Bactech Environmental Corp. · CSE:BAC

Bactech Environmental — Investor Presentation (September 2021)

19 slides from Bactech Environmental's investor presentation, September 2021

  1. Slide 1: Leading the Way for Sustainable Mineral Supply Chains

    LEADING THE WAY FOR SUSTAINABLE MINERAL SUPPLY CHAINS CSE:BAC | OTCBB:BCCEF

  2. Slide 2: Legal Disclaimer

    LEGAL DISCLAIMER This presentation contains certain forward-looking statements within the meaning of Canadian securities legislation (the “Forward-looking Statements”) and within the meaning of Section 21E of the United States Securities Exchange Act of 1934, as amended. Although the Company believe

  3. Slide 3: Investment Highlights

    INVESTMENT HIGHLIGHTS • Proposed Owner Operated 50 tpd Bio-Oxidation plant. Located in Ponce Enriquez, Ecuador. Can expand modularly. Construction is expected to begin in Q1 2022. • High-grade concentrate feed stock of around 45 grams per ton. PE Project • Bioleach test results showed Gold recovery

  4. Slide 4: The Technology: Our Bugs Eat Rocks!

    THE TECHNOLOGY Our Bugs Eat Rocks! 1) Conventional gravity/flotation to remove sulphides from ore/tailings to make high-grade gold/arsenic concentrate • Sulphides are the source of acid release but also contain the valuable metal to be recovered. 2) Bioleaching of arsenopyrite (arsenic/sulphide ore)

  5. Slide 5: Sustainability at Our Core

    SUSTAINABILTY AT OUR CORE Bacteria Water The bacteria are naturally Efficient recycling of occurring and harmless to the water from the process. environment and human health. Heavy Metal Recovery Emissions Toxic heavy metals, like arsenic, are No toxic gaseous converted into stable, environmentally

  6. Slide 6: Economic Benefits (Tailings)

    ECONOMIC BENEFITS (TAILINGS) • Remediation of tailings at no cost to government • Revenues through the recovery of contained metals — Au, Ag, Cu, Ni, Zn, Co • Local opportunities for work, training, development and the start of a new ‘green metal’ industry. • Lower cost than the alternatives (e.g. p

  7. Slide 7: Capitalization

    Current Ownership CAPITALIZATION 13.6% Option 3 Basic Shares Outstanding 141,342,204 Reserved (Options and Warrants) 18,067,260 Management/Directors and 13% Consultants FD-Total Shares Outstanding 159,409,464 Market Capitalization* $14M Ross Orr, CEO and 4.6% President *As of September 22, 2021 @ 0.

  8. Slide 8: Cleantech Industry

    CLEANTECH INDUSTRY Operational Sustainable sources of precious metals and Chemical leaching to recover precious metals Sustainable sources of precious metals and Design, development, manufacture and Focus bioremediation. from e-waste and gold bioremediation. commercialization of ores advanced plasma

  9. Slide 9: Board of Directors and Management Team

    BOARD OF DIRECTORS Timothy Lewin Ross Orr Walter Cimowski Donald Whalen Jay Richardson Jay Naster Chairman Director, President Director, Audit Director Director, Audit Director, Audit and CEO Committee Committee Committee MANAGEMENT TEAM Ross Orr Louis R. Nagy Gary Williams Dr. Paul C Miller Bernard

  10. Slide 10: Ponce Enriquez Project Local Benefits

    PONCE ENRIQUEZ PROJECT Local Benefits ü Providing local processing and better prices to miners. ü Support from the Ministry of Artisanal and Small Miners. • Market uncertainty for existing concentrate buyers/sellers with Low Prices and Delayed Payments for existing arsenic heavy concentrates. • Pote

  11. Slide 11: Ponce Enriquez Local Macro Factors

    PONCE ENRIQUEZ LOCAL MACRO FACTORS • October 1, 2022, China will begin to limit the amount of arsenic that can be imported in Au concentrates; similar to copper concentrate import limitations imposed several years ago. • Difficult to find lower arsenic concentrates; lowers gold grades. • Estimated m

  12. Slide 12: Ponce Enriquez Bioleach Test Work Results

    PONCE ENRIQUEZ BIOLEACH TEST WORK RESULTS Tail Gold Bio-oxidized Feedstock Feedstock Feedstock Grade After CIL Gold Grade for Gold Recovery Supplied to Gold Head Arsenic Gold CIL processing (%) the Test Grade (g/t) Content (%) Extraction (g/t) (g/t) Conc. 1 + 54.6 16 55.0 2.15 96.1 Conc.3 Conc. 5 21

  13. Slide 13: Ponce Enriquez Project Timeline

    PONCE ENRIQUEZ PROJECT TIMELINE CSE:BAC | OTCBB:BCCEF

  14. Slide 14: Ponce Enriquez Project Schematic

    PONCE ENRIQUEZ PROJECT SCHEMATIC CSE:BAC | OTCBB:BCCEF

  15. Slide 15: Ponce Enriquez Project Cost Estimate

    PONCE ENRIQUEZ PROJECT COST EST. Bioleach Test Work USD $150,000 Feasibility Study USD $125,000 Engineering and Pre-Construction Work USD $250,000 18 MONTHS Permitting USD $100,000 Construction USD $10,000,000 Total USD $10.65M • A 50 tpd plant, processing 1.5 ounces of gold per ton of feed, would p

  16. Slide 16: Colombia Gold/Platinum Tailings

    COLUMBIA GOLD/PLATINUM TAILINGS • Approached by private, US-based miner working in Colombia. • Actlabs (Canada) assayed material provided by the miner from the tailings. • 17 gpt Gold and 34 gpt Platinum in 100,000 tons (~$200M total metal) • Next step is 3rd party verification as samples not arm’s

  17. Slide 17: Long Term Project Potential

    LONG TERM PROJECT POTENTIAL • Colombia • Central America • Southern Peru-Puna • Northern Peru- Piura • Chile • Anywhere arsenic is associated with gold/silver/copper CSE:BAC | OTCBB:BCCEF

  18. Slide 18: Project Lifecycle

    PROJECT LIFECYCLE • Engagement: BacTech engages local parties to evaluate the potential for a project. • Feasibility: BacTech performs assay testing, bioleaching test work and feasibility study to confirm the project is economically viable. • Build & Operation: BacTech designs and builds the plant a

  19. Slide 19: Thank You!

    BacTech Environmental Corporation Suite 409, 37 King St. East Toronto, Ontario M5C1E9 www.bactechgreen.com Ross Orr, President & CEO THANK YOU! borr@bactechgreen.com Office: 416-813-0303 ext. 222 CSE:BAC | OTCBB: BCCEF CSE:BAC | OTCBB:BCCEF

BacTech Environmental — Investor Presentation (September 2021) on 6ix