Terramin Australia Limited · ASX:TZN
Terramin Australia — Shareholder Meeting (May 2018)
17 slides from Terramin Australia's shareholder meeting presentation, May 30, 2018
Slide 1: Terramin Australia Limited Annual General Meeting
TERRAMIN AUSTRALIA LIMITED Annual General Meeting 30 May 2018
Slide 2: Disclaimer & Competent Person Statement
Disclaimer & Competent Person Statement Disclaimer This presentation has been prepared by Terramin Australia Limited (Terramin). It is current as at the date of this presentation. It contains information in a summary form and should be read in conjunction with Terramin’s other periodic and continuou
Slide 3: About Terramin Australia Limited
About Terramin Australia Limited Significant base metal and gold development portfolio Tala Hamza Zinc Project Bird-in-Hand Gold Project Substantial South Australian multi-commodity exploration tenement portfolio Management and Board with extensive practical and commercial experience in all
Slide 4: 2017 Highlights
2017 Highlights Tala Hamza Zinc Project Project design and technical studies have been completed. Definitive Feasibility Study completed. Environmental Impact Studies completed. Review and approval processes with Algerian Government well advanced. Bird in Hand Gold Project Draft Bird-i
Slide 5: Tala Hamza Zinc Project
Tala Hamza Zinc Project World class resource containing 3.9 million tonnes of zinc and lead - Resource of 68.6 million tonnes at 5.7% zinc plus lead. Joint venture with Algerian government owned entity (65% Terramin). Infrastructure including deep water port and international airport. Low op
Slide 6: Tala Hamza Zinc Project
Tala Hamza Zinc Project Design of project has been finalised. The design incorporates revised elements which significantly enhance the project such as dry stacking of tailings and reduced project footprint. Definitive Feasibility Study in final stages of review. Environmental Impact Study fi
Slide 7: Tala Hamza Zinc Project
Tala Hamza Zinc Project Low upfront capital relative to scale of project – Availability of local infrastructure reduces capital expenditure. Competitive operating costs – low labour and energy costs drive low cash costs. Potential expansion – strong exploration upside at Tala Hamza and in the
Slide 8: Global Zinc Markets
Global Zinc Markets After the significant reduction in mine supply in 2015 and 2016, there was an increase in production in 2017. New mine production (Dugald River, Mt Isa, Castellanos, and Gamsberg) is expected to result in a modest increase in production up to 2020. Only a small increase in
Slide 9: Global Zinc Markets
Global Zinc Markets Zinc market is in deficit and has been Zinc Stocks and Prices consuming zinc stockpiles since 2012. Significant cumulative rundown of zinc stocks. Small surplus Q1 2018 (25kt). However, ILZSG forecast deficit in FY2018. Zinc price very sensitive to supply disruptions. S
Slide 10: Global Zinc Markets
Global Zinc Markets Zinc market remains supply constrained. Underinvestment in zinc exploration and development. New mines are lower grade and older mines are reaching the end of their commercial lives. Long development lead times mean there is insufficient potential supply in the medium ter
Slide 11: Gold AUD Price Remains High
Gold AUD Price Remains High Gold price remains at historic highs in Australian Gold Production and Price AUD terms. Australian gold price averaged A$1,754 a troy ounce in 2016–17. Highest level since the recent historical peak in 2011–12. Growth in demand for gold 1.8% CAGR driven largely by
Slide 12: Adelaide Hills Projects
Adelaide Hills Projects 100% Terramin. Bird-in-Hand Gold Project – Resource of 252,000 ounces at 13.3gt. Angas Zinc Mine Processing Plant – Existing 400,000 tonnes per annum base metals processing plant and tailings dam. 3,750 square kilometres of exploration tenements – including over 300 h
Slide 13: Bird-in-Hand Gold Project
Bird-in-Hand Gold Project High grade mine based on 13g/tonne gold resource. Low start up capital. Processing through existing Angas Zinc Mine plant. Engineering studies have been completed. Approval process well advanced with draft Mining Lease application lodged and feedback being receive
Slide 14: Bird in Hand Gold Project Exploration Potential
Bird in Hand Gold Project Exploration Potential Simple orebody structure means lower mining costs. Existing Bird in Hand gold deposit is open at depth. Nearby historic mines “Bird- Extended” and the “Ridge” recorded historical high grade production. Potential for further discoveries. TERRAMI
Slide 15: Strong Growth potential
Strong Growth potential Tala Hamza Zinc Project – Algeria (65%) Excellent relationship with JV partner and government. Revised DFS and EIS based on new project structure. On path towards decision to mine and approval. Bird in Hand Gold Project - South Australia (100%) 252,000 ounce high
Slide 16: Focus for 2018
Focus for 2018 Obtain approval for the development of the Tala Hamza Zinc Project. Release technical and economic Feasibility Study outcomes for Tala Hamza. Progress land acquisition and financing options with Algerian government. Increased capability for Tala Hamza project development. Lo
Slide 17: Terramin Australia Limited Annual General Meeting
TERRAMIN AUSTRALIA LIMITED Annual General Meeting 30 May 2018