director, Audit Director, Audit and CEO Committee Committee Committee MANAGEMENT TEAM Ross Orr Louis R. Nagy Gary Williams Dr. Paul C Miller Bernard
Slide 10: Ponce Enriquez Project Local Benefits
PONCE ENRIQUEZ PROJECT Local Benefits ü Providing local processing and better prices to miners. ü Support from the Ministry of Artisanal and Small Miners. • Market uncertainty for existing concentrate buyers/sellers with Low Prices and Delayed Payments for existing arsenic heavy concentrates. • Pote
Slide 11: Ponce Enriquez Local Macro Factors
PONCE ENRIQUEZ LOCAL MACRO FACTORS • October 1, 2022, China will begin to limit the amount of arsenic that can be imported in Au concentrates; similar to copper concentrate import limitations imposed several years ago. • Difficult to find lower arsenic concentrates; lowers gold grades. • Estimated m
Slide 12: Ponce Enriquez Bioleach Test Work Results
PONCE ENRIQUEZ BIOLEACH TEST WORK RESULTS Tail Gold Bio-oxidized Feedstock Feedstock Feedstock Grade After CIL Gold Grade for Gold Recovery Supplied to Gold Head Arsenic Gold CIL processing (%) the Test Grade (g/t) Content (%) Extraction (g/t) (g/t) Conc. 1 + 54.6 16 55.0 2.15 96.1 Conc.3 Conc. 5 21
Slide 13: Ponce Enriquez Project Timeline
PONCE ENRIQUEZ PROJECT TIMELINE CSE:BAC | OTCBB:BCCEF
Slide 14: Ponce Enriquez Project Schematic
PONCE ENRIQUEZ PROJECT SCHEMATIC CSE:BAC | OTCBB:BCCEF
Slide 15: Ponce Enriquez Project Cost Estimate
PONCE ENRIQUEZ PROJECT COST EST. Bioleach Test Work USD $150,000 Feasibility Study USD $125,000 Engineering and Pre-Construction Work USD $250,000 18 MONTHS Permitting USD $100,000 Construction USD $10,000,000 Total USD $10.65M • A 50 tpd plant, processing 1.5 ounces of gold per ton of feed, would p
Slide 16: Colombia Gold/Platinum Tailings
COLUMBIA GOLD/PLATINUM TAILINGS • Approached by private, US-based miner working in Colombia. • Actlabs (Canada) assayed material provided by the miner from the tailings. • 17 gpt Gold and 34 gpt Platinum in 100,000 tons (~$200M total metal) • Next step is 3rd party verification as samples not arm’s
Slide 17: Long Term Project Potential
LONG TERM PROJECT POTENTIAL • Colombia • Central America • Southern Peru-Puna • Northern Peru- Piura • Chile • Anywhere arsenic is associated with gold/silver/copper CSE:BAC | OTCBB:BCCEF
Slide 18: Project Lifecycle
PROJECT LIFECYCLE • Engagement: BacTech engages local parties to evaluate the potential for a project. • Feasibility: BacTech performs assay testing, bioleaching test work and feasibility study to confirm the project is economically viable. • Build & Operation: BacTech designs and builds the plant a