Vulcan Energy Resources Ltd. · ASX:VUL

Vulcan Energy Resources — Investor Presentation (June 2025)

26 slides from Vulcan Energy Resources's investor presentation, Jun 4, 2025

  1. Slide 1: Investor Presentation June 2025

    For personal use only Investor Presentation DETERMINED FOR A June 2025 ASX/FSE: VUL BETTER TOMORROW

  2. Slide 2: Disclaimer

    DISCLAIMER1 Disclaimer, acknowledgement and agreement. Vulcan, to the maximum extent permitted by law, expressly excludes and disclaims all liability (including, without limitation, any liability arising out of fault or negligence on the part of any person) for any direct, indirect, consequential or

  3. Slide 3: Corporate Snapshot

    CORPORATE SNAPSHOT AN INTEGRATED RENEWABLE For personal use only ENERGY AND LITHIUM COMPANY ASX/FSE Prime VUL Standard Shares on ~219m issue Market ca. €469m (A$837m)2 Capitalisation1 CLIMATE CHAMPION Cash3 €78.8m (~A$141m) Dr Francis Wedin ~8% Top HPPL ~6.5% DETERMINED shareholders CIMIC Group ~6%

  4. Slide 4: Investment Highlights

    INVESTMENT HIGHLIGHTS Low cost, sustainable and optimally positioned for EU market ✓ Globally significant project with an initial 30-year project life just For personal use only from Phase One, and 27.7 Mt LCE Resource1 ✓ Low-cost, energy-generative lithium project benefiting from naturally-heated b

  5. Slide 5: World-Class Lithium & Geothermal District

    Industrie-Park Höchst Downstream LHM production Ability to expand to 3 phases WORLD-CLASS LITHIUM & GEOTHERMAL DISTRICT Frankfurt Ability to expand with low cost, sustainable production • Global tier-one lithium resource, and largest in Europe: 27.7 Mt LCE estimated in 10 of Vulcan’s 17 licences alo

  6. Slide 6: Powering Ahead: Europe's Battery Projects on the Rise

    POWERING AHEAD: EUROPE’S BATTERY PROJECTS ON THE RISE No existing supply of lithium chemicals from Europe – Vulcan vital to secure local supply The European battery industry is robust and # Owner O p e r a t i n g cell plants Status European Cell (LHS) a n d C A M plants # Owner Status ( R HS) O p e

  7. Slide 7: Result: European Market Structurally Short of Lithium

    RESULT: EUROPEAN MARKET STRUCTURALLY SHORT OF LITHIUM Lithium supply in a structurally short market Global Supply / Demand Balance For personal use only Expected global supply shortfall for LHM relative to growth rates in lithium battery production Supply/demand balance even more acute in Europe, wh

  8. Slide 8: Phase One: A Snapshot

    PHASE ONE: A SNAPSHOT Lionheart Phase One in figures1 €3.9bn 27.8% €705m For personal use only Pre-tax NPV Pre-tax IRR Average revenues p.a. Vulcan’s Lionheart produces both renewable geothermal energy and lithium hydroxide 24kt LHM for electric vehicle (EV) batteries from the 27.7mt LCE 30 years 27

  9. Slide 9: Recent Key Lionheart Project Achievements

    RECENT KEY LIONHEART PROJECT ACHIEVEMENTS A transformational period for the Project ✓ Start of production at Vulcan’s downstream lithium hydroxide optimisation plant For personal use only ✓ Vulcan awarded €100m grant by Germany’s Federal Ministry of Economics and Climate Protection for the HEAT4LAND

  10. Slide 10: Integrated Brine-to-Battery Solution

    INTEGRATED BRINE-TO-BATTERY SOLUTION Renewable energy driving sustainable lithium production 275GWh power LiCl concentrate for 24,000tpa Phase one 560GWh heat1 24,000tpa LHM equivalent LHM1 2. Well 3. Geothermal 4. Lithium Extraction Plant 5. Central Lithium Plant Electric For personal use only site

  11. Slide 11: Vulcan's Phase One Project: Lionheart

    VULCAN'S PHASE ONE PROJECT: LIONHEART Low cost, sustainable integrated lithium and energy production from Europe, for Europe 2 3 For personal use only 4 1 11 1 Vulcan’s 100% owned Insheim Geothermal Power Plant and wells 2 Operating well site and Lithium 3 G-LEP – Option agreement signed to secure s

  12. Slide 12: Europe's First Domestic Resource to LHM Supply Chain Is Proven

    EUROPE’S FIRST DOMESTIC RESOURCE TO LHM SUPPLY CHAIN IS PROVEN LEOP and CLEOP offer a strategically-located, integrated lithium extraction and refining solution CLEOP - Operational Central Lithium Electrolysis CLEOP Optimisation Plant Frankfurt Phase One ++ downstream • Production began in November

  13. Slide 13: Targeting the Lowest Quartile of the Lithium Cost Curve

    VULCAN WILL BE TARGETING THE LOWEST QUARTILE OF THE LITHIUM COST CURVE Powered by low cost, highly efficient A-DLE production that leverages renewable heat Global projected lithium hydroxide C1 cost curve For personal use only Brine Integrated Spodumene - RoW Integrated Mica Integrated Spodumene - A

  14. Slide 14: Supplying the European Auto Industry

    - SUPPLYING THE EUROPEAN AUTO INDUSTRY Fully contracted lithium production drives pricing stability1 • Low counterparty risk: high quality European-focused offtake partners For personal use only • Long term relationships: all offtake agreements binding, take-or-pay, with agreed pricing mechanisms, 5

  15. Slide 15: EPCM Partner Validation Exercise Completed

    EPCM PARTNER VALIDATION EXERCISE COMPLETED Improved scope definition leading to reduced uncertainty and risk during execution, all with no material change to CAPEX • EPCM/ integrator: review of scope, cost and schedule, validating the BES, with For personal use only no material increase in capital r

  16. Slide 16: Phase One Financing

    PHASE ONE FINANCING1 Vulcan continues to see strong support from the public and private sector Targeted FID December 2024 H2 2025 For personal use only Renewable Lithium Technology €879m (~A$1.45bn) conditional debt commitment letter signed Total Project funding package ~€2.2bn in with Export Financ

  17. Slide 17: A Clear Leader in Sustainability

    A CLEAR LEADER IN SUSTAINABILITY Phase One targets: For personal use only Produce enough lithium for ca. 500,000 electric vehicles p.a.2 Avoid 10Mt CO2 eq. through decarbonising the lithium supply chain3 Targeting renewable heat for ca. 90,000 Environmental and Social Impact Assessment people4 (ESIA

  18. Slide 18: Pipeline Progress: Decarbonising the World's Largest Chemical Site

    PIPELINE PROGRESS: DECARBONISING THE WORLD’S LARGEST CHEMICAL SITE1 A blueprint for Vulcan's future phase developments to support Europe's energy transition Phase One ++ downstream For personal use only Central Lithium Plant planned location Frankfurt • Owner of lithium production • Future heat offt

  19. Slide 19: The Key to Unlock Low-Cost Western A-DLE Lithium Globally

    – THE KEY TO UNLOCK LOW-COST WESTERN A-DLE LITHIUM GLOBALLY Opportunity to grow VULSORB® technology business - a high-performance bankable A-DLE technology offering several sustainability benefits in a growing lithium brine market For personal use only High performance Commercially Environmentally F

  20. Slide 20: Key Targets for 2025

    KEY TARGETS FOR 2025 Focus on maintaining strong momentum ✓ Production of battery quality Lithium Hydroxide Monohydrate (LHM) at CLEOP For personal use only ✓ EU Strategic Project status ✓ Commencement of well execution o Decision(s) on government funding approval processes o Finalising project fina

  21. Slide 21: May 27, 2025: Start of New Phase One Production Wells

    For personal use only MAY 27, 2025: START OF NEW PHASE ONE PRODUCTION WELLS NEAR LANDAU, GERMANY @VulcanEnergyRes http://v-er.eu 21 21 21

  22. Slide 22: Board of Directors

    BOARD OF DIRECTORS Major project, technical and finance experience at Board and Executive level Executive Directors For personal use only Cris Moreno Dr Francis Wedin Felicity Gooding Managing Director and Executive Chair, Founder Group CEO Executive Director and Group CFO Non-Executive Directors An

  23. Slide 23: Appendices

    For personal use only APPENDICES

  24. Slide 24: Appendix 1: Disclaimer

    APPENDIX 1: DISCLAIMER No investment or financial product advice. This Presentation, and the information provided in it, does not constitute, and is not intended to constitute, financial product or investment advice, or a recommendation to acquire Vulcan Shares, nor does it constitute, and is not in

  25. Slide 25: Appendix 1: Disclaimer cont.

    APPENDIX 1: DISCLAIMER CONT. Ore Reserves and Mineral Resources Reporting. It is a requirement of the ASX Listing Rules that the reporting of ore reserves and mineral resources in Australia comply with the Joint Ore Reserves Committee's Australasian Code for Reporting of Mineral Resources and Ore Re

  26. Slide 26: Appendix 2: LCA Assumptions

    APPENDIX 2: LCA ASSUMPTIONS All foreground data for the ISO compliant Life Cycle Assessment (LCA) is sourced from Vulcan’s 2023 Bridging Engineering Study. The process design is assumed to be fully electrified. No fossil fuels are directly burned on site in the lithium production process. All backgr

Vulcan Energy Resources — Investor Presentation (June 2025) on 6ix