Slide 1: Bird-in-Hand Gold Project
Bird-in-Hand Gold Project Terramin Australia Limited Traffic Focus Group Discussion 16th August 2017 Presented by: Martin Janes Chief Executive Officer Terramin Australia Limited TERRAMIN AUSTRALIA LIMITED SLIDE No. 1

Slide 2: Terramin Australia Limited
Terramin Australia Limited Adelaide Headquartered South Australian company – ASX listed Market Capitalisation $320 million Operating in Adelaide Hills since 2003 qBird-in-Hand Gold Project – Resource of 252,000 ounces at 13.3g/t (588kt) q a low impact conventional underground mining operation at Woo

Slide 3: Project History
Project History q 1880’s Bird-in-Hand Mine (BiH) one of 17 Goldmines in Woodside q BiH produced 10,000oz of the 30,000oz from the area q Modern exploration commenced in 1997 (Capricorn) q Terramin purchased the project from Maximus in 2013 q Commenced project design, community engagement and environ

Slide 4: Woodside Project area
Woodside Project area Bird-in-Hand Site q 2 km east of Woodside q Historic mining in 1881-89 q 5 Shaft and drifts excavated chasing high grade gold q Victoria Shaft extends 120m q Mineral Claim (MC) granted in 2009 under Maximus Resources q Terramin has applied for MC in own name to progress Mining

Slide 5: Proposed Mine Concept
Proposed Mine Concept q Establish a small low impact underground mine to access the gold bearing rock at Woodside q Transport the ore to Angas processing plant (32km South) q Produce a gold concentrate for domestic or export market q Haulage component § Concept production rate 140,000tpa § Concept h

Slide 6: Underground Mine - tunnelling
Underground Mine - tunnelling Ø Mining activities will occur 24 hrs per day underground. Ø Ore will be stockpiled and only transported during the day TERRAMIN AUSTRALIA LIMITED SLIDE No. 6

Slide 7: Underground Mine Design
Underground Mine Design Ø Ore is brought to surface using mine trucks and stockpiled in a surface silo. Ø Ore is then reloaded into conventional road trucks and transported to Strathalbyn TERRAMIN AUSTRALIA LIMITED SLIDE No. 7

Slide 8: Site Layout
Site Layout View from neighbouring cellar door looking East Underground mine will not be seen, surface infrastructure will be designed to blend into the existing environment. TERRAMIN AUSTRALIA LIMITED SLIDE No. 8

Slide 9: Bird in Hand → Angas Zinc Mine
Bird in Hand → Angas Zinc Mine q NO GOLD PROCESSING AT WOODSIDE – No tailings q Road Haulage of ore to Angas Mine Processing Plant q Licensed tailings storage facility at Strathalbyn q ~50km along existing roads TERRAMIN AUSTRALIA LIMITED SLIDE No. 9

Slide 10: General Access Vehicle
General Access Vehicle GAV : <19m length Access all roads and property § Semi-trailer or § Truck and Dog Trailer TERRAMIN AUSTRALIA LIMITED SLIDE No. 10

Slide 11: Plan to progress to Mining Lease
Plan to progress to Mining Lease DPC Process (Regulators) WE ARE MINING HERE COMMENCEMENT NEW DRAFT MINING MINING GOV. MINING DRAFT OF APPROVAL COMPLIANCE POST- MINERAL LEASE LEASE CONSULTA LEASE PROGRAM FOR OF PEPR OF MINING MINING CLAIM PROPOSAL PROPOSAL TION DECISION ENV. OPERATIONS CLOSURE LODGE

Slide 12: Understanding the Environment
Understanding the Environment q Critical component to understand for Federal (EPBC Act) State and Local Government approvals q Small footprint (total 11ha, operational 4.5ha) – low impact (No native veg clearance required) q Baseline data collection commenced December 2013 § Installed weather statio

Slide 13: Proof of Traffic concepts
Proof of Traffic concepts Tonkin Consulting qType of road haul truck qAnalysis of road haul truck movements qAnalysis of haulage routes § Suitability § Safety § Existing conditions qHaulage Exclusions - understanding § Peak traffic periods § Overnight exclusion § Disaster plan – bushfire, accident,
Source: Internet Archive copy of terramin.com.au
More decks from Terramin Australia Limited
Shareholder Meeting (May 2026)15 slides · May 2026
Shareholder Meeting (May 2025)12 slides · May 2025
Shareholder Meeting (May 2022)12 slides · May 26, 2022
Investor Presentation (October 2019)23 slides · Oct 31, 2019
Investor Presentation (October 2019)22 slides · Oct 30, 2019
Technical Presentation (June 2019)20 slides · June 2019