    Bird-in-Hand Gold Project Terramin Australia Limited Traffic Focus Group Discussion 16th August 2017 Presented by: Martin Janes Chief Executive Officer Terramin Australia Limited TERRAMIN AUSTRALIA LIMITED SLIDE No. 1

  2. Slide 2: Terramin Australia Limited

    Slide 2: Terramin Australia Limited

    Terramin Australia Limited Adelaide Headquartered South Australian company – ASX listed Market Capitalisation $320 million Operating in Adelaide Hills since 2003 qBird-in-Hand Gold Project – Resource of 252,000 ounces at 13.3g/t (588kt) q a low impact conventional underground mining operation at Woo

  3. Slide 3: Project History

    Slide 3: Project History

    Project History q 1880’s Bird-in-Hand Mine (BiH) one of 17 Goldmines in Woodside q BiH produced 10,000oz of the 30,000oz from the area q Modern exploration commenced in 1997 (Capricorn) q Terramin purchased the project from Maximus in 2013 q Commenced project design, community engagement and environ

  4. Slide 4: Woodside Project area

    Slide 4: Woodside Project area

    Woodside Project area Bird-in-Hand Site q 2 km east of Woodside q Historic mining in 1881-89 q 5 Shaft and drifts excavated chasing high grade gold q Victoria Shaft extends 120m q Mineral Claim (MC) granted in 2009 under Maximus Resources q Terramin has applied for MC in own name to progress Mining

  5. Slide 5: Proposed Mine Concept

    Slide 5: Proposed Mine Concept

    Proposed Mine Concept q Establish a small low impact underground mine to access the gold bearing rock at Woodside q Transport the ore to Angas processing plant (32km South) q Produce a gold concentrate for domestic or export market q Haulage component § Concept production rate 140,000tpa § Concept h

  6. Slide 6: Underground Mine - tunnelling

    Slide 6: Underground Mine - tunnelling

    Underground Mine - tunnelling Ø Mining activities will occur 24 hrs per day underground. Ø Ore will be stockpiled and only transported during the day TERRAMIN AUSTRALIA LIMITED SLIDE No. 6

  7. Slide 7: Underground Mine Design

    Slide 7: Underground Mine Design

    Underground Mine Design Ø Ore is brought to surface using mine trucks and stockpiled in a surface silo. Ø Ore is then reloaded into conventional road trucks and transported to Strathalbyn TERRAMIN AUSTRALIA LIMITED SLIDE No. 7

  8. Slide 8: Site Layout

    Slide 8: Site Layout

    Site Layout View from neighbouring cellar door looking East Underground mine will not be seen, surface infrastructure will be designed to blend into the existing environment. TERRAMIN AUSTRALIA LIMITED SLIDE No. 8

  9. Slide 9: Bird in Hand → Angas Zinc Mine

    Slide 9: Bird in Hand → Angas Zinc Mine

    Bird in Hand → Angas Zinc Mine q NO GOLD PROCESSING AT WOODSIDE – No tailings q Road Haulage of ore to Angas Mine Processing Plant q Licensed tailings storage facility at Strathalbyn q ~50km along existing roads TERRAMIN AUSTRALIA LIMITED SLIDE No. 9

  10. Slide 10: General Access Vehicle

    Slide 10: General Access Vehicle

    General Access Vehicle GAV : <19m length Access all roads and property § Semi-trailer or § Truck and Dog Trailer TERRAMIN AUSTRALIA LIMITED SLIDE No. 10

  11. Slide 11: Plan to progress to Mining Lease

    Slide 11: Plan to progress to Mining Lease

    Plan to progress to Mining Lease DPC Process (Regulators) WE ARE MINING HERE COMMENCEMENT NEW DRAFT MINING MINING GOV. MINING DRAFT OF APPROVAL COMPLIANCE POST- MINERAL LEASE LEASE CONSULTA LEASE PROGRAM FOR OF PEPR OF MINING MINING CLAIM PROPOSAL PROPOSAL TION DECISION ENV. OPERATIONS CLOSURE LODGE

  12. Slide 12: Understanding the Environment

    Slide 12: Understanding the Environment

    Understanding the Environment q Critical component to understand for Federal (EPBC Act) State and Local Government approvals q Small footprint (total 11ha, operational 4.5ha) – low impact (No native veg clearance required) q Baseline data collection commenced December 2013 § Installed weather statio

  13. Slide 13: Proof of Traffic concepts

    Slide 13: Proof of Traffic concepts

    Proof of Traffic concepts Tonkin Consulting qType of road haul truck qAnalysis of road haul truck movements qAnalysis of haulage routes § Suitability § Safety § Existing conditions qHaulage Exclusions - understanding § Peak traffic periods § Overnight exclusion § Disaster plan – bushfire, accident,

Source: Internet Archive copy of terramin.com.au